12.07.2015 Views

SkyView System Installation Guide - Dynon Avionics

SkyView System Installation Guide - Dynon Avionics

SkyView System Installation Guide - Dynon Avionics

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SV-BAT-320 <strong>Installation</strong>Test Procedure1. Fully charge the SV-BAT-320 Backup Battery. Reference the Battery Charging section forbattery charging instructions.2. Turn off all other displays except for the one you are currently testing.3. Disconnect primary power from the <strong>SkyView</strong> display—ensure that the display is notpowered from another source.4. Press TEST BAT button5. The BATTERY TEST screen will appear displaying the status of the test. Note that whilethe test will last 60 minutes. If the SV-BAT-320 is able to power the system for at least45 minutes, the battery passes this test.6. The BATTERY TEST can be aborted by pressing the PWR OFF button.Repeat the test procedure for each backup battery /display in the system.This test discharges the backup battery. Recharging the battery after the test isrecommended. Do this by applying primary power of >12.25 volts to your <strong>SkyView</strong>system. The backup battery is fully charged when its voltage reaches 12.25 volts.If a tested battery does not pass the initial backup battery test, please contact <strong>Dynon</strong> <strong>Avionics</strong>Technical Support for further assistance.<strong>SkyView</strong> <strong>System</strong> <strong>Installation</strong> <strong>Guide</strong> - Revision O 9-5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!