12.07.2015 Views

SkyView System Installation Guide - Dynon Avionics

SkyView System Installation Guide - Dynon Avionics

SkyView System Installation Guide - Dynon Avionics

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Revision Revision Date Descriptionharnesses.Added OAT connection information for customers making their own harnesses.Removed 30K resistor requirement for Rotax trigger coil RPM pickup.Clarified SV-GPS-250 connections when multiple displays and/or SV-GPS-250 modulesare involved.Added pinout table for <strong>Dynon</strong> Capacitance-to-Voltage Converter.Added connector labels to <strong>SkyView</strong> Network Module and Display Diagrams.Fixed orientation of <strong>SkyView</strong> connectors on diagrams.Clarified acceptable SV-ADAHRS-20X orientation.Added additional Garmin 430 and SL30 configuration information.Fixed link to AOA information on <strong>Dynon</strong> web site.Added LED status troubleshooting information for <strong>SkyView</strong> modules.Added product registration information.Updated Garmin 480 connection details.G March 2011Added warnings about modifying products and introduction of foreign debris.Described improved loss of external power with backup battery connected behavior.Added G meter setup information.Added recommended Ethernet connection information for multiple display <strong>SkyView</strong>systems.Clarified GRT hall effect amps sensor support.Added information about reconnecting repaired <strong>SkyView</strong> Network components to asystem after repair.Added Synthetic Vision License and Purchase Information.Added SV-MAP-270 License and Purchase Information.Updated information about obtaining and managing aviation / obstacle databases,including Jeppesen data support.Removed Create <strong>System</strong> Backup description.Added description of EMS serial data.H April 2011Changed Screen Hardware to Display Hardware.Add flight path marker and extreme pitch warning menu items.Clarified SV-GPS-250 connectivity.Clarified that Ethernet is designed to be connected permanently.Added angle of attack menu item.Added OAT probe adjustment setting information.Added Vertical Power VP-X License information and interfacing information.I September 2011Clarified serial port connections for multi-display <strong>SkyView</strong> systems in Appendix E.Added information about which modules and devices the SV-BAT-320 can providepower to in the event of power failure.Added EI FT-60 fuel flow sensor orientation information.Added a note about the importance of external devices sharing ground with <strong>SkyView</strong>for proper operation.vi<strong>SkyView</strong> <strong>System</strong> <strong>Installation</strong> <strong>Guide</strong> - Revision O

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!