12.07.2015 Views

MSC 85/26/Add.2 ANNEX 3 RESOLUTION MSC.268(85) - US Coast ...

MSC 85/26/Add.2 ANNEX 3 RESOLUTION MSC.268(85) - US Coast ...

MSC 85/26/Add.2 ANNEX 3 RESOLUTION MSC.268(85) - US Coast ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>MSC</strong> <strong>85</strong>/<strong>26</strong>/<strong>Add.2</strong><strong>ANNEX</strong> 3Page 248APPENDIXPITCH PRILLGeneral precautions:1. Personnel engaged in loading shall be supplied with gloves, dust masks, approvedprotective clothing and goggles.2. Eyewashes and sun screen creams shall be readily available.3. Number of personnel in area of loading shall be kept to a minimum. Personnel in area ofloading shall be aware of all the hazards involved.4. Personnel engaged in the handling of this cargo shall wash well and keep out of the sunfor a few days, after the cargo handling.5. The hatch shall be closed after loading or discharge has ceased and the ship shall bewashed out to remove all dust.6. Due consideration shall be paid on suspending the cargo handling when wind is blowingdust.7. After completion of discharging this cargo, the deck shall be cleaned up to remove allspillages.8. Ventilation of the accommodation spaces shall be closed and the air conditioning systemsfor the accommodation spaces shall be on re-cycle mode when this cargo is being handled– either loading or discharging.9. The cargo dust is easily ignited and may cause fire and explosion. Special care shall betaken to prevent fire during loading and discharging the cargo.I:\<strong>MSC</strong>\<strong>85</strong>\<strong>26</strong>-Add-2.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!