Survey, Design, Supply, Installation Testing and Commissioningof Infill Balise for Track Side Equipment to suit the existinginstallation of TPWS System in Agra Cantt - Hazrat Nizamuddinsection of North Central and Northern RailwayTender Notice No.: IRPMU/W/ 2011/177/TPWS Infill Balise (AGC-HNZM)Dated: 17/11/2011INDEXSECTION CHAPTER SUBJECTI 1 Tender Notice2 Preamble3 Schedule of RequirementII 1 Instructions to tenderer & Conditions oftendering2 Special conditions of contract3 Forms of tenderer etc.III 1 Technical Specification1

<strong>Survey</strong>, <strong>Design</strong>, <strong>Supply</strong>, <strong>Installation</strong> <strong>Testing</strong> <strong>and</strong> <strong>Commissioning</strong><strong>of</strong> Infill Balise for Track Side Equipment to suit the existinginstallation <strong>of</strong> TPWS System in Agra Cantt - Hazrat Nizamuddinsection <strong>of</strong> North Central <strong>and</strong> Northern RailwayTender Notice No.: IRPMU/W/ 2011/177/TPWS Infill Balise (AGC-HNZM)Dated: 17/11/2011INDEXSECTION CHAPTER SUBJECTI 1 Tender Notice2 Preamble3 Schedule <strong>of</strong> RequirementII 1 Instructions to tenderer & Conditions <strong>of</strong>tendering2 Special conditions <strong>of</strong> contract3 Forms <strong>of</strong> tenderer etc.III 1 Technical Specification1


Section – IChapter – 1Tender Notice2


TENDER NOTICEE-mail address: adm@irpmu.railnet.gov.in Tel.: +91-11-2341 2260 /2341 2294Fax: +91-11-2341 2556Tender Notice No.: IRPMU/W/ 2011/177/TPWS Infill balise (AGC-HNZM)Dated:14/11/2011Chief Administrative Officer, Indian Railway Project Management Unit, New Delhi, for <strong>and</strong> on behalf <strong>of</strong> thePresident <strong>of</strong> India invites sealed Open tenders from the established, reliable <strong>and</strong> experienced manufactures or theirauthorized agents with sufficient proven experience in similar work as following details.Name <strong>of</strong> Work:<strong>Survey</strong>, <strong>Design</strong>, <strong>Supply</strong>, <strong>Installation</strong> <strong>Testing</strong> <strong>and</strong> <strong>Commissioning</strong><strong>of</strong> Infill Balise for Track Side TPWS System in Agra Cantt -Hazrat Nizamuddin section <strong>of</strong> North Central <strong>and</strong> NorthernRailwayApprox. 9.12 Crores (Approx. Rupees Nine Crores <strong>and</strong>Estimated Cost <strong>of</strong> workTwelve Lacs only)Earnest MoneyPrice <strong>of</strong> Tender Document(Non refundable):Forwarding Charges(if required by post / courier)Completion Period:Sale <strong>of</strong> Tender DocumentsLast Date / Time <strong>of</strong> Tender ReceiptTender Opening Date / TimePlace <strong>of</strong> OpeningValidity <strong>of</strong> Offer6,06,000/- (Approx. Rupees Six Lacs Six Thous<strong>and</strong>s only)10,000/- (Rupees Twenty Five Thous<strong>and</strong> only)500/- (Rupees Five Hundred only)8 Months30.11.2011 to 27.12.2011 upto 16.00 hrs28.12.2011 upto 14.30 PM28.12.2011 at 15.00 PMIn the <strong>of</strong>fice <strong>of</strong> CAO/IRPMU, IRCOT complex, Shivaji Bridge,New Delhi., India.180 days from date <strong>of</strong> opening.Further particulars <strong>and</strong> tender form can be obtained from IRPMU’s website www.irpmu.railnet.gov.in,NCR website www.ncr.railnet.gov.in & Govt. <strong>of</strong> India Portal www.tenders.gov.in .Tenders submittingdownloaded tender document should submit cost <strong>of</strong> tender document as given above in the form <strong>of</strong> PayOrder / Dem<strong>and</strong> Draft from a Nationalized/ Scheduled Indian Bank drawn in favour <strong>of</strong> Dy.FA & CAO /IRPMU, New Delhi along with bid. IRPMU will not be responsible for any forwarding delay.(D.P.Garg)Dy.CSTE/Sig/IRPMUIRCOT Complex, Shivaji Bridge, New Delhi, IndiaFor & on behalf <strong>of</strong> the President <strong>of</strong> India.Copy to:1- C.P.R.O. / NCR for publication <strong>of</strong> Tender Notice.2- CSTE/NCR/ALD3- FA & CAO/IRPMU for nomination <strong>of</strong> Official for opening the tender.4- Notice Board/IRPMU5- Notice Board/N.C. Rly. HQs <strong>of</strong>fice3


Section – IChapter – 2Preamble5


PREAMBLETender No. IRPMU/W/ 2011/177/TPWS Infill Balise (AGC­HNZM) dated 14­11­20111. Name <strong>of</strong> Work:<strong>Survey</strong>, <strong>Design</strong>, <strong>Supply</strong>, <strong>Installation</strong> <strong>Testing</strong> <strong>and</strong> <strong>Commissioning</strong> <strong>of</strong> Infill Balises for Track SideEquipment to suit the existing installation <strong>of</strong> TPWS System in Agra Cantt - Hazrat Nizamuddinsection <strong>of</strong> North Central <strong>and</strong> Northern Railway2 SCOPE OF WORK:2.1 The scope <strong>of</strong> work is as follow:<strong>Survey</strong>, <strong>Design</strong>, <strong>Supply</strong>, <strong>Installation</strong> <strong>Testing</strong> <strong>and</strong> <strong>Commissioning</strong> <strong>of</strong> Infill Balises for Track SideEquipment to suit the existing installation <strong>of</strong> TPWS System in Agra Cantt - Hazrat Nizamuddinsection <strong>of</strong> North Central <strong>and</strong> Northern Railway.a) About 250 Mail/Express/Shatabdi/Passanger/Goods trains in UP/DN direction play in the NDLS‐AGC section <strong>of</strong> Agra Division (North Central Railway) <strong>and</strong> Delhi division (Northern Railway). Thesection has been provided with Train Protection Warning System (TPWS). The scope <strong>of</strong> surveyincludes estimation <strong>of</strong> braking characteristics required to define the braking curves. The surveyshall be done by the contractor to study the existing system available at site so as to provide anInfill‐balise system which is as per RDSO’s latest specifications <strong>and</strong> perfectly compliant with thealready available system at site. During the survey, the contractor will finalise the installationarrangements required for placing Infill‐balise, Junction Boxes, laying <strong>of</strong> Data cable, trenchlesstrack crossing, termination <strong>of</strong> connecting media in LEU <strong>and</strong> junction boxes, establishing propercommunication between LEU <strong>and</strong> Balise, commissioning the entire section with infill balise torepeat the aspect <strong>of</strong> signal to the on‐board equipment <strong>of</strong> the train approx. 500 mtr prior to thesignal.b) Based upon the Signal Roll Plan the firm will conduct the survey <strong>of</strong> the entire section <strong>and</strong> willprepare a St<strong>and</strong>ard Balise Plan <strong>and</strong> will get the St<strong>and</strong>ard Balise Plan approved by the RailwayAuthority.c) Based on the estimation <strong>of</strong> the requirement <strong>of</strong> the infill balise as per braking characteristics <strong>and</strong>braking curves; duly approved by the Railway, the contractor will install all the infill balise forsatisfactory performance. In case there is still a need to shift/replace the infill balise, thecorrecting measure should be taken by the firm for trouble free operation <strong>of</strong> the system.d) <strong>Installation</strong> <strong>of</strong> the line side equipments i.e. Track balise <strong>and</strong> interfacing unit with the signalaspects etc. Cable laying, foundation <strong>and</strong> erection <strong>of</strong> cable termination etc. required, has to be doneby the contractor. Any other activity required for the completion <strong>of</strong> the work <strong>of</strong> the work has to bedone by contractor.e) <strong>Commissioning</strong> <strong>of</strong> the entire system as described above <strong>and</strong> as per the schedule. <strong>Testing</strong> <strong>and</strong>commissioning will be done in association with Railway Engineers.f) As the Train Protection & Warning System (TPWS) is already provided in conformity with theETCS Level‐1 concept as per UIC/UNISIG Specifications, the entire system may have to beintroduced in the full supervision Mode <strong>of</strong> ETCS Level‐1, making it suitable for the traffic <strong>and</strong>speeds under IR condition. The <strong>of</strong>fered system should be capable <strong>of</strong> upward scalability to ETCSLevel II.g) Preparation <strong>and</strong> <strong>Supply</strong> <strong>of</strong> documentation for the entire system as per Para No. 12 <strong>of</strong> specialConditions <strong>of</strong> contract.h) A testing facility will have to be provided at Electric Loco Shed, Ghaziabad for testing theequipments used on‐board <strong>and</strong> on track‐side in the TPWS territory. Facility shall be so designedthat it should be possible to simulate the working <strong>of</strong> TPWS without actually6


2.2 Railway shall provide following:‐a) Loco for conducting field trail.b) <strong>Supply</strong> <strong>of</strong> signaling plan <strong>of</strong> the section <strong>and</strong> yard.2.3 Tenderer is required to undertake the total responsibility for various activities in realizing the “<strong>Design</strong><strong>and</strong> engineering including s<strong>of</strong>tware if any, sub‐system procurement, system integration, installation,commissioning <strong>and</strong> supervision <strong>of</strong> maintenance <strong>of</strong> whole system” in the section under consideration, soas to meet the end operational <strong>and</strong> technical requirements as set out in the tender document.3. Tender BidThe tender is a single packet system <strong>and</strong> the bid shall be submitted in two separate sealed covers asunder in time within the last date <strong>of</strong> tender submission in the sealed Tender Box to be kept for thepurpose in the <strong>of</strong>fice <strong>of</strong> Chief Administrative Officer/IRPMU, Shivaji Bridge (IRCOT complex),New Delhi110001.Part‐I‐ Technical <strong>and</strong> credential elements <strong>of</strong> the tender bid hereinafter called “Credential bid”.Part‐II‐ Price element <strong>of</strong> the tender bid hereinafter called “Price bid”.The details to be included with bid are given in Para <strong>of</strong> ‘Instructions to Tenderes <strong>and</strong> conditions <strong>of</strong>Tendering’.4. QUALIFYING CRITERIATo qualify for the bid, the contractor shall be required to meet the eligibility requirements as given in Para­17/18 <strong>of</strong> instructions to Tenderers <strong>and</strong> Conditions <strong>of</strong> Tendering.5. LAST DATE OF SUBMISSIONThe Tender shall be received up to the date & time as mentioned in tender notice or corrigendumthere<strong>of</strong> at New Delhi in the <strong>of</strong>fice <strong>of</strong> Chief Administrative <strong>of</strong>ficer/IRPMU, Shivaji Bridge (IRCOTcomplex), New Delhi 110001.6. DATE OF OPENING OF TENDERThe Tender will be opened at date & time as mentioned in tender notice or corrigendum there<strong>of</strong> at thesame address as mentioned in Para-5 above.7. COMPLETION PERIOD OF WORKThe entire work is to be completed 8(eight) months from the date <strong>of</strong> issue <strong>of</strong> Letter <strong>of</strong> Acceptance <strong>of</strong> theTender.8. THE LIST OF ADDRESS TO WHICH CORRESPONDENCE AND DOCUMENTS RELATING TO THECONTRACT SHOULD BE SENT(a) Prior to award <strong>of</strong> the contract:Chief Administrative Officer/IRPMU, Shivaji Bridge(IRCOT complex), New Delhi.Telephone no. +91 11 23411533, Fax no. +91 11 23412556(b) After the award <strong>of</strong> the contractThe Chief Administrative Officer/IRPMU, Shivaji Bridge(IRCOT complex), New Delhi or his successornominee (Whose address will be intimated in due course).9. EARNEST MONEY:The Tenderer should furnish the requisite Earnest Money along with their <strong>of</strong>fer in favour <strong>of</strong> the FinancialAdvisor& Chief Accounts Officer/IRPMU, Shivaji Bridge New Delhi’ as indicated in Tender Notice <strong>and</strong>Condition <strong>of</strong> Tendering.7


