12.07.2015 Views

Emergency Manual Load Shedding and Peak Load Reduction ...

Emergency Manual Load Shedding and Peak Load Reduction ...

Emergency Manual Load Shedding and Peak Load Reduction ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

OO 6T-29Effective Date: 02 July 2014Page 13 of 13Appendix 6EMLS Monthly ExerciseIn order to increase <strong>and</strong> maintain readiness for an emergency condition in which an emergency manual loadshedding routine (as per OO 6T-29) is required, a monthly simulation exercise of the <strong>Emergency</strong> <strong>Manual</strong> <strong>Load</strong><strong>Shedding</strong> is required.The simulation will include the selection of the appropriate circuit breakers for tripping <strong>and</strong> allowance for thetime required for the actual trip execution.The Transmission Coordinator shall lead the exercise. He/she may choose to carry out the entire exercise ordelegate any portion of the exercise to appropriate Grid Operator(s) by issuing manual load sheddingdirectives.Please record the time (minutes, seconds) required for completion of the simulated shedding of each loadblock.RequestTime Area InitialsTime forBlock 1Time forBlock 2Time forBlock 3Report TimeLMVINISITransmission Coordinator: ___________________Date performed: _________________System Control Manager: _____________________This exercise is to be completed by the third Sunday of each month.Return completed form to: Asher Steed

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!