12.07.2015 Views

TM9-2815-226-34-1 - JATONKAM35s HOME ON THE WEB

TM9-2815-226-34-1 - JATONKAM35s HOME ON THE WEB

TM9-2815-226-34-1 - JATONKAM35s HOME ON THE WEB

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TM 9-<strong>2815</strong>-<strong>226</strong>-<strong>34</strong>-1(m)(n)(o)(p)(q)(r)Check thrust surface after each cut to ensure proper finish is attained.Remove T-handle drive assembly.Remove depth setting collar assembly.Remove tool bit holder.Remove boring bar and centering rings.Clean thrust bearing area.i. Boring bar bridges installation.NOTEIf centering rings cannot be placed equally apart because of main bearing saddledamage, bridges are available. These bridges support boring bar while saddlebores are checked and/or machined.(1) Install centering rings in undamaged main bearing saddles as far apart as possible.(2) Install main bearing caps and torque capscrews to specifications in table 3-3.(3) Slide boring bar into centering rings.(4) Slide ST-1177-21 bridge bearing with ST-1177-22 bridge bearing bar over boring bar. Stop at point wheresupport is needed. Allow room for cutter holder if bridge bearing is next to journal to be cut.3-104

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!