12.07.2015 Views

cosco shipyard group (panda news) - tj giavridis marine services co ...

cosco shipyard group (panda news) - tj giavridis marine services co ...

cosco shipyard group (panda news) - tj giavridis marine services co ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Offshore 3DDD starting testsOn April 19th, The Dalian Develop Drillship successfully<strong>co</strong>mpleted starting tests for its No. 1 generator set atCOSCO Dalian Shipyard. This marks the project enteringinto its equipment <strong>co</strong>mmissioning stage.FSO “Geudondong” LQ shift onboardSeadrill T-17 keel layingMT Geudondong is a tankerto-FSO<strong>co</strong>nversion project forthe Indonesian owner, PertaminaShipping. The main <strong>co</strong>nversionjobs are the addition of the newliving quarter module, helideckfabrication and E/R <strong>co</strong>nversion.From 10th to 14th of March, theyard finished the shifting of thenew living quarters and helideckfrom a barge onboard the FSOsuccessfully and ac<strong>co</strong>rding toschedule. They weigh about440 tonnes and 155 tonnesrespectively and the capacity ofthe living quarters is 150 persons.Following the installation of theliving quarters onboard, the yardare now <strong>co</strong>ntinuing with thepainting, piping, ceiling, floor,and furniture etc. Also, variousmechanical equipment items arenow being installed ac<strong>co</strong>rding tothe schedule. The yard are nowplanning the <strong>co</strong>mmissioning andtesting for all systems during thenext phase of work.N370 successfully launched and dockedCOSCO Nantong Shipyardrecently achieved huge successwith the keel laying of the SeadrillT-17 drilling tender, the third tenderbarge built by the yard for Seadrill.The precision <strong>co</strong>ntrol teamin Hull department optimizedt h e i r c u t t i n g p r o g r a m a n dimproved ship precision <strong>co</strong>ntrol byanalyzing procedure <strong>co</strong>mpensationand margins, calculating theappropriate erection bias, closuredifference, assembly allowance,assembly gap and other datato <strong>co</strong>mplete the “whole ship nomargin” keel laying.On March 23rd, the windturbine installation vessel, beingdesigned and built for the Danishowner A2SEA by COSCO NantongShipyard, was successfully launched.The vessel measures 132.34min length, 39m in depth and isable to operate in 45m of water.Equipped with a DPII systemand a special VOITH thruster,the vessel has outstandingmaneuverability in shallow waters.After launching, the number 3retractable propeller was installedon “Yutong 8” barge.On April 8th, the vessel wassuccessfully docked at the QidongOffshore Base ready for the yardto <strong>co</strong>mplete the erection of thefour legs, 800T crane installationand system <strong>co</strong>mmissioning andother projects.OFFSHORE PROJECTS ON PROGRESS150M SSBDDDOCTABUOYGM4000T-15 DRILLING TENDER BARGERT-16 DRILLING TENDER BARGERT-17 DRILLING TENDER BARGERSEA INSTALLEROCTABUOY TOPSIDE MODULELETOURNEAU WORKHORSE 1LETOURNEAU WORKHORSE 2SEVAN 650 3#SEVAN 650 4#

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!