10. SECURITY DEPOSIT:On receipt <strong>of</strong> the Letter <strong>of</strong> Acceptance <strong>of</strong> Tender from the Railway, the successful Tenderer shall, within aperiod <strong>of</strong> 30 (Thirty) days, deposit, Security money, in favour <strong>of</strong> the Dy Financial Adviser & Chief AccountsOfficer/ IRPMU, Shivaji Bridge New Delhi as indicated in Para­ 3 <strong>of</strong> Special Conditions <strong>of</strong> Contract towardspayment <strong>of</strong> Security Deposit for due fulfillment <strong>of</strong> the Contract.11. SUPPLY OF MATERIALS:All the material as per schedule <strong>of</strong> the items <strong>of</strong> the work are to be supplied by the contractor <strong>and</strong> will besubmitted at the railway store depot at Tundla under SSE/Sig/TDL. The material will then be transportedfrom the Railways stores depots at Tundla to the working site by the contractor at his own cost.12. SPECIFICATIONS/ DRAWING:Reference <strong>of</strong> specification/drawing <strong>of</strong> the important equipment, components <strong>and</strong> other materials requiredfor the execution <strong>of</strong> the Contract is given in the Technical Supplement issued by RDSO. The work shall beexecuted in compliance with all the technical requirements given there.13. SCHEDULE OF QUANTITIES:The Schedule <strong>of</strong> Quantities for <strong>Supply</strong> & Execution <strong>of</strong> various works are indicated in Tender Schedule. Thetenderers are advised to quote for all items.NOTE:‐ If it is considered necessary that the item <strong>of</strong> <strong>Supply</strong> <strong>and</strong> works included in Schedule would notcover all works involved in the execution <strong>of</strong> the work, additional item <strong>of</strong> work which are considerednecessary <strong>and</strong> unit prices & quantity <strong>of</strong> such items shall be given separately along with Explanatory Notes.14. GENERAL INFORMATION REGARDING THE WORKa Type <strong>of</strong> locomotives <strong>and</strong> their brake system on which theTPWS is to be installed.b Brake interface in terms <strong>of</strong> clause 4.14 & 5.13.2 <strong>of</strong> RDSO Spec N/A8Electric Locos & EMUsc Type <strong>of</strong> signals where TPWS is to be installed. MACLS & Auto signalingd Available braking distance in the section Will be made availableefgThe voltage <strong>of</strong> input power supply available for On board <strong>and</strong>track side system.The duration <strong>of</strong> battery backup required for LEU, if required formore than half an hour.Relevant G & SR rules applicable alongwith speed restrictionlimits.Track-side 110 VAC witha variation <strong>of</strong> +20%/-30%.Half an hourh Class <strong>of</strong> balise in terms <strong>of</strong> clause 6.15 <strong>of</strong> RDSO specs. ‘A’ typeiType <strong>of</strong> Driver’s interface whether SDMI or DMI in terms <strong>of</strong>clause 4.1 (ii) c & 6.18 <strong>of</strong> RDSO specs.G&SR <strong>of</strong> NR & NCRN/Aj Whether 8 position switch is required in terms <strong>of</strong> clause 6.18 N/AklPurchaser shall specify the details <strong>of</strong> section, signaling details,type <strong>of</strong> locomotive <strong>and</strong> brake system to be used in the sectionin terms <strong>of</strong> clause 4.5 to 4.10 or RDSO Specs.Details mentioning the UIC/UNISIG SRS/FRS version <strong>of</strong>existing TPWS system with which the TPWS as per thisspecification is required to be interoperable.Multiple line, 25 KVACRE, MACLS & Autosignalling section.ETCS level-1, EN50126,EN50128, EN50129, EN50159-1&2, EEIG:97s066m Any other relevant information. The new Infill baliseTrack-side system hasto be perfectly compliantwith the existingTPWS system alreadyavailable in the section


Section – IChapter – 3Schedule <strong>of</strong> Requirement9


Schedule <strong>of</strong> Quantities <strong>and</strong> RatesTender No .IRPMU/W/ 2011/177/Infill baliseName <strong>of</strong> Work:- <strong>Survey</strong>, <strong>Design</strong>, <strong>Supply</strong>, <strong>Installation</strong> <strong>Testing</strong> <strong>and</strong> <strong>Commissioning</strong> <strong>of</strong> Infill Balise forTrack Side Equipment to suit the existing installation <strong>of</strong> TPWS System in Agra Cantt - HazratNizamuddin section <strong>of</strong> North Central <strong>and</strong> Northern RailwayS.NoDescription Unit Qty. UnitRate10TotalIn Rupees (in words) In Rupees (infigure)1 <strong>Design</strong>, Manufacture <strong>and</strong> supply <strong>of</strong>Line Side Electronic Unit (LEU) as perthe Special Conditions <strong>of</strong> contract <strong>and</strong>technical specifications enclosedmainly consisting <strong>of</strong> LEU Modules,Cabinet, Power <strong>Supply</strong>, Batteries,racks, fixtures, Connecting Cablesfrom LEU to signal location box/relayhut, equipment boxes etc. Any otheritems/ accessories needed to make theTPWS system functional will beprovided by the contractor.1.1 LEU Module Nos. 71.2 LEU Line side cabinet Nos. 71.3 Power supply for LEUs including Nos. 7Batteries1.4 <strong>Supply</strong> <strong>of</strong> relays universal plug in type Nos. 75for LED signal lamp (Q type ECRs) asper BRS941A specs No.STS/E/Relays/AC Lit LED Signal/09-2002 Amd 1 or latestSub Total2 <strong>Installation</strong> <strong>of</strong> Line side equipment (LEU)TPWS equipment. This also includestransportation <strong>of</strong> material from consignee'sdepot to the site. Railways will provide apotential free contact for each signalaspect. Cost <strong>of</strong> any connecting cable &cable laying from LEU to signal locationbox/ relay hut, equipment boxes etc.,foundation & erection <strong>of</strong> equipment/termination <strong>of</strong> boxes required will be borneby the contractor. All the wiring & fixingmaterial, earthing arrangements, fuses,rakes, anti-pilferage arrangements etc.required for the work have to be suppliedby the contractor.2.1 LEU cabinet with LEU Module Nos. 7UnitRateTotalIn Rupees (inwords)


2.2 <strong>Installation</strong> <strong>of</strong> Plug In Type ECR Relays Nos. 75Sub Total3 <strong>Design</strong>, Manufacture <strong>and</strong> supply <strong>of</strong>Line Side Eurobalise(s) 'A' type as perthe Special Conditions <strong>of</strong> contract <strong>and</strong>technical specifications enclosed alongwith Connecting Cables from balise toJB, based on signaling roll plan &st<strong>and</strong>ard balise plan etc. The St<strong>and</strong>ardBalise Plan is to be prepared by thefirm based on signalling roll plan <strong>and</strong>as per actual site survey. The quantityindicated is the number <strong>of</strong> signals forwhich infill balises are to be providedfor signals as per site requirements.St<strong>and</strong>ard balise plan is also to beprepared based on the actual siteNos. 317conditions <strong>and</strong> got approvedaccordingly.4 Junction Boxes for Eurobalises Nos. 3175 <strong>Installation</strong> <strong>of</strong> Euroballises based on Nos. 317Signalling roll plan <strong>and</strong> st<strong>and</strong>ard baliseplan along with Connecting Cablesfrom balise to JB with suitable layingas per practice in NCR <strong>and</strong> terminatingin JB.6 Connectivity <strong>of</strong> LEU with Junction Box<strong>of</strong> Infill-balise along with supply <strong>of</strong>connecting media as per UNISIGspecifications used for the safety case<strong>of</strong> TPWS/ETCS with all requiredarrangement including termination <strong>of</strong>the connecting media. This will includeconnectivity <strong>of</strong> Infill balise with existingLEUs. Brief description <strong>of</strong> the workinvolved for this item is given asunder:-6.1. Excavating <strong>and</strong> refilling <strong>of</strong> trench in NormalSoil to the level <strong>of</strong> ground with rammed earth(as per extant practice <strong>of</strong> NC Railway <strong>and</strong> asper instructions <strong>of</strong> site engineer) so as not t<strong>of</strong>orm drain, 0.3 Mtr Wide <strong>and</strong> 1.2 Mtr deep onboth side <strong>of</strong> the station alongwith track. It alsoincludes clearance <strong>of</strong> roots <strong>of</strong> trees bushes.Lesser depth <strong>of</strong> the trench is to be paidproportionately. FRP cable route marker willalso be supplied <strong>and</strong> fixed properly at every100 mtr.Mtrs 15800011


6.2 Laying <strong>of</strong> Telecom/data cable <strong>of</strong> Mtrs 158000different sizes as per extant practice inNC Railway as per instruction <strong>of</strong> siteengineer, in the trench excavated <strong>and</strong>passing cable in 32mm HDPE pipesupplied <strong>and</strong> as per cable route planapproved by Railway <strong>and</strong> meggering <strong>of</strong>cable before <strong>and</strong> after its laying.Meggering sheets to be supplied <strong>and</strong>filed up by contractor <strong>and</strong> submitted toRailways.6.3 Boring <strong>and</strong> trenchless cabling Mtrs 1000alongwith supply <strong>and</strong> insertion <strong>of</strong>HDPE self lubricated pipes <strong>of</strong> 50 mmdia with 6 mm wall thickness in thebore for laying <strong>of</strong> Telecom/Data/Powercable under the track/road, as <strong>and</strong>where required.6.4 <strong>Supply</strong> <strong>of</strong> DWC(double wall corrugated Mtrs 158000pipe) HDPE Pipe 32 mm outer dia instraight length as per British st<strong>and</strong>ardno BSEN 50086-1 aznd BSEN 50086-2-4 Doc no ETD 14 (5071) AND 14(5702) along with coupler at suitablelength.6.5 <strong>Supply</strong> <strong>of</strong> Data Cable, Shielded type Mtrs 159000single pair as per clause no. 6.20 <strong>of</strong>RDSO spec. no. RDSO/SPN/183/2011version 2 or latest <strong>and</strong> compatible tointerconnecting LEUs <strong>and</strong> Balise.Sub Total7 Provision <strong>of</strong> testing facility <strong>and</strong>Simulator at Electric Loco Shed (atGhaziabad) having following Items:-7.1 <strong>Design</strong>, manufacture <strong>and</strong> supply <strong>of</strong> OnboardSet 1computer (OBC) along withnecessary arrangements including BTM,Antenna, Wheel sensors, CENELECDMI, EVC Power <strong>Supply</strong>, Motor,variable Power <strong>Supply</strong> for Motor, PushTrolley, other interfaces, EP Valves,pipes, Isolation-Cock, etc. required forthe simulator. The relays provided in theOBC have to be fit for the dynamiccondition <strong>of</strong> rolling stock application.7.2 <strong>Installation</strong> <strong>of</strong> OBC along with allaccessories as per instruction <strong>of</strong> siteengineerNos. 112


7.3 <strong>Design</strong>, Manufacture <strong>and</strong> supply <strong>of</strong> Line Nos. 1Side Electronic Unit (LEU) as per theSpecial Conditions <strong>of</strong> contract <strong>and</strong>technical specifications enclosedmainly consisting <strong>of</strong> LEU Modules,Cabinet, Power <strong>Supply</strong>, Batteries,Relays, racks, fixtures, ConnectingCables equipment boxes etc.7.4 <strong>Installation</strong> <strong>of</strong> Line side equipment (LEU) Nos. 1TPWS equipment, this also includestransportation from consignee's depot tothe site. Railways will provide apotential free contact for each signalaspect. Cost <strong>of</strong> any cable laying,erection <strong>of</strong> equipment/ termination <strong>of</strong>boxes required will be borne by thecontractor. All the wiring material,earthing arrangements, fuses, relays,rakes, anti-pilferage arrangements etc.required for the work have to besupplied by the contractor.7.5 <strong>Design</strong>, Manufacture <strong>and</strong> supply <strong>of</strong> Nos. 4switchable Eurobalise(s) as per theSpecial Conditions <strong>of</strong> contract <strong>and</strong>technical specifications enclosed alongwith Connecting Cables.7.6 <strong>Installation</strong> <strong>and</strong> commissioning <strong>of</strong> Nos. 4switchable Euro-ballises.7.7 <strong>Supply</strong> <strong>of</strong> Fixed Eurobalise Nos. 27.8 <strong>Installation</strong> <strong>of</strong> fixed Euroballises Nos. 2Any other materials/items required forinstallation <strong>and</strong> commissioning <strong>of</strong> thetesting facility at Electric Loco Shedhas to be provided by the contractorSub TotalTotal (Schedule)Optional Item24 V gallant make power for LEU1 supply along with the suitable fuses<strong>and</strong> connectors48 V gallant make power for LEU2 supply along with the suitable fuses<strong>and</strong> connectors3 1 KVA UPS with 30 minutes batterybackup, <strong>and</strong> suitable rack for UPS<strong>and</strong> batteriesNos. 20Nos. 20Nos. 1013


4 2 KVA UPS with 30 minutes batterybackup, <strong>and</strong> suitable rack for UPS<strong>and</strong> batteriesNos. 10Note :‐ 1. Tenderer has to quote rate for all items as per above schedule includingrate for optional items.2. Rate quoted for optional item will not be taken into tender evaluation.14


Section – IIChapter – 1Instructions to Tenderer & Conditions<strong>of</strong> Tendering15


