Lambda 20/Lambda 40 Installation and Maintenance Guide - VTP UP
Lambda 20/Lambda 40 Installation and Maintenance Guide - VTP UP
Lambda 20/Lambda 40 Installation and Maintenance Guide - VTP UP
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Lambda</strong> <strong>20</strong>, <strong>Lambda</strong> <strong>40</strong> UV/Vis Spectrometers• A suitable source of electrical power should be located in the vicinity of theinstrument.Electrical power must be available at a proper earth-grounded 3-wire electricaloutlet.Please refer to Technical Data on page 83 for the electrical ratings of thespectrometer.• The st<strong>and</strong>ard sample compartment baseplates have drain holes in them to runoff spilled liquids to the benchtop underneath the instrument. You can place asheet of thick filter paper under the instrument, if required.26 cmFront view65 cmRight side view56 cmFigure 4 Space Requirements24