12.07.2015 Views

Lambda 20/Lambda 40 Installation and Maintenance Guide - VTP UP

Lambda 20/Lambda 40 Installation and Maintenance Guide - VTP UP

Lambda 20/Lambda 40 Installation and Maintenance Guide - VTP UP

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Basic <strong>Installation</strong>Basic <strong>Installation</strong>OverviewFor spectrometers with installation, the initial installation will be performed by aPerkinElmer service representative. After receipt of the instrument, please contactyour PerkinElmer office or representative for further information.For spectrometers without installation, you can easily install the instrument byfollowing the directions given in the table below.If you intend to use accessories, for example a cell changer or sipper, refer toAccessory <strong>Installation</strong> on page 39 to install these accessories.Preparing the Working AreaFor maximum stability <strong>and</strong> minimum maintenance observe the followingrequirements when siting the instrument:• A firm base free from vibration.• Enough space around <strong>and</strong> underneath the instrument for efficient aircirculation.• A constant temperature between 15 ºC <strong>and</strong> 35 ºC.• Constant humidity between <strong>20</strong>% <strong>and</strong> 80% relative humidity.• An atmosphere free from dust <strong>and</strong> corrosive fumes.• Keep out of direct sunlight. Illumination with diffuse lighting is ideal.23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!