12.07.2015 Views

SkyView System Installation Guide - Dynon Avionics

SkyView System Installation Guide - Dynon Avionics

SkyView System Installation Guide - Dynon Avionics

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SV-GPS-250 <strong>Installation</strong> and ConfigurationFunctionHarness and SV-GPS-250 Wire Color<strong>SkyView</strong> DisplayD37 PinSV-GPS-250 Tx /Gray withSerial Port 5 RxViolet stripe11SV-GPS-250 RX /Gray withSerial Port 5 Tx Orange stripe12SV-GPS-250 Ground Black 24SV-GPS-250 Power Orange 29Table 38–SV-GPS-250 Serial Connection DetailsAs mentioned before, if there are two or more displays in your <strong>SkyView</strong> system, all four of theSV-GPS-250 module’s wires must be connected to all displays in parallel. This wiring scheme isillustrated in Figure 52.Figure 52–SV-GPS-250 Connected to Multiple <strong>SkyView</strong> DisplaysIf there is more than one SV-GPS-250 in your system, use the same scheme in Figure 52 ondifferent display serial ports for the other SV-GPS-250 modules, but connect power and groundfor the other SV-GPS-250 modules to the same power and ground connections (black andorange wires) that are provided in the serial port 5 wiring bundle on the display harnesses. Anexample of this configuration follows.<strong>SkyView</strong> <strong>System</strong> <strong>Installation</strong> <strong>Guide</strong> - Revision O 8-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!