12.07.2015 Views

SkyView System Installation Guide - Dynon Avionics

SkyView System Installation Guide - Dynon Avionics

SkyView System Installation Guide - Dynon Avionics

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>System</strong> PlanningFigure 8– <strong>SkyView</strong> <strong>System</strong> with Two Redundant Displays, One EMS, Two Backup Batteries (One per Display),Two Redundant GPS, Two Redundant ADAHRS, Two Servos, and one Transponder using splitters (legacyinstallation method)Note, that in Figure 8, each SV-GPS-250’s power, ground, and output wires areconnected to both displays on different serial ports. The primary SV-GPS-250should be connected to serial port 5 on each display. The secondary SV-GPS-250should be connected on another serial port on each display.Additionally, if there are both multiple displays and multiple SV-GPS-250 units inthe system, power for the secondary GPS should be sourced from the GPS powerwire on the second display – in other words, each SV-GPS-250 should receivepower from a different display. Reference the SV-GPS-250 <strong>Installation</strong> andConfiguration Section for more information on this configuration.<strong>SkyView</strong> <strong>System</strong> <strong>Installation</strong> <strong>Guide</strong> - Revision O 2-17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!