Section – IIChapter – 1Instructions to Tenderer & Conditions <strong>of</strong> TenderingINDEX1. GENERAL INSTRUCTIONS2. INTERPRETATIONS3. LOCAL CONDITIONS4. COMPLIANCE TO TENDER CONDITIONS, TECHNICAL SPECIFICATION & DRAWINGS5. EARNEST MONEY/BID GUARANTEE6. SUBMISSION OF OFFERS7. CONSTITUTION OF FIRM & POWER OF ATTORNEY8. UNIT PRICES9. VALIDITY OF OFFER10. RATES DURING NEGOTIATION11. INCOME TAX CLEARANCE CERTIFICATE12. PERIOD OF COMPLETION & TIME PROGRESS GRAPH13. OPENING OF TENDER14. NON‐TRANSFERABILITY & NON‐REFUNDABILITY15. ERRORS OMISSIONS & DISCREPANCIES16. WRONG INFORMATION BY TENDERER17. QUALIFICATION CRITERIA18. JOINT VENTURE19 DETERMINATION OF RESPONSIVENESS20. CORRECTION OF ERRORS16


21. CONVERSION TO SINGLE CURRENCY i.e. RUPEES22. SYSTEM PERFORMANCE GUARANTEE23. AUTHORITY FOR ACCEPTANCE24. PURCHASE PREFERENCE25. AGREEMENT26. TENDERER'S ADDRESS27. FOREIGN EXCHANGE28. FINANCIAL29. TECHNOLOGY & EQUIPMENT30. SOFTWARE31. ENGINEERING ORGANISATION32. CONSTRUCTION MACHINERY17


INSTRUCTIONS TO TENDERERS AND CONDITIONS OF TENDERING1. GENERAL INSTRUCTIONS:1.1 Chief Administrative Officer, Indian Railway Project Management Unit, New Delhi, for <strong>and</strong> on behalf <strong>of</strong>the President <strong>of</strong> India invites sealed Open tenders from the established, reliable <strong>and</strong> experiencedmanufacturers or their authorized agents with sufficient proven experience in similar work for thework <strong>of</strong> <strong>Survey</strong>, <strong>Design</strong>, <strong>Supply</strong>, <strong>Installation</strong> <strong>Testing</strong> <strong>and</strong> <strong>Commissioning</strong> <strong>of</strong> Infill Balises for TrackSide Equipment to suit the existing installation <strong>of</strong> TPWS System in Agra Cantt - HazratNizamuddin section <strong>of</strong> North Central <strong>and</strong> Northern Railway as given in the preamble.1.2 The general conditions <strong>of</strong> contract, Special Conditions <strong>of</strong> Contract, Instructions to Tenderers <strong>and</strong>Conditions <strong>of</strong> Tendering, Technical Specifications, Preamble including Schedule <strong>of</strong> Work & Suppliesincluding all Annexure & forms etc. shall, hereafter, be collectively referred to as the "Tender papers".1.3 Any clarifications required by the tenderer may be obtained from the Chief AdministrativeOfficer/IRPMU, Shivaji Bridge (IRCOT Complex), New Delhi 110001.2. INTERPRETATIONS:The following terms wherever occurring in the tender papers <strong>and</strong> wherever used throughout theexecution <strong>of</strong> the work, shall, unless excluded by or repugnant to the context, have the meaningattributed there to as follows: ‐"CONTRACT" Means the Agreement or Work Order resulting from the acceptance by the Purchaser <strong>of</strong>this tender either in whole or in part."CONTRACTOR/AGENCY” Means the successful Tenderer, i.e., the Tenderer whose Tender has beenaccepted either in whole or in part.“CONTRACTOR’S REPRESENTATIVE” Shall mean a person in supervisory capacity who shall be sodeclared by the contractor <strong>and</strong> who shall be authorized under a duly executed power <strong>of</strong> attorney toreceive materials issued by the Purchaser to the Contractor for the works. He shall be responsible forproper execution <strong>of</strong> works at each or all places <strong>and</strong> shall take orders from Purchaser's Engineers <strong>and</strong>carry out the same."ENGINEER” Shall mean the Divisional Engineer/Divisional Electrical Engineer/Divisional Signal &Telecom. Engineer or the Assistant Engineers in executive charge <strong>of</strong> the Railway works <strong>and</strong> shall includethe superior <strong>of</strong>ficers <strong>of</strong> the Railway. He is responsible for ensuring that all field works covered by thecontract are carried out in accordance with approved designs, drawings <strong>and</strong> specifications <strong>and</strong>conditions <strong>of</strong> contract as agreed to.“ENGINEER’S REPRESENTATIVE" Shall mean the Sr. Section Engineers/ Section Engineers in directcharge <strong>of</strong> the works <strong>of</strong> Signal & Telecom./Civil/Electrical Engineering department <strong>of</strong> Railway."EQUIPMENT” Means all or any equipment considered necessary by the Purchaser's Engineers for thesatisfactory operation, as a whole, <strong>of</strong> the installations.“GENERAL MANAGER" Means the <strong>of</strong>ficer in Administrative charge <strong>of</strong> this Railway <strong>and</strong> shall mean <strong>and</strong>include the <strong>of</strong>ficers to whom the functions are delegated. His postal address shall be intimated to thesuccessful Tenderers in due course."MONTH” Means One English Calendar Month."MATERIALS” Means all equipment, components, fittings <strong>and</strong> other materials including raw materialsrequired to complete the work."PURCHASER” Means the President <strong>of</strong> India acting through his accredited <strong>of</strong>ficers or any one <strong>of</strong> them.The Chief Administrative Officer / IRPMU, North Central Railway New Delhi shall be deemed to be one <strong>of</strong>such accredited <strong>of</strong>ficers.18


Subject as otherwise provided in this contract, all notices to be given <strong>and</strong> all other action to be taken onbehalf <strong>of</strong> President <strong>of</strong> India may be given or taken on his behalf by General Manager, North CentralRailway Allahabad/ Chief Administrative Officer, North Central Railway New Delhi or any otherrepresentative <strong>of</strong> the North Central Railway Administration nominated by him.“PURCHASER’S ENGINEERS" Means the Chief Administrative Officer / IRPMU North Central Railwayor successor who will decide all matters relating to survey, design, manufacture, installation <strong>and</strong>commissioning <strong>of</strong> the plant <strong>and</strong> equipment at site."RAILWAY” Shall mean the President <strong>of</strong> the Republic <strong>of</strong> India or the Administrative Officers <strong>of</strong> theRailway or <strong>of</strong> the successor Railway authorised to deal with any matters with which these present areconcerned on his behalf."SUB­CONTRACTOR" Means an individual or a firm <strong>of</strong> Contractor or a Company registered underIndian Company Act or an approved supplier <strong>of</strong> materials to whom the Contractor sublets portions <strong>of</strong>the contract after obtaining specific prior approval <strong>of</strong> the Purchaser in writing to sub‐letting <strong>of</strong> contract."SITE" Means the areas to be taken up for the execution <strong>of</strong> works, together with any other area orareas as shall be determined by the Purchaser's Engineers, which may be placed at the disposal <strong>of</strong> theContractor for the purpose <strong>of</strong> the contract <strong>and</strong> also such area or areas as the Purchaser' Engineers mayhave authorized as an extension <strong>of</strong> the site, irrespective <strong>of</strong> the terms <strong>and</strong> conditions under which theyare occupied by the Contractor."TENDERER" Means <strong>and</strong> includes any agency or Contractors or any company or body, corporate orotherwise, who submit the Tender which has been invited.“WORK OR WORKS" Means all or any <strong>of</strong> the items <strong>of</strong> the work for which the Tenderer/ Contractorhas Tendered/contracted according to the specifications, drawings <strong>and</strong> Annexure hereto annexed orto be implied there from, or incidental thereto or to be hereafter specified or required in suchexplanatory instructions <strong>and</strong> drawings, being in conformity with the original specifications, drawings,Annexure <strong>and</strong> schedules, <strong>and</strong> also such instructions <strong>and</strong> drawings additional to the aforementioned asmay from time to time be issued by the Purchaser's Engineer during the progress <strong>of</strong> the contractedwork."WRITING" Includes all matters written, typewritten or printed either in whole or in part.3. LOCAL CONDITIONS :3.1 It will be imperative on each tenderer to fully acquaint himself with all the local conditions <strong>and</strong>factors which would have any effect on the performance <strong>of</strong> the contract. The purchaser shall notentertain any request for clarifications from the tenderer regarding such local conditions. No requestfor the change <strong>of</strong> price shall be entertained after the <strong>of</strong>fer is accepted by the purchaser on account <strong>of</strong> anylocal condition or factor.3.2 In the event <strong>of</strong> the tenderer desiring to have a field survey before furnishing his quotations, he mayapply to Railways for permission in this regard. Such permission will be given in writing by theRailways but the expenses in this regard will be borne by the tenderer completely.3. 3 The intending tenderer is advised to study the tender papers carefully. Any submission <strong>of</strong> a quotation bythe tenderer shall be deemed to have been done after a careful study <strong>and</strong> examination <strong>of</strong> thesedocuments with full underst<strong>and</strong>ing <strong>of</strong> the implication there<strong>of</strong>. These conditions <strong>and</strong> specifications shallbe deemed to have been accepted unless otherwise, specifically commented upon by the Tenderer in hisquotation. Failure to adhere to anyone or all these instructions may render his <strong>of</strong>fer liable to be ignoredwithout any reference.3.4 Should a tenderer find discrepancies in or omission from any <strong>of</strong> the Tender papers or he has any doubtto their meaning, he should at once notify the Railway who may send a written clarification to alltenderers.19


4. COMPLIANCE TO TENDER CONDITIONS, TECHNICALSPECIFICATION & DRAWINGS4.1 Tenderer should note that the TPWS equipment <strong>of</strong>fered should be complete <strong>and</strong> compatible with thesignaling equipment, on NC Railway. Any equipment/work required to make the interface equipmentsmatch with outdoor signaling equipment is the responsibility <strong>of</strong> the contractor. North Central Railwaywill not undertake any change in their signaling equipment, nor shall bear any extra cost on account <strong>of</strong>changes/addition required for ensuring compatibility <strong>of</strong> interface devices with outdoor signalingequipment.4.2 The tenderer shall indicate paragraph by paragraph for each section <strong>and</strong> each clause <strong>and</strong> sub‐clause <strong>of</strong>the entire tender document that either his tender complies in every respect with the requirements <strong>of</strong>each clause <strong>and</strong> sub‐clause or if not, precisely how they differ from the requirements <strong>of</strong> the tenderer. Inlater case, the tenderer shall enclose a separate statement as per pro‐forma given, indicating only thedeviations for any clause or sub‐clause <strong>of</strong> General Conditions <strong>of</strong> Contract, Special Conditions <strong>of</strong> Contract,Instructions to tenderers <strong>and</strong> conditions <strong>of</strong> tendering, Preamble etc. which he proposes with "detailedjustifications for deviations proposed". The purchaser, reserves the right to accept or reject thesedeviations <strong>and</strong> his decision thereon shall be final (see Form 5).4.3 The equipment <strong>and</strong> material <strong>of</strong>fered shall be in accordance with the drawings <strong>and</strong> specifications. Details<strong>of</strong> variation from the drawings <strong>and</strong> specifications, if any, should be clearly indicated <strong>and</strong> in such anevent, a certificate from the users must be furnished to effect that the product <strong>of</strong>fered perform thatrequisite function satisfactorily, <strong>and</strong> is an alternative acceptable in one <strong>and</strong> more other country. Thename <strong>of</strong> user in those foreign countries should also be indicated.4.4 Firms who have not carried out such works <strong>and</strong> tendered for in this case for the Indian Railways in thepast should give details <strong>of</strong> works carried out <strong>and</strong> the customers along with their performancecertificates.5 EARNEST MONEY/BID GUARANTEE :5.1 The tenderer shall deposit Earnest Money in favour <strong>of</strong> the Financial Adviser & Chief Accounts Officer,IRPMU, Shivaji Bridge, New Delhi‐110001, a sum <strong>of</strong> 6,06,000/­ only as Earnest Money.5.2 The Earnest Money receipt shall be incorporated in the original copy <strong>of</strong> the tender document. The othercopies <strong>of</strong> the <strong>of</strong>fer shall contain true copies <strong>of</strong> Earnest Money receipt. The Earnest Money should befurnished either in cash or in any <strong>of</strong> the following forms:‐(a)(b)Deposit receipt, pay orders, Dem<strong>and</strong> Drafts. These should be either <strong>of</strong> the State Bank <strong>of</strong> India or any <strong>of</strong> theNationalized Bank. No confirmatory advice from the Reserve Bank <strong>of</strong> India will be necessary.Deposit receipt, pay orders, Dem<strong>and</strong> Drafts executed by the Schedule Banks (other than the State Bank <strong>of</strong>India <strong>and</strong> the Nationalized Banks) approved by RBI for this purpose.NOTE: (a) In case the Earnest Money is deposited in cash the payment should be made to the Chief Cashier,North Central Railway, Allahabad <strong>and</strong> cash receipts obtained from him should be furnished along with thetender.(b) Deposit receipts, Pay Order <strong>and</strong> Dem<strong>and</strong> Drafts should be drawn in favour <strong>of</strong> the FinancialAdviser & Chief Accounts Officer, IRPMU, Shivaji Bridge, New Delhi 110001 <strong>and</strong> endorsed "Account Payee".These instruments should be valid at least for the period covering the validity <strong>of</strong> the <strong>of</strong>fer.5.3 No reference to the previous deposit <strong>of</strong> Earnest Money & Security Deposit for adjustment against thepresent tender will be accepted <strong>and</strong> any request for recovery from any Security Deposit against presenttender will not be entertained.5.4 The Earnest Money shall remain deposited with the Purchaser for the period <strong>of</strong> 180 days from the date<strong>of</strong> opening <strong>of</strong> the tender. If the validity <strong>of</strong> the <strong>of</strong>fer is extended, the Earnest Money Deposit dulyextended shall also be furnished, failing which the <strong>of</strong>fer after the expiry <strong>of</strong> the aforesaid period shall notbe considered by the Purchaser.5.5 No interest will be payable by the Purchaser on the Earnest Money.20


