12.07.2015 Views

SkyView System Installation Guide - Dynon Avionics

SkyView System Installation Guide - Dynon Avionics

SkyView System Installation Guide - Dynon Avionics

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SV-D700 / SV-D1000 <strong>Installation</strong> and ConfigurationIn the event of an electrical failure that causes <strong>SkyView</strong> to run on the SV-BAT-320, the SV-BAT-320 supplies power to the <strong>SkyView</strong> display it is connected to, along with any connected SV-ADAHRS-20X, SV-EMS-220/221, SV-ARINC-429, and SV-GPS-250 modules. A fully charged SV-BAT-320 can keep most <strong>SkyView</strong> systems operating for at least 60 minutes. The SV-BAT-320does not supply (backup) power to the following <strong>SkyView</strong> system devices:Autopilot servosHeated AOA/Pitot ProbeSV-ADSB-470SV-COM-425SV-XPNDR-26XAny non-<strong>Dynon</strong> device<strong>SkyView</strong> displays are only compatible with <strong>Dynon</strong>’s SV-BAT-320 backup battery. Donot connect a lead-acid battery or any other battery to the connection reserved forthe SV-BAT-320 as the charging algorithm is optimized for the SV-BAT-320.Connecting any other battery may have detrimental consequences. Damagecaused by connecting such a battery will not be repaired under warranty.See the Homemade Wire Harness Considerations section for importantspecifications that must be adhered to for the SV-BAT-320 to charge properlywhen used with a non-<strong>Dynon</strong> harness.<strong>SkyView</strong> Network ConnectorsThe two D9 connectors on the back of a <strong>SkyView</strong> display are <strong>SkyView</strong> network connectors. Theyhave identical pin-outs and are electrically connected inside the display (i.e., they arecompletely interchangeable). Installers may use either connector or both connectors in <strong>SkyView</strong>installations. Reference Table 64 on page 19-8 for <strong>SkyView</strong> Network Connector pin-outinformation.Note that these connectors are not serial port connectors.Network Setup and StatusOnce all <strong>SkyView</strong> modules are connected in a network, either in a bench top test or permanentinstallation, turn the display(s) on. You will see the display boot up and the status LEDs on themodules light up.A tail number on the Aircraft Information Page (SETUP MENU > SYSTEM SETUP >AIRCRAFT INFORMATION) is required for network configuration.If you have more than one display in your <strong>SkyView</strong> system, the tail number onlyneeds to be set on the display that you initially perform the Network Configurationon. At network configuration time, all other displays that are set to the default tail4-8 <strong>SkyView</strong> <strong>System</strong> <strong>Installation</strong> <strong>Guide</strong> - Revision O

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!