12.07.2015 Views

Philippine Bidding Documents - UP Baguio

Philippine Bidding Documents - UP Baguio

Philippine Bidding Documents - UP Baguio

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

the post qualification of the second Lowest Calculated Bid. The procedure shall berepeated until the LCRB is identified and selected for contract award. However ifno Bidder passed post-qualification, the BAC shall declare the bidding a failureand conduct a re-bidding with re-advertisement.34. Notice to Proceed34.1. Within three (3) calendar days from the date of approval of the contract by theappropriate government approving authority, the Procuring Entity shall issue itsNotice to Proceed to the Bidder.34.2. The date of the Bidder’s receipt of the Notice to Proceed will be regarded as theeffective date of the contract, unless otherwise specified in the BDS.Page 20 of 38

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!