5.6 The Earnest Money deposited is liable to be forfeited if the tenderer withdraws or amends impairs orderogates from the tender in any respect within the period <strong>of</strong> validity <strong>of</strong> his <strong>of</strong>fer.5.7 The Earnest Money <strong>of</strong> the successful tenderer will be returned after the Security Deposit as requiredunder the special conditions <strong>of</strong> contract is furnished <strong>and</strong> formal contract duly signed is received by thePurchaser.5.8 If the successful tenderer fails to furnish a Security Deposit as required in the Special Conditions <strong>of</strong>Contract <strong>and</strong> fails to return the formal contract duly signed within (30) thirty days <strong>of</strong> the receipt <strong>of</strong> theformal contract, then the Earnest Money shall be liable to be forfeited by the Purchaser.5.9 The Earnest Money <strong>of</strong> all unsuccessful tenderers will be returned by the Purchaser within reasonabletime after the finalisation <strong>of</strong> the tender.5.10 Any tender not accompanied by Earnest Money in one <strong>of</strong> the approved forms will be summarily rejected.6. SUBMISSION OF OFFERS:6.1 All <strong>of</strong>fers in the prescribed forms should be submitted before the time <strong>and</strong> date fixed for the receipt <strong>of</strong>the <strong>of</strong>fers. Offers received after the stipulated time <strong>and</strong> date will be dealt with as per rules in vogue inthe Railways.6.2 In case the date <strong>of</strong> opening happens to be a holiday or B<strong>and</strong>h, the tender will be received <strong>and</strong> opened atthe same time on the next working day.6.3 All <strong>of</strong>fers shall be either type written or written neatly in indelible ink in English. Each page <strong>of</strong> the <strong>of</strong>fermust be numbered consecutively. A reference to total number <strong>of</strong> pages comprising the <strong>of</strong>fer must bemade at the top right h<strong>and</strong> corner <strong>of</strong> the top page. All the supporting documents should be submittedeither in original or duly attested by a Gazetted Officer or notary public unless stated otherwise in thesedocuments. The original documents shall be produced for verification when called for.6.4 All copies <strong>of</strong> the tender paper shall be signed in ink by the tenderer, on each page including closing page,in token <strong>of</strong> his having studied the Tender papers carefully.6.5 RATES IN FIGURES & WORDS: ­ All prices <strong>and</strong> other information like discounts etc. having a bearing onthe price shall be written both in figures <strong>and</strong> in words in the prescribed <strong>of</strong>fer form. In case <strong>of</strong> differencein words <strong>and</strong> figures the amount written in words will be taken into consideration.6.6 ATTESTATION OF ALTERATION: ­ No scribbling is permissible in the tender documents. Tendercontaining erasures <strong>and</strong> alterations in the tender documents are liable to be rejected. Any correctionmade by the tenderer/tenderers in his/their entries must be attested by him/them.6.7 The tenderer shall submit his tender in two copies in sealed cover. Each copy <strong>of</strong> the tender shall becomplete in all respects. The two copies should be marked "Original" <strong>and</strong> “Duplicate”. The originaltender paper purchased from this <strong>of</strong>fice shall be returned duly signed along with the original <strong>of</strong>fer.6.8 The tender is a single packet system. The tender in two copies shall be submitted in sealed in separateenvelope <strong>and</strong> both envelopes put in large envelope. All the envelopes should bear the tender numberwith it’s description <strong>and</strong> date <strong>of</strong> closing/opening clearly written on it <strong>and</strong> addressed to the ChiefAdministrative Officer, IRPMU, Shivaji Bridge (IRCOT complex) New Delhi 110001.21


(a)Part ‐ I “ Credential Bid”:‐ Full Technical Specification <strong>of</strong> the equipment <strong>and</strong> sub‐ systems. A briefoutline <strong>of</strong> the system being proposed along with diagrams <strong>and</strong> drawings, description <strong>of</strong> the equipment<strong>and</strong> specifications shall be enclosed. Details <strong>of</strong> proposed <strong>of</strong> power supply System shall also be included.The bid shall consist <strong>of</strong> the following :‐I. Offer letter complete. Form No.1II.III.IV.Schedule <strong>of</strong> supply <strong>and</strong> execution with summary <strong>of</strong> prices blanked out.Earnest money in prescribed form. (Para 5.0 <strong>of</strong> I.T.T.)Clause‐wise compliance to tender conditions & Statements <strong>of</strong> deviations. Form No. 5 (Para4 <strong>of</strong> I.T.T.)V. A copy <strong>of</strong> partnership deed <strong>and</strong> affidavit for proprietorship. (Para 7 <strong>of</strong> I.T.T.)VI.VII.VIII.IX.Joint venture agreement if formed a JV (Para 18 <strong>of</strong> I.T.T. & Annexure U).Tenderer's credentials <strong>and</strong> willingness <strong>of</strong> original manufacturer as per Form No.13Qualifying Criteria (General) (Para 17 & Para 18 <strong>of</strong> I.T.T.).Similar works executed. (Para 17.2.2.6 &Para 18.2 <strong>of</strong> I.T.T.)Works in h<strong>and</strong> (As per Form‐13)X. Audited balance sheet (Para 18.3 <strong>of</strong> I.T.T.)XI.XII.Engineering Organisation. (Para 31 <strong>of</strong> I.T.T.)Construction machinery. ( Para 32 <strong>of</strong> I.T.T.)XIII. Details <strong>of</strong> recommend spares with quantities.(S.C.C Para 13)XIV. Details <strong>of</strong> special tools <strong>and</strong> installation materials (S.C.C. Para 10)XV.XVI.XVII.XVIII.XIX.XX.System performance guarantee (Para 22 <strong>of</strong> I.T.T.).Tenderers scheme <strong>of</strong> work <strong>and</strong> Time Schedule (Para 12 <strong>of</strong> I.T.T.).Complete technical data <strong>and</strong> particulars <strong>of</strong> the equipment <strong>of</strong>fered, as specified in the Tenderpapers together with descriptive literature, leaflets etc. Drawings, if any, complete with list .Name <strong>of</strong> manufactures, place <strong>of</strong> manufactures <strong>and</strong> the certificate for proven design <strong>and</strong>performance .Technical proposal <strong>of</strong> the tenderer in conformity with system design or alternative proposal<strong>of</strong> the tenderer, if any.Any other information desired to be submitted by the tenderer.Note:­ The Credential bid (part ‐1) under no circumstance should contain the rates <strong>of</strong>fered otherwisethe tender shall be summarily rejected. This envelop shall be clearly super–scribed with “Credential Bid(Part‐I)” along with tender number <strong>and</strong> it’s description <strong>and</strong> sealed.(b) Part – II “Price Bid” shall contain the <strong>of</strong>fer letter <strong>and</strong> the price <strong>of</strong> each item quoted exactly accordingto the rate schedule given in the tender document <strong>and</strong> shall be clearly super‐ scribed with “Price Bid(Part‐II)” along with tender number <strong>and</strong> it’s description <strong>and</strong> sealed.7. CONSTITUTION OF FIRM & POWER OF ATTORNEY:7.1 Any individual(s) signing the tender or other documents connected therewith should specify whether heis signing: ‐(a) As sole proprietor <strong>of</strong> the concern or as attorney <strong>of</strong> the sole proprietor;(b) As a partner or partners <strong>of</strong> the firm;(c) As a Director, Manager or Secretary in the case <strong>of</strong> Limited Company duly authorised by a resolutionpassed by the Board <strong>of</strong> Directors or in pursuance <strong>of</strong> the authority conferred by Memor<strong>and</strong>um <strong>of</strong>Association.22


7.2 In the case <strong>of</strong> a firm not registered under the Indian Partnership Act, the names <strong>of</strong> all the existingpartners <strong>and</strong> their full particulars should be furnished at the time <strong>of</strong> submitting the tender <strong>and</strong> all thepartners with their full particulars or the attorney duly authorised by all <strong>of</strong> them should sign the tender<strong>and</strong> all other connected documents. The original power <strong>of</strong> attorney or other documents empoweringthe individual or individuals to sign should be furnished to the Purchaser for verification, if required.7.3 The Railway will not be bound by Power <strong>of</strong> Attorney granted by the tenderer or by the changes in thecomposition <strong>of</strong> the firm made subsequent to the execution <strong>of</strong> the contract. It may, however, recognisesuch power <strong>of</strong> attorney <strong>and</strong> advice, the cost <strong>of</strong> which will be chargeable to the contractor. These chargeshave been fixed at 100/­ (Rupees One Hundred only) payable by the tenderer at the time <strong>of</strong> submittingthe Power <strong>of</strong> Attorney for Scrutiny <strong>and</strong> legal advice.7.4 In case where the Power <strong>of</strong> Attorney partnership deed has not been executed in English, the true <strong>and</strong>authenticated copies <strong>of</strong> the translation <strong>of</strong> the same by Advocate, authorised translators <strong>of</strong> Courts <strong>and</strong>Licensed Petition Writers should be supplied by the Contractor(s) while tendering for the work.7.5 The cancellation <strong>of</strong> any documents such as Power <strong>of</strong> Attorney, Partnership deed etc. should be forthwithcommunicated by the contractor to the Railway Administration in writing failing which the RailwayAdministration shall have neither responsibility nor liability for any act so taken on the strength <strong>of</strong> thesaid documents.8. UNIT PRICES:8.1 It is necessary that the rates are to be quoted separately on unit basis for each item shown in theSchedule <strong>of</strong> items <strong>of</strong> work.8.2 The unit Prices should be quoted by the Contractor after taking all the relevant factors intoconsideration <strong>and</strong> these should be Firm <strong>and</strong> all inclusive without any variation clauses. The prices shallbe quoted in Indian Rupees. Reference may be made to para‐38 <strong>of</strong> Special Conditions <strong>of</strong> Contract.9. VALIDITY OF OFFER:9.1 The tenderer shall keep the <strong>of</strong>fer open for a period as mentioned in preamble. Within that period, thetenderer can not withdraw his <strong>of</strong>fer subject to the period being extended further if required by mutualagreement from time to time. Any contravention <strong>of</strong> the above condition will make the tenderer liable forforfeiture <strong>of</strong> his Earnest Money Deposit.10. RATES DURING NEGOTIATION:10.1 The tenderer/s shall not increase his/their quoted rates in case the Railway Administration negotiatefor reduction <strong>of</strong> rates, such a negotiation shall not amount to cancellation or withdrawal <strong>of</strong> the original<strong>of</strong>fer <strong>and</strong> the rates originally quoted will be binding on the tenderer/s.11. INCOME TAX CLEARANCE CERTIFICATE:11.1 The income tax certificate has been abolished vide letter No.(RB/CE/2/2003) dated 06-05-200312. PERIOD OF COMPLETION & TIME PROGRESS GRAPH:12.1 The duration <strong>of</strong> works/work are/is as mentioned in preamble from the date <strong>of</strong> issue <strong>of</strong> Letter <strong>of</strong>Acceptance <strong>of</strong> the tender.12.2 The Tenderer shall enclose with his <strong>of</strong>fer the scheme <strong>of</strong> work <strong>and</strong> time schedule in the form <strong>of</strong> PERTchart indicating all activites & showing the period <strong>of</strong> time that he will take for the various items <strong>of</strong> worklisted therein. The Tenderer shall indicate in the form <strong>of</strong> notes to the schedule the assumptions <strong>and</strong> thebasis adopted for the preparation <strong>of</strong> the time schedule.12.3 The Successful Tenderer shall, however, submit their final programme in consultation with Engineer <strong>of</strong>the project in terms <strong>of</strong> clause 6 <strong>of</strong> Special condition <strong>of</strong> Contract.23


