12.07.2015 Views

worksite safety innovation and developments on

worksite safety innovation and developments on

worksite safety innovation and developments on

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

HIERARCHY OF SAFETY CONTROLSTRAFFIC MANAGEMENT• Level 1 ELIMINATION OF TRAFFIC HAZARD – Close road, diverttraffic, side track, c<strong>on</strong>tra flow.• Level 2 ISOLATE TRAFFIC – Safety barriers to isolate traffic from<str<strong>on</strong>g>worksite</str<strong>on</strong>g>. Traffic clearance is a lower level isolati<strong>on</strong> c<strong>on</strong>trol.• Level 3 ENGINEERING CONTROLS - Crash attenuators fitted toshadow trucks, C<strong>on</strong>e deployment & retrieval trucks, etc.• Level 4 BEHAVIORAL PROTECTION – Signs & bollards to guide trafficpast <str<strong>on</strong>g>worksite</str<strong>on</strong>g>. PPE (Plus speed c<strong>on</strong>trol initiatives).• Level 5 A COMBINATION OF THE ABOVE CONTROLSVicRoads Code requires highest c<strong>on</strong>trol practicable.THE OHS CONSTRUCTION REGULATIONS 2007 NOW MANDATE THEHIERARCHY OF CONTROLS APPROACH TO HAZARD CONTROL INVICTORIA

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!