12.07.2015 Views

SkyView System Installation Guide - Dynon Avionics

SkyView System Installation Guide - Dynon Avionics

SkyView System Installation Guide - Dynon Avionics

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Appendix A: Maintenance and TroubleshootingAnnual Backup Battery TestPerform this test to ensure each backup battery in the <strong>SkyView</strong> system is fully functional. A fullycharged SV-BAT-320 should power a typical <strong>SkyView</strong> system for at least 60 minutes if primarypower is lost.If the <strong>SkyView</strong> system has more than one display with a backup battery installed, perform thetest for each display individually. Power off all but one display during the test.Test Procedure1. Fully charge the SV-BAT-320 Backup Battery. Reference the Battery Charging section ofthe SV-BAT-320 <strong>Installation</strong> chapter of this manual. Disconnect primary power from the<strong>SkyView</strong> display—ensure that the display is not powered from another source.2. Press TEST BAT button3. The BATTERY TEST screen will appear displaying the status of the test. Note that whilethe test will last 60 minutes, if the SV-BAT-320 is able to power the system for at least45 minutes, the battery is normal.4. The BATTERY TEST can be aborted by pressing the PWR OFF button.Repeat the test procedure for each backup battery in the system.This test discharges the backup battery. Recharging the battery after the test isrecommended. Do this by applying primary power to the display. The backupbattery is fully charged when its voltage reaches 12.25 volts.If a tested battery does not pass the initial backup battery test, please contact <strong>Dynon</strong> <strong>Avionics</strong>by phone or the online store (store.dynonavionics.com) to obtain a replacement battery.Please dispose of non‐functional <strong>SkyView</strong> backup batteries in a responsiblemanner. <strong>SkyView</strong> backup batteries are lithium-ion and similar in construction tocordless tool batteries. They can likely be recycled wherever cordless tool batteryrecycling is available. For a list of recycling locations in your area (USA only), call 1-800-8-BATTERY or see the Call 2 Recycle website at www.rbrc.org.TroubleshootingThe Display Hardware Information Page (SETUP MENU > LOCAL DISPLAY SETUP > DISPLAYHARDWARE INFORMATION) can be a valuable resource when troubleshooting <strong>SkyView</strong> and isdescribed in the previous section.If the suggestions below do not help, or your issue is not listed below, please call<strong>Dynon</strong> Technical Support at +1(425) 402-0433 or email atsupport@dynonavionics.com.17-8 <strong>SkyView</strong> <strong>System</strong> <strong>Installation</strong> <strong>Guide</strong> - Revision O

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!