13. OPENING OF TENDER:13.1 The Credential Bid (Part‐I) <strong>and</strong> the Price Bids (Part‐II)<strong>of</strong> tender will be opened simultaneously at thetime & date <strong>of</strong> opening <strong>of</strong> the tender given in the preamble in presence <strong>of</strong> such <strong>of</strong> suchTenderers/Representatives who choose to be present. The tender is a single packet system only.13.2 If the <strong>of</strong>fers are sent by post, should be sent only by registered post with acknowledgement due addressto the Chief Administrative Officer, IRPMU, Shivaji Bridge (IRCOT complex) New Delhi 110001 beforethe closing time <strong>and</strong> date given in the preamble.14. NON­TRANSFERABILITY & NON­REFUNDABILITY: ­The tender documents are not transferable. The cost <strong>of</strong> tender paper is not refundable. The downloadedtender document will be submitted alongwith the cost <strong>of</strong> the tender document.15. ERRORS OMISSIONS & DISCREPANCIES:The Contractor(s) shall not take any advantage <strong>of</strong> any misinterpretation <strong>of</strong> the conditions due to typingor any other error <strong>and</strong> if in doubt shall bring it to the notice <strong>of</strong> the Engineer, without delay. In case <strong>of</strong>any contradiction only the printed rules, <strong>and</strong> books should be followed <strong>and</strong> no claim for themisinterpretation shall be entertained.16. WRONG INFORMATION BY TENDERER:If the tenderer/s deliberately gives/give wrong information in his/their tender, creates/createcircumstances for the acceptance <strong>of</strong> his/their tender, the Railway reserve the right to reject such tenderat any stage.17. QUALIFICATION CRITERIA:17.1 GENERAL:17.1.1 Qualification criteria under this Para lays down minimum acceptable qualifications in various areas to ensurethat qualified bidder has necessary experience, expertise, financial <strong>and</strong> human resources to successfullycomplete the project. In case <strong>of</strong> a joint venture (JV), the qualification document details etc. must be providedfor each member <strong>of</strong> JV.17.2 QUALIFYING AND ELIGIBILITY CRITERIA:17.2.1 Firm(s) meeting the criteria as under may participate in the tendera) Indian firm having experience in the field <strong>of</strong> Railway Signaling <strong>and</strong> which is an originalequipment manufacturer (OEM) <strong>of</strong> on‐board <strong>and</strong> track‐side/line‐side equipments <strong>of</strong> any trainprotection system including the installation <strong>and</strong> commissioning <strong>of</strong> such system(s).ORb) Indian firm which is a subsidiary (as defined in Indian Companies Act) or an associate (asdefined in note below) <strong>of</strong> foreign OEM which has also installed & commissioned on‐board <strong>and</strong>track‐side/line‐side equipments <strong>of</strong> any train protection system. The credential <strong>of</strong> OEM shall beeligible for consideration for satisfying the minimum eligibility criteria. Supportingdocument(s) about relationship <strong>of</strong> the OEM <strong>and</strong> Indian firm shall be submitted with the tender<strong>of</strong>fer.ORc) Joint Venture firms (JV) where the JV or any one <strong>of</strong> its constituent members is originalequipment manufacturer (OEM) <strong>of</strong> on‐board <strong>and</strong> track‐side/line‐side equipment <strong>of</strong> any trainprotection system. The collective experience <strong>of</strong> the constituent members <strong>of</strong> the JV should meetrequirement <strong>of</strong> manufacturer, installation <strong>and</strong> commissioning <strong>of</strong> such system(s). At least oneIndian constituent members <strong>of</strong> the JV shall have experience <strong>of</strong> execution <strong>of</strong> Railway Signaling24


work or be manufacturer <strong>of</strong> Railway Signaling equipment. Other detailed guidelines forparticipation <strong>of</strong> joint venture firms in works tender are given in the tender document.Note:­ For purpose <strong>of</strong> this tender, “Associate” means, in relation to the Indian firm/one <strong>of</strong> theJV members, a person who controls, is controlled by, or is under the common control with suchIndian firm/ one <strong>of</strong> the JV members (the “Associate”). As used in this definition, the expression“control” means, with respect to a person which is a company or a corporation, the ownership,directly or indirectly, or more than 50% (fifty percent) <strong>of</strong> the voting shares <strong>of</strong> such person, <strong>and</strong>with respect to a person which is not a company or corporation, the power to direct themanagement <strong>and</strong> policies <strong>of</strong> such person by operation <strong>of</strong> law.”17.2.2 The tender by Indian firm shall satisfy the minimum eligibility criteria as given below (in conjunction withPara 17.1 above):17.2.2.1 At least one similar single work for a minimum value <strong>of</strong> 35% <strong>of</strong> advertised tender value is satisfactorily<strong>and</strong> physically completed within the qualifying period i.e. the last 3 financial years <strong>and</strong> current financialyear (even though the work might have commenced before the qualifying period) by the firm or theOEM to which the firm is subsidiary or associate. Certificate to this effect shall be submitted from theuser or the statutory auditor.17.2.2.2 The tenderer or the OEM should have executed the similar work directly or as a subcontractor to primecontractor. In case the work is executed as a subcontractor, the final commissioning certificate from theend user should be enclosed. For the purpose <strong>of</strong> the value <strong>of</strong> the similar work completed, a certificatefrom a prime contractor <strong>and</strong> end user or statutory auditor shall be enclosed. The said credential shall beused by either the prime contractor or the sub contractor in the tender.17.2.2.3 The total value <strong>of</strong> similar nature <strong>of</strong> work completed during the qualifying period <strong>and</strong> not the paymentsreceived within qualifying period alone, should be considered.17.2.2.4 In case, the final bill <strong>of</strong> similar nature <strong>of</strong> work has not been passed <strong>and</strong> final measurements have not beenrecorded, the paid amount including statutory deduction is to be considered. If final measurements havebeen recorded <strong>and</strong> work has been completed with negative variation, then also paid amount includingstatutory deduction is to be considered.17.2.2.5 However, if final measurements have been recorded, <strong>and</strong> work has been completed with positivevariation, but variation has not been sanctioned, original agreement value or last sanctioned agreementvalue whichever is lower shall be considered for judging eligibility.17.2.2.6 Similar work is defined as “<strong>Survey</strong>, <strong>Supply</strong>, <strong>Installation</strong>, <strong>Testing</strong> <strong>and</strong> <strong>Commissioning</strong> <strong>of</strong> On-boardequipments <strong>of</strong> any Train Protection System on any passenger carrying railway in the world.”Or“<strong>Survey</strong>, <strong>Supply</strong>, <strong>Installation</strong>, <strong>Testing</strong> <strong>and</strong> <strong>Commissioning</strong> <strong>of</strong> track-side/line-side equipments <strong>of</strong> anyTrain Protection System on any passenger carrying railway in the world.”Or“<strong>Survey</strong>, <strong>Supply</strong>, <strong>Installation</strong>, <strong>Testing</strong> <strong>and</strong> <strong>Commissioning</strong> <strong>of</strong> On-board <strong>and</strong> track-side/line-side equipments<strong>of</strong> any Train Protection System on any passenger carrying railway in the world.”17.2.3 Total contract amount received during the last three financial years <strong>and</strong> in the current financial year should bea minimum <strong>of</strong> 150% <strong>of</strong> advertised tender value. Tender committee would satisfy themselves about theauthenticity <strong>of</strong> the certificates produced by the tenderer (s) to this effect which may be an attested certificatefrom the employer/client, audited balance sheet duly certified by chartered accountant etc.25


17.2.4 If the cost <strong>of</strong> works submitted for technical credential is in foreign currency, the same will be converted intoIndian rupees as per conversion rate applicable on the date <strong>of</strong> the agreement <strong>of</strong> that work.17.2.5 If the cost <strong>of</strong> works submitted for financial credential is in foreign currency, the same will be converted intoIndian rupees as per conversion rate applicable on the date <strong>of</strong> opening <strong>of</strong> this tender.18 JOINT VENTURE FIRMSIn view <strong>of</strong> nature <strong>of</strong> work covered in the Bid documents, it is anticipated that some <strong>of</strong> the intendingbidders will pool their resources <strong>and</strong> experience to form Joint Venture (JV). In their own interest, thebidders who form JV are advised to investigate capabilities, availability <strong>of</strong> resources, experiencedpersonnel, financial soundness, past experience <strong>and</strong> concurrent engagements <strong>of</strong> constituting partners.Following are the guidelines for participation <strong>of</strong> joint venture firms in works tender (Works tender <strong>of</strong>value more than 25.0 Crore)18.1.1 Separate identity/name shall be given to the Joint Venture firm.18.1.2 Number <strong>of</strong> members in a JV firm shall not be more than three <strong>of</strong> the work involves only one department (sayCivil or S&T or Electrical) <strong>and</strong> shall not be more than five if the work involves more than one department.18.1.3 A member <strong>of</strong> JV firm shall not be permitted to participate either in individual capacity or as a member <strong>of</strong>another JV firm in the same tender.18.1.4 The tender form shall be purchased <strong>and</strong> submitted only in the name <strong>of</strong> the JV firm <strong>and</strong> not in the name <strong>of</strong> anyconstituent member.18.1.5 Normally EMD shall be submitted only in the name <strong>of</strong> the JV <strong>and</strong> not in the name <strong>of</strong> constituent member.However, in exceptional cases EMD in the name <strong>of</strong> lead partner can be accepted subject to submission <strong>of</strong>specific request letter from lead partner stating the reasons for not submitting the EMD in the name <strong>of</strong> JV <strong>and</strong>giving written confirmation from the JV partners to the effect that the EMD submitted by the lead partner maybe deemed as EMD submitted by JV firm.18.1.6 One <strong>of</strong> the members <strong>of</strong> the JV firm shall be the lead member <strong>of</strong> the JV firm who shall have a majority ( atleast 51%) share <strong>of</strong> interest in the JV firm. The other members shall have a share <strong>of</strong> not less than 20% each incase <strong>of</strong> JV firms with up to three members <strong>and</strong> not less than 10% each in case <strong>of</strong> JV firms with more than threemembers. In case <strong>of</strong> JV firms with foreign member(s), the lead member has to be an Indian firm with aminimum share <strong>of</strong> 51%.18.1.7 A copy <strong>of</strong> Memor<strong>and</strong>um <strong>of</strong> Underst<strong>and</strong>ing (MOU) executed by the JV members shall be submitted by the JVfirm along with the tender. The complete details <strong>of</strong> the members <strong>of</strong> the JV firm, their share <strong>and</strong> responsibilityin the JV firm etc. particularly with reference to financial technical <strong>and</strong> other obligations shall be furnished inthe MOU. The MOU format for this purpose is enclosed along with the tender as Annexure-U as enclosed.18.1.8 Once the tender is submitted, the MOU shall not be modified/altered/terminated during the validity <strong>of</strong> thetender. In case the tenderer fails to observe/comply with this stipulation, the full Earnest Money Deposit(EMD) shall be forfeited. In case <strong>of</strong> successful tenderer, the validity <strong>of</strong> this MOU shall be extended till thecurrency <strong>of</strong> the contract expires.18.1.9 Approval for change <strong>of</strong> constitution <strong>of</strong> JV firm shall be at the sole discretion <strong>of</strong> the Employer (Railways). Theconstitution <strong>of</strong> the JV firm shall not be allowed to be modified after submission <strong>of</strong> the tender bid by the JVfirm except when modification becomes inevitable due to succession laws etc. <strong>and</strong> in any case the LeadMember should continue to be the Lead Member <strong>of</strong> the JV firm. Failure to observe this requirement wouldrender the <strong>of</strong>fer invalid.26


