12.07.2015 Views

MSC 85/26/Add.2 ANNEX 3 RESOLUTION MSC.268(85) - US Coast ...

MSC 85/26/Add.2 ANNEX 3 RESOLUTION MSC.268(85) - US Coast ...

MSC 85/26/Add.2 ANNEX 3 RESOLUTION MSC.268(85) - US Coast ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>MSC</strong> <strong>85</strong>/<strong>26</strong>/<strong>Add.2</strong><strong>ANNEX</strong> 3Page 3311.1.3 Temperature and humidityFigure 1.1.2.4 – Examples of spring-loaded tampersIt is preferable to work in a room where the samples will be protected from excessivetemperatures, air currents and humidity variations. All phases of the material preparation andtesting procedure should be accomplished in a reasonable space of time to minimize moisturelosses and, in any event, within the day of commencement. Where possible, sample containersshould be covered with plastic film or other suitable cover.1.1.4 ProcedureThe quantity of material required for a flow moisture test will vary according to the specificgravity of the material to be tested. It will range from approximately 2 kg for coal to 3 kg formineral concentrates. It should be collected as a representative sample of the cargo beingshipped. Experience has shown that more accurate test results will be obtained by ensuring thatthe moisture content of the test sample is increased rather than decreased towards the FMP.I:\<strong>MSC</strong>\<strong>85</strong>\<strong>26</strong>-Add-2.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!