18.1.10 Similarly, after the contract is awarded, the constitution <strong>of</strong> JV firm shall not be allowed to be altered duringthe currency <strong>of</strong> contract except when modification become inevitable due to succession laws etc <strong>and</strong> in anycase the minimum eligibility criteria should not get vitiated. Failure to observe this stipulation shall be deemedto be breach <strong>of</strong> contract with all consequential penal action as per contract conditions.18.1.11 On award <strong>of</strong> contract to a JV firm, a single Performance Guarantee shall be required to be submitted by the JVfirm as per tender conditions. All the Guarantee like Performance Guarantee, Bank Guarantee for Mobilizationadvance, machinery Advance etc. shall be accepted only in the name <strong>of</strong> the JV firm <strong>and</strong> no splitting <strong>of</strong>guarantees amongst the members <strong>of</strong> the JV firm shall be permitted.18.1.12 On issue <strong>of</strong> LOA, an agreement among the members <strong>of</strong> the JV firm (to whom the work has been awarded) hasto be executed <strong>and</strong> got registered before the Registrar <strong>of</strong> the Companies under Companies Act or before theRegistrar Sub-Registrar under the Registration Act, 1908. This agreement shall be submitted by the JV firm tothe Railways before signing the contract agreement for the work. (This agreement format should invariably bepart <strong>of</strong> the tender condition). In case the tenderer fails to observe/comply with this stipulation, the full EarnestMoney Deposit (EMD) shall be forfeited <strong>and</strong> other penal actions due shall be taken against partners <strong>of</strong> the JV<strong>and</strong> the JV. This joint venture agreement shall have, inter-alia, the following clauses :18.1.12.1 Joint <strong>and</strong> several liabilities – The members <strong>of</strong> the JV firm to which the contract is awarded shall bejointly <strong>and</strong> severally liable to the Employer (Railways) for execution <strong>of</strong> the project in accordance withGeneral <strong>and</strong> Special conditions <strong>of</strong> the contract. The JV members shall also be liable jointly <strong>and</strong>severally for the loss, damages caused to the Railways during the course <strong>of</strong> execution <strong>of</strong> the contractor due to non-execution <strong>of</strong> the contract or part there<strong>of</strong>.18.1.12.2 Duration <strong>of</strong> the Joint Venture Agreement - It shall be valid during the entire currency <strong>of</strong> thecontract including the period <strong>of</strong> extension if any <strong>and</strong> the maintenance period after the work iscompleted.18.1.12.3 Governing Laws - The Joint Venture Agreement shall in all respect be governed by <strong>and</strong> interpretedin accordance with Indian Laws.18.1.13 Authorized Member – Joint Venture members shall authorize one <strong>of</strong> the members on behalf <strong>of</strong> the JointVenture firm to deal with the tender, sign the agreement or enter into contract in respect <strong>of</strong> the said tender, toreceive payment, to witness joint measurement <strong>of</strong> work done, to sign measurement books <strong>and</strong> similar suchaction in respect <strong>of</strong> the said tender/contract. All notices/correspondences with respect to the contract would besent only to this authorized member <strong>of</strong> the JV firm.18.1.14 No member <strong>of</strong> the Joint Venture firm shall have the right to assign or transfer the interest right or liability inthe contract without the written consent <strong>of</strong> the other members <strong>and</strong> that <strong>of</strong> the employer (Railways) in respect <strong>of</strong>the said tender/contract.18.1.15 Documents to be enclosed by the JV firm along with the tender :18.1.15.1 In case one or more <strong>of</strong> the members <strong>of</strong> the JV firm is/are partnership firm(s), the following documentsshall be submitted:a. Notary certified copy <strong>of</strong> the Partnership Deed.b. Consent <strong>of</strong> all the partners to enter into the Joint Venture Agreement on a stamp paper <strong>of</strong> appropriatevalue (in original).c. Power <strong>of</strong> the Attorney (duly registered as per prevailing law) in favour <strong>of</strong> one <strong>of</strong> the partners to sign theMOU <strong>and</strong> JV Agreement on behalf <strong>of</strong> the partners <strong>and</strong> create liability against the firm.18.1.15.2 In case one or more members is/are Proprietary Firm or HUF, the following documents shall be enclosed:Affidavit on Stamp Paper <strong>of</strong> appropriate value declaring that his concern is a Proprietary Concern <strong>and</strong> he issole proprietor <strong>of</strong> the Concern OR he is in position <strong>of</strong> “KARTA” <strong>of</strong> Hindu Undivided Family <strong>and</strong> he hasthe authority, power <strong>and</strong> consent given by other partners to act on behalf <strong>of</strong> HUF.18.1.15.3 In case one or more members is/are limited companies, the following documents shall be submitted:a. Notary certified copy <strong>of</strong> the resolution <strong>of</strong> the Directors <strong>of</strong> the Company, permitting the company toenter in to a JV agreement, authorizing MD or one <strong>of</strong> the Directors or Managers <strong>of</strong> the Company tosign MOU, JV agreement, such other documents required to be signed on behalf <strong>of</strong> the Company<strong>and</strong> enter into liability against the company <strong>and</strong>/or do any other act on behalf <strong>of</strong> the company.b. Copy <strong>of</strong> Memor<strong>and</strong>um <strong>and</strong> articles <strong>of</strong> Association <strong>of</strong> the Company.27


c. Power <strong>of</strong> Attorney (duly registered as per prevailing law) by the company authorizing the person todo/act mentioned in the Para (a) above.18.1.16 All the members <strong>of</strong> the JV shall certify that they have not been black listed or debarred by Railways or anyother Ministry/Department <strong>of</strong> the Govt. <strong>of</strong> India/State Govt. from participation in tenders/contract on the date<strong>of</strong> opening <strong>of</strong> bids either in their individual capacity or the JV firm or partnership firm in which they were /aremembers/partners.18.2 CREDENTIALS & QUALIFYING CRITERIA : Technical <strong>and</strong> financial eligibility <strong>of</strong> the JV Firm shallbe adjudged based on satisfactory fulfillment <strong>of</strong> the following criteria:18.2.1 Technical Eligibility Criteria (‘a’ or ‘b’ mentioned under ) :a) Either the JV Firm or Lead Member <strong>of</strong> the JV Firm must have satisfactorily completed in the last threeprevious financial years <strong>and</strong> the current financial year up to the date <strong>of</strong> opening <strong>of</strong> the tender, one similarsingle work for a minimum <strong>of</strong> 35% <strong>of</strong> advertised value <strong>of</strong> the tender.ORb) (i) In case <strong>of</strong> composite works ( e.g. works involving more than one distinct components, such as CivilEngineering works, S&T works, Electrical works, OHE works etc. <strong>and</strong> in the case <strong>of</strong> major bridgessubstructure,super structure etc.), for each component, at least 35 % <strong>of</strong> the value <strong>of</strong> any <strong>of</strong> suchcomponents individually for single similar nature <strong>of</strong> work should have been satisfactorily completedby the JV Firm or by any member <strong>of</strong> the JV Firm in the previous three financial years <strong>and</strong> the currentfinancial year up to the date <strong>of</strong> opening <strong>of</strong> tender. The member satisfying technical eligibility criteriafor the largest component <strong>of</strong> the work shall be the lead Member <strong>and</strong> that member shall have amajority ( at least 51%) share <strong>of</strong> interest in the JV Firm.(ii) In such cases, what constitutes a component in a composite work shall be clearly pre-defined withestimated tender cost <strong>of</strong> it, as part <strong>of</strong> the tender documents without any ambiguity. Any work or set <strong>of</strong>works shall be considered to be a separate component, only when cost <strong>of</strong> the component is more thanRs.2 crore each.(iii) However, as long as the JV Firm or any member <strong>of</strong> the JV Firm meets with the requirements, in oneor more components <strong>of</strong> the work, <strong>and</strong> has completed a minimum <strong>of</strong> 35 % <strong>of</strong> the advertised value <strong>of</strong>the tender for the same value <strong>of</strong> the component, <strong>and</strong> resultantly, all the members <strong>of</strong> the JVcollectively, then meet the prescribed technical eligibility criteria, the JV shall st<strong>and</strong> technicallyqualified.Note:Value <strong>of</strong> a completed work done by a member in an earlier JV Firm shall be reckoned only to theextent <strong>of</strong> the concerned member’s share in that JV Firm for the purpose <strong>of</strong> satisfying his/hercompliance to the above mentioned technical eligibility criteria in the tender under consideration.18.2.2 Similar work is defined as “<strong>Design</strong>, <strong>Supply</strong>, <strong>Installation</strong>, <strong>Testing</strong> <strong>and</strong> <strong>Commissioning</strong> <strong>of</strong> On-board TrainProtection System on any passenger carrying railway in the world”OR“<strong>Design</strong>, <strong>Supply</strong>, <strong>Installation</strong>, <strong>Testing</strong> <strong>and</strong> <strong>Commissioning</strong> <strong>of</strong> Track-side equipments <strong>of</strong> Train ProtectionSystem on any passenger carrying railway in the world.”OR“<strong>Design</strong>, <strong>Supply</strong>, <strong>Installation</strong>, <strong>Testing</strong> <strong>and</strong> <strong>Commissioning</strong> <strong>of</strong> On-board & Track-side equipments <strong>of</strong> TrainProtection System on any passenger carrying railway in the world.”18.2.3 Financial eligibility criteria:The contractual payments received by the JV firm or the arithmetic sum <strong>of</strong> contractual payments received byall the members <strong>of</strong> JV firm in the previous three financial years <strong>and</strong> the current financial year up to the date <strong>of</strong>opening <strong>of</strong> tender shall be at least 150% <strong>of</strong> the estimated value <strong>of</strong> the work as mentioned in the tender.NOTE: Contractual payment received by a member in an earlier JV firm shall be reckoned only to the extent <strong>of</strong> theconcerned member’s share in that JV firm for the purpose <strong>of</strong> satisfying compliance <strong>of</strong> the above mentionedfinancial eligibility criteria in tender under consideration.28


19 DETERMINATION OF RESPONSIVENESS­19.1 Purchaser will determine whether each bid is substantively responsive to the equipment <strong>of</strong> the biddingdocuments.19.2 For the purpose <strong>of</strong> this Clause, a substantively responsive bid is one, which conforms to all the terms,conditions <strong>and</strong> specifications <strong>of</strong> the bidding documents without material deviation or reservation. Amaterial deviation or reservation is one, which affects in substantial way the scope, quality orperformance <strong>of</strong> the works, or which limits in any substantial way, inconsistent with the biddingdocument, the Purchaser’s right or the bidder’s obligations under the Contract <strong>and</strong> the rectification <strong>of</strong>which deviation or reservation would affect unfairly the competitive position <strong>of</strong> other bidderspresenting substantively responsive bids.20. CORRECTION OF ERRORS –20.1 Bids determined to be substantively responsive will be checked by the Purchaser for any arithmeticerrors in computation <strong>and</strong> summation. The Purchaser will correct errors as follows: ‐a) Where there is a discrepancy between amounts in figures <strong>and</strong> in words, the amount in words willgovern; <strong>and</strong>b) Where there is a discrepancy between the unit rate <strong>and</strong> the total amount derived from the multiplication<strong>of</strong> the unit rate <strong>and</strong> the quantity, the unit rate as quoted will govern, unless in the opinion <strong>of</strong> thePurchaser there is an obviously gross misplacement <strong>of</strong> the decimal point in the unit rate, in which eventthe total amount as quoted will govern <strong>and</strong> the unit rate will be corrected.20.2 The amount stated in the Form <strong>of</strong> Bid will be adjusted by the Purchaser in accordance with the aboveprocedure for the correction <strong>of</strong> errors <strong>and</strong> with the concurrence <strong>of</strong> the bidder, shall be considered asbinding upon the bidder. If the bidder does not accept the corrected amount <strong>of</strong> bid, his bid will berejected <strong>and</strong> the bid security will be forfeited.21. CONVERSION TO SINGLE CURRENCY i.e. RUPEES: ‐Should there be any necessity <strong>of</strong> conversion to a single currency i.e. Indian Rupees for the purpose <strong>of</strong>evaluation <strong>and</strong> comparison <strong>of</strong> <strong>of</strong>fers, the Purchaser will convert the foreign currency content <strong>of</strong> eachtender received into Rupees at the selling exchange rate for each currency established by the ReserveBank <strong>of</strong> India or any other Commercial Bank in the Purchaser's country, for similar transactions on theearlier <strong>of</strong> the following date, namely, on the day twenty eight days before the latest date <strong>of</strong> tender opening.22. SYSTEM PERFORMANCE GUARANTEE:22.1 Since the design <strong>of</strong> the system to achieve the end objective shall be checked <strong>and</strong> confirmed by thecontractor <strong>and</strong> the supply <strong>of</strong> t he materials will be according to this system design, the tenderer shallgive unqualified <strong>and</strong> unconditional guarantee that when the equipment supplied by him in installed <strong>and</strong>commissioned at site, it shall achieve the desired objective <strong>and</strong> that in the event <strong>of</strong> performance <strong>of</strong> thesystem when installed not complying with the end objective or with the specifications, he shall providefurther inputs to enable the Railways to realize the end objectives with full compliance <strong>of</strong> thespecifications contained in these documents. No additional payment will be made to the contractor forsupply <strong>of</strong> any additional goods <strong>and</strong> service required in this regard.22.2 This certificate in the pro‐forma given in Form No. 7, shall accompany the <strong>of</strong>fer. Absence <strong>of</strong> thiscertificate which will form part <strong>of</strong> the agreement shall disqualify the tenderer automatically.23. AUTHORITY FOR ACCEPTANCE:The authority for the acceptance <strong>of</strong> the tender will rest with the Purchaser. The purchaser shall not bebound to accept the lowest or any tender or to assign any reason for non‐acceptance or rejection <strong>of</strong> atender. The purchaser reserves the right to accept any tender in respect <strong>of</strong> the whole or any portion <strong>of</strong>the work specified in the tender paper or to sub‐divide the work among different Tenderers or toreduce the work or to accept any tender for less than the tendered quantities without assigning anyreason whatsoever.29


24. PURCHASE PREFERENCE (Not Applicable)10% purchase preference <strong>of</strong> lowest valid bid price, other things being equal for product & services willbe admissible for Central Public Sector Under taking in this tender subject to satisfaction <strong>of</strong> all otherTerms & Conditions.25. AGREEMENT:The successful tenderer/s shall be required to execute an agreement with the President <strong>of</strong> India actingthrough the Chief Administrative Officer, IRPMU, Shivaji Bridge (IRCOT Complex) New Delhi 110001 orhis accredited <strong>of</strong>ficer for carrying out the work according to the tender documents as indicated in Para 2<strong>of</strong> Special Conditions <strong>of</strong> Contract.26. TENDERER'S ADDRESS:Tenderer shall state in the tender his postal address fully <strong>and</strong> clearly. Any communication sent to thetenderers by post at his said address, shall be deemed to have reached the tenderer duly & timely, notwithst<strong>and</strong>ing the fact that the communication could not reach the tenderer at all or in time for whateverreason. Important documents shall be sent by Registered post.27. FOREIGN EXCHANGE:No foreign exchange <strong>and</strong>/or import license will be released/provided to the contractor in connectionwith this contract.28. FINANCIAL:28.1 The tenderer should produce Audited Balance Sheet <strong>and</strong> Income statement <strong>of</strong> just concluded year.28.2 The tenderer shall furnish such documents as to establish the financial soundness <strong>of</strong> his company as wellas that <strong>of</strong> other companies if more than one company is involved in bidding for this tender. The latestbalance sheet, audited or certified by a neutral agency shall be furnished.28.3 The bidder shall submit required information in a separate Annexure <strong>and</strong> also a certificate from the userfor whom the project was executed about the correctness <strong>of</strong> the date’s involved <strong>and</strong> satisfactoryperformance <strong>of</strong> the equipment/system.29. TECHNOLOGY & EQUIPMENT:29.1 The technology <strong>of</strong> the Train Protection Warning System (TPWS) <strong>of</strong>fered by the tenderer shall be <strong>of</strong>proven type, properly validated by international organization <strong>of</strong> repute, comprising <strong>of</strong> State <strong>of</strong> the arttechnology capable <strong>of</strong> having facility for future upgradability <strong>and</strong> migration facility to higher level <strong>of</strong>technology. The system shall, already in operation on open air surface railway network provided withoverhead electrification for traction <strong>and</strong> shall conform to the technical specification <strong>of</strong> the system givenin the tender.29.2 The tenderer shall clearly identify the sources form which the equipment to be supplied under thistender will be obtained. Specific attention is drawn to para 16 <strong>of</strong> Special Conditions <strong>of</strong> Contract.29.3 All equipment proposed to be used shall be <strong>of</strong> proven design <strong>and</strong> performance. Certificate from theactual user <strong>of</strong> the equipment about satisfactory performance shall be enclosed with the tender. Anyequipment proposed to be manufactured with foreign collaborator shall be covered by the performanceguarantee <strong>of</strong> the foreign collaborator.30. SOFTWARE:30.1 S<strong>of</strong>tware version <strong>of</strong> the equipment being supplied should be latest <strong>and</strong> must be indicated.30


30.2 All the s<strong>of</strong>tware updates, data <strong>and</strong> specification up‐grades which may result from development effectedby him or his collaborator, will be implemented free <strong>of</strong> cost by the successful tenderer, at each site or foreach equipment during the currency <strong>of</strong> the contract including the period <strong>of</strong> AMC. Acceptance <strong>Testing</strong> <strong>of</strong>the system will be got done by him through authority designated by Railways for all functions <strong>of</strong> alsystems after the implementation <strong>of</strong> the maintenance S<strong>of</strong>tware Upgrades / Patches in each system.31. ENGINEERING ORGANISATION:31.1 The tenderer shall make an assessment <strong>of</strong> the requirement <strong>of</strong> personnel for execution <strong>of</strong> this project <strong>and</strong>shall give details as to how he proposes to mobilize al technical manpower required for the project.Details <strong>of</strong> the qualification <strong>and</strong> experience <strong>of</strong> the personnel indentified for project execution shall beincluded in the tender.31.2 The successful tenderer shall appoint a Project Manager who would have adequate experience inproject management <strong>of</strong> similar nature, unless the railway so desire, the Project Manager shouldpreferably be retained till all the obligations under the contract have been fulfilled.31.3 The tenderers shall have at least 2(Two) graduate Engineer <strong>and</strong> 4(Four) experienced supervisors(Diploma Holders) having 5/6 years experience in the relevant field, supported by at least 10(Ten) Nos. <strong>of</strong>artisan staff like Signal Mechanics, wiremen, cable jointers etc.31.4 Tenderer shall advise the number <strong>of</strong> Engineers. Supervisors <strong>and</strong> Cable Jointers/Artisans employed byhim or going to be employed by him with their names, qualifications bio‐data <strong>and</strong> experience in thisparticular trade under consideration along with the Tender positively. Irrevocable letters <strong>of</strong>commitment <strong>of</strong> the said Supervisors <strong>and</strong> Key Technicians/Artisans for doing the work shall be furnishedalong with Tender Papers <strong>of</strong> they are not already in employment <strong>of</strong> the Tenderer.32. CONSTRUCTION MACHINERY:The firm should have minimum construction machinery, Tools <strong>and</strong> plants test & measuring instruments,Vehicles etc. Details <strong>of</strong> which will be furnished by them along with the bid. No tools <strong>and</strong> plants,scaffolding materials for shuttering, entering, shoring etc. shall be supplied by the Railway <strong>and</strong>contractor will have to make his own arrangement for execution <strong>of</strong> the work.*****31


Section – IIChapter – 2SPECIAL CONDITIONS OF CONTRACT32


Section – IIChapter – 2SPECIAL CONDITIONS OF CONTRACTINDEX1. TENDER DOCUMENTS2. AGREEMENT3. SECURITY DEPOSIT & PERFORMANCE GUARANTEE4. CONTRACTOR'S OFFICE & STORES DEPOT5. USE OF RAILWAY LAND Not applicable6. PROGRAMME OF WORK7. COMPETENT SUPERVISORS8. SPECIFIED RAILWASY STORES9. OTHER RAILWAY STORES10. TEST & MEASURING INSTRUMENTS, SPECIAL TOOLS AND INSTALLATION MATERIAL11. STORES TO BE SUPPLIED BY CONTRACTOR12. SUPPLY OF TECHNICAL LITERATURE, DOCUMENTATION, DRAWINGS & COMPLETION PLANS ETC.13. SPARES14. LING TERM AVAILABILITY OF SPARES AND SYSTEM SUPPORT15. QUALITY ASSURANCE16. EQUIPMENT EVALUATION AND APPROVAL17. INSPECTION OF MATERIALS18. INSECTION OF WORKS19. QUANTUM OF WORK AND VARIATION IN QUANTITIES20. RIGHT OF RAILWAY TO KEEP BACK FROM THE CONTRACT ANY PORTION OF WORK21. SUBLETTING AND ASSIGNMENT22. EXECUTION OF WORK23. PROGRESS REPORTING24. MAINTENANCE OF WORKS25. CLEARANCE OF SITE33


26. PROVISIONAL ACCEPTANCE27. PLACING IN SERVICE & MAINTEANCE SUPERVISION28. FINAL ACCEPTANCE29. WARRANTY30. TRAINING31. INFRINGEMENT OF PATENTS:32. LICENSE AS PER GOVT. OF INDIA CONTRACT LABOUR ACT33. DEFAULT & DELAYS34. LOSS SUSTAINED DUE TO DEFAULT AND DELAY35. PENALTY FOR DELAY IN COMPLETION36. EXTENSION OF TIME37. CONTRATOR’S LIABILITIES FOR COSTS AND DEMANGES:38. UNIT PRICES39. MEASUREMENT OF WORKS40. TERMS OF PAYMENT41. FINAL PAYMENT42. FINAL SETTLEMENT43. CERTIFICATE FOR MODVAT BENEFITS ON BILLS44. DEDUCTION FROM ON ACCOUNT PAYMENT BILLS45. TAXES46. MOBILIZATION ADVANCE47. INSURANCE48. FORCE MAJEURE CLAUSE49. SETTLEMENT OF DISPUTE AND ARBITRATION50. DEMAND FOR ARBITRATION.34


SPECIAL CONDITIONS OF CONTRACT1. TENDER DOCUMENTS1.1 The goods <strong>and</strong> services required, bidding procedure <strong>and</strong> contract terms are prescribed in the tenderdocuments. Bid documents can be obtained from the <strong>of</strong>fice <strong>of</strong> the Chief Administrative Officer / IRPMU,(IRCOT complex) Shivaji Bridge, New Delhi‐110001, after depositing 10000/‐ or 10500/‐ only (ifrequired by post) in the form <strong>of</strong> bank draft made in favour <strong>of</strong> FA&CAO, IRPMU, Shivaji Bridge, New Delhi‐110001 on any working day as mentioned in tender notice or corrigendum there<strong>of</strong>. The attention <strong>of</strong>tenderer is invited to the following documents. The attention <strong>of</strong> tenderer is invited to the followingdocumentsSection‐ISection‐IISection‐ III:Preamble along with Schedule <strong>of</strong> Requirement.I) Instructions to tenderers <strong>and</strong> conditions <strong>of</strong> tendering.II) Special Conditions <strong>of</strong> Contract.III) Tender Forms <strong>and</strong> Annexure etc.Technical Supplement along with technical Instructions, specifications <strong>and</strong> Drawings etc.for the scope <strong>of</strong> the work included in this tender.MiscellaneousI) General Conditions <strong>of</strong> contract (G.C.C.) as amended by advance correction slips issued up to date.II) IRS conditions <strong>of</strong> contract for the stores department with up to date modification (CCSS).General Conditions <strong>of</strong> Contract (G.C.C.) as amended by advance correction slips issued up to‐date <strong>and</strong> IRSconditions <strong>of</strong> contract for the stores department with up to date modification (CCSS) can be obtained, if needbe, from the <strong>of</strong>fice <strong>of</strong> the CAO/IRPMU after paying the cost prescribed for it in the form <strong>of</strong> Bank Draft infavour <strong>of</strong> FA&CAO/IRPMU, Shivaji Bridge, New Delhi.1.2 If the Tender submitted by a tenderer is accepted <strong>and</strong> the contract awarded to the Tenderer, the variousworks coming under purview <strong>of</strong> the contract shall be governed by tender documents mentioned above.Where there is any conflict between the instructions to tenderers <strong>and</strong> conditions <strong>of</strong> tendering <strong>and</strong> specialconditions <strong>of</strong> contract, Tender forms, annexure etc. on one h<strong>and</strong> <strong>and</strong> General Conditions <strong>of</strong> Contract on theother, the former shall prevail.1.3 Any Special conditions stated by the Tenderer in the covering letter submitted along with the tender shall bedeemed to be a part <strong>of</strong> the Contract to such extent only, as have been explicitly accepted by the Railway.1.4 The expression General conditions <strong>of</strong> contract (GCC), wherever occurring in these papers shall be deemedto mean the General conditions <strong>of</strong> contract, 1969 <strong>of</strong> Northern Railway department as amended by advancecorrection slips issued up‐to‐date.2. AGREEMENTThe successful Tenderer shall within 30 days after having been called upon by notice to do so be boundto execute an agreement based on accepted rates <strong>and</strong> conditions, in such form as the Railways mayprescribe, <strong>and</strong> lodge the same with the Railway together with the conditions <strong>of</strong> contract, specifications<strong>and</strong> Schedule <strong>of</strong> prices referred to therein duly completed. The Form for agreement is included in Section II,Chapter‐III, (Form No.3).3. CONTRACT PERFORMANCE GUARANTEE AND SECURITY DEPOSITOn receipts <strong>of</strong> the Letter <strong>of</strong> Acceptance <strong>of</strong> tender from the Railway the successful tenderer shall within aperiod <strong>of</strong> 30 days deposit with the Financial Advisor <strong>and</strong> Chief Accounts Officer, IRPMU, Shivaji Bridge NewDelhi‐110001, an amount as mentioned below towards Payment <strong>of</strong> Security Deposit for the fulfillment <strong>of</strong> thecontract.35


3.1 SECURITY DEPOSIT3.1.1 Security Deposit/rate <strong>of</strong> recovery/mode <strong>of</strong> recovery shall be as under:-i. Security Deposit for each work shall be 5% <strong>of</strong> the contract value.ii. The rate <strong>of</strong> recovery shall be at the rate <strong>of</strong> 10% <strong>of</strong> the bill amount till the full security deposit is recovered.iii. Security Deposits will be recovered only from the running bills <strong>of</strong> the contract <strong>and</strong> no other mode <strong>of</strong> collectingSD such as SD in the form <strong>of</strong> instruments like BG, FD etc shall be accepted towards Security Deposit.iv. No interest will be payable upon the Earnest Money <strong>and</strong> Security Deposit or amounts payable to the Contractorunder the Contract.3.1.2 The Earnest Money deposited by the Contractor with his tender may at the discretion <strong>of</strong> the successfulTenderer be adjusted towards payment <strong>of</strong> this Security Deposit for the due <strong>and</strong> faithful fulfillment <strong>of</strong> thecontract by the contractor. The balance to make up the Security deposit, may be deposited by the Contractor incash or may be recovered by percentage deduction from the Contractor’s “on account” bills. Provided also that incase <strong>of</strong> defaulting contractor the Railway may retain any amount due for payment to the Contractor on thepending “on account bills” so that the amounts so retained may not exceed 10% <strong>of</strong> the total value <strong>of</strong> the contract.3.1.3 The Railway shall be entitled to deduct from the said Security Deposit any loss / damage which the Railways maybe put to by reasons <strong>of</strong> any act <strong>of</strong> default on the part <strong>of</strong> contractor <strong>and</strong> may call upon the contractor to replenish<strong>and</strong> maintain the deposit at its original limit by making further deposit. In the event <strong>of</strong> the contractor failing todeposit within time <strong>and</strong> in the manner aforesaid the Railway shall be entitled to cancel the contract <strong>and</strong> forfeit thesecurity deposit.3.1.4 Security Deposit in Cash will bear no interest. If the successful Tenderer so desires, he may withdraw hisEarnest Money deposit <strong>of</strong> made Cash (as earnest Money) after furnishing a deposit <strong>of</strong> equal amount in any<strong>of</strong> the above forms.3.1.5 FORFEITURE OF DEPOSITThe Security Deposit referred to above shall be forfeited to the Railway in the event <strong>of</strong> any breach on the part <strong>of</strong>the contractor <strong>of</strong> the terms <strong>of</strong> this contract without prejudice to the Railway’s right to rescind the contract <strong>and</strong>other rights <strong>and</strong> remedies warranted by law.3.1.6 REFUND OF SECURITY DEPOSITSecurity deposit, unless forfeited in whole or in Part, according to the terms <strong>and</strong> conditions, however, shall bereleased only after physical completion <strong>of</strong> the work, warranty period is over, the expiry <strong>of</strong> maintenance period, ifany, <strong>and</strong> after passing the final bill based on NO CLAIM certificate after settlement <strong>of</strong> all dues <strong>and</strong> disputes. Thecertificate inter alia should mention that the work has been completed in all respect <strong>and</strong> that all the contractualobligations have been fulfilled by the contractor <strong>and</strong> that there is no due from the contractor to Railways againstthe contract concerned.3.2 PERFORMANCE GUARANTEE (P.G.):The procedure for obtaining Performance Guarantee is outlined below:3.2.1 The successful bidder shall have to submit a Performance Guarantee (PG) within 30 (thirty) days from thedate <strong>of</strong> issue <strong>of</strong> Letter Of Acceptance (LOA). Extension <strong>of</strong> time for submission <strong>of</strong> PG beyond 30 (thirty) days<strong>and</strong> upto 60 days from the date <strong>of</strong> issue <strong>of</strong> LOA may be given by the Authority who is competent to signthe contract agreement. However, a penal interest <strong>of</strong> 15% per annum shall be charged for the delay beyond 30(thirty) days, i.e. from 31st day after the date <strong>of</strong> issue <strong>of</strong> LOA. In case the contractor fails to submit therequisite PG even after 60 days from the date <strong>of</strong> issue <strong>of</strong> LOA, the contract shall be terminated dulyforfeiting EMD <strong>and</strong> other dues, if any payable against that contract. The failed contractor shall be debarredfrom participating in re-tender for that work.3.2.2 The successful bidder shall submit the Performance Guarantee (PG) in any <strong>of</strong> the following forms,amounting to 5% <strong>of</strong> the contract value:‐i. A deposit <strong>of</strong> Cash.ii. Irrevocable Bank Guaranteeiii. Government securities including State Loan Bonds at 5% below the market value.36


iv. Deposit Receipts, Pay Orders, Dem<strong>and</strong> Drafts & Guarantee Bonds. These forms <strong>of</strong> performanceguarantee should be either <strong>of</strong> State Bank <strong>of</strong> India or any <strong>of</strong> the Nationalized Banksv. Guarantee Bonds executed or Deposits Receipts tendered by all Scheduled Banksvi. A deposit in the Post Office Saving Bank.vii. A deposit in the National Savings Certificates.viii. Twelve Year National Defence Certificates.ix. Ten Year Defence Depositsx. National Defence Bonds <strong>and</strong>xi. Unit Trust Certificates at 5% below the market value or at the face value whichever in lessAlso FDR in favour <strong>of</strong> FA & CAO (free from any encumbrance) may be accepted.NOTE: The instruments as listed above will also be acceptable for Guarantees in case <strong>of</strong> Mobilization Advance.3.2.3 The Performance Guarantee shall be submitted by the successful bidder after the Letter Of Acceptance (LOA) hasbeen issued, but before signing <strong>of</strong> the contract agreement. This P.G. shall be initially valid upto the stipulated date<strong>of</strong> completion plus 60 days beyond that. In case, the time for completion <strong>of</strong> work gets extended, the contractorshall get the validity <strong>of</strong> P.G. extended to cover such extended time for completion <strong>of</strong> work plus 60 days.3.2.4 The value <strong>of</strong> PG to be submitted by the contractor will not change for variation upto 25% (either increase ordecrease). In case during the course <strong>of</strong> execution, value <strong>of</strong> the contract increases by more than 25% <strong>of</strong> theoriginal contract value, an additional Performance Guarantee amounting to 5% (five percent) for the excessvalue over the original contract value shall be deposited by the contractor."3.2.5 The Performance Guarantee (PG) shall be released after physical completion <strong>of</strong> the work based on 'CompletionCertificate' issued by the competent authority stating that the contractor has completed the work in allrespects satisfactorily. The Security Deposit shall, however, be released only after expiry <strong>of</strong> the maintenanceperiod <strong>and</strong> after passing the final bill based on 'No Claim Certificate' from the contractor.3.2.6 Whenever the contract is rescinded, the Security Deposit shall be forfeited <strong>and</strong> the Performance Guaranteeshall be enchased. The balance work shall be got done independently without risk & cost <strong>of</strong> the failedcontractor. The failed contractor shall be debarred from participating in the tender for executing thebalance work. If the failed contractor is a JV or a Partnership firm, then every member/partner <strong>of</strong> such afirm shall be debarred from participating in the tender for the balance work in his/her individual capacity or as apartner <strong>of</strong> any other JV/partnership firm.3.2.7 The engineer shall not make a claim under the Performance Guarantee except for amounts to which thePresident <strong>of</strong> India is entitled under the contract (not withst<strong>and</strong>ing <strong>and</strong>/or without prejudice to any otherprovisions in the contract agreement) in the event <strong>of</strong>:i. Failure by the contractor to extend the validity <strong>of</strong> the Performance Guarantee as described herein above, in whichevent the Engineer may claim the full amount <strong>of</strong> the Performance Guarantee.ii. Failure by the contractor to pay President <strong>of</strong> India any amount due, either as agreed by the contractor ordetermined under any <strong>of</strong> the Clauses/Conditions <strong>of</strong> the Agreement, within 30 days <strong>of</strong> the service <strong>of</strong> noticeto this effect by Engineer.iii. The Contract being determined or rescinded under provision <strong>of</strong> the GCC, the Performance Guarantee shall beforfeited in full <strong>and</strong> shall be absolutely at the disposal <strong>of</strong> the President <strong>of</strong> India.4 CONTRACTOLR’S OFFICE & STORES DEPOT.The Contractor shall, within a month <strong>of</strong> issue <strong>of</strong> letter <strong>of</strong> acceptance <strong>of</strong> tender, establish an <strong>of</strong>fice <strong>and</strong> storedeport at a convenient place for receiving <strong>and</strong> storing equipments <strong>and</strong> materials <strong>and</strong> progre3ssing fieldwork expeditiously in consultation <strong>and</strong> with the approval <strong>of</strong> the which all correspondence should be sent.Any comunicatio0jn sent to the contractor by post at his said address shall be deemed to have reached thecontractor duly <strong>and</strong> in time. Important document shall be sent by Registered post.5 USE OF RAILWAY LAND:Use <strong>of</strong> Railway l<strong>and</strong> required by the Contractor for construction <strong>of</strong> temporary <strong>of</strong>fices, quarter(s), hutmentsetc. for the staff <strong>and</strong> for storing materials etc., will be permitted to him/them fire by Railway, if available.The location <strong>of</strong> these <strong>of</strong>fices, hutments, stores etc. will be subject to the approval <strong>of</strong> the Engineer or hisrepresentative. The l<strong>and</strong> will be restored to Railway by the Contractor(S) in the same condition as whentaken over or in vacant condit9on as desired by the Engineer, after completion <strong>of</strong> the work or at any earlier37


day, as specified by the Engineer. The failure to do so will make the Contractor(s) liable to pay the costincurred by the Railway for getting possession <strong>of</strong> l<strong>and</strong>.6. PROGRAMME OF WORK:6.1 The Contractor shall have necessary resource to execute the work so that the entire works completed withina period as mentioned in the preamble form the date <strong>of</strong> issue <strong>of</strong> Letter <strong>of</strong> acceptance <strong>of</strong> the tender. He shallalso have necessary resources to take up the work <strong>of</strong> installation commissioning etc. Simultaneously at twoindependent places.6.2 Within a period <strong>of</strong> 30 days beginning from the date <strong>of</strong> issue <strong>of</strong> Letter <strong>of</strong> acceptance <strong>of</strong> Tender, the Contractorshall the submit the detailed time Schedule for the execution <strong>of</strong> work based on the condition in consultationwith the Railway to the authority mentioned in the Preamble <strong>and</strong> approved by the latter in writing beforecommencement <strong>of</strong> the work.6.3 The Contractor shall be held responsible for the execution <strong>of</strong> the work according to the Porgramme givenabove for the execution <strong>of</strong> the work in full compliance <strong>of</strong> the approved cable route plans <strong>and</strong> also the variousclauses <strong>of</strong> the technical supplement, Technical specifications, instructions <strong>and</strong> drawings available separately.Failure to comply with any <strong>of</strong> these will be dealt with a per provision laid down in general Conditions <strong>of</strong>Contract.6.4 The Contractor on his part will have to employ supervisors, technicians <strong>and</strong> labour in full strengthcommensurate with working area available. He will also arrange matching materials <strong>and</strong> equipment tocomplete the job most expeditiously so as to ensure that the work is completed in phases within thestipulated period.6.5 Inspection Register shall be maintained at the site <strong>of</strong> work by the Railway wherein instructions regardingthe working etc shall be recorded by the engineer or his executive subordinates. It is expected <strong>of</strong> theContractor or his so <strong>and</strong> take action accordingly.6.6 No facility whatsoever, e.g. provisions <strong>of</strong> approach road an provision <strong>of</strong> temporary level crossing etc will beprovided by Railway for carting materials. Approach roads within the Railway limits can be used for cartingmaterials.6.7 The contractor will programme his work in such a manner so as not to interfere in the working <strong>and</strong>movement <strong>of</strong> trains. No extra payment shall be allowed on this account <strong>and</strong> or taking any precaution orwastage <strong>of</strong> contractor’s labour, time etc, due to train working.7. COMPETENT SUPERVISORS:7.1 The Contractor shall place <strong>and</strong> keep competent Representatives/Supervisors/Engineers, as hisrepresentative at the work sites who will be authorized to receive <strong>and</strong> acknowledge materials issued bythe Railway <strong>and</strong> take all orders issued by the Railway. The said representatives shall be present at siteduring working hours <strong>and</strong> any written orders <strong>of</strong> instructions which the purchaser’s Engineer may giveo0t the said representatives <strong>of</strong> the contractor shall be deemed to have been duly given or communicatedto the contractor.7.2 The contractor or his representative will accompany the Purchaser’s Engineer or Engineer on inspectionor proceed to their <strong>of</strong>fices whenever called upon to do so.7.3 For TPWS works, a supervisor employed by the Contractor shall be an experienced Engineer / DiplomaEngineer with signaling background with minimum 5 to 6 years experience in h<strong>and</strong>lingRailway/signaling projects. This shall include about two years experience in supervision <strong>of</strong> works forinstallation <strong>of</strong> Colour Signalling <strong>and</strong> Automatic system <strong>of</strong> running the trains.38


8. SPECIFIED RAILWAY STORES:8.1 All materials to be supplied by Railway are indicated in the preamble <strong>and</strong> shall be supplied by Railwayfree <strong>of</strong> cost at Railway Depot as mentioned in Preamble. The price in schedule <strong>of</strong> work shall be exclusive<strong>of</strong> the cost <strong>of</strong> these items.8.2 The contractor shall furnish a st<strong>and</strong>ing indemnity bond for the materials <strong>and</strong> equipments supplied tohim by Railway in form No. 6. (Chapter 3, Section II).8.3 The quantity required would be determined by the Railway according to the quantum <strong>of</strong> work to bedone. The Contractor shall be responsible for checking before taking delivery that all the materialsgiven to him are in good condition. The receipt <strong>of</strong> materials shall be acknowledged by the Contractor orhis representative, mentioning details <strong>of</strong> materials <strong>and</strong> their quantities on a prescribed pro‐forma inForm No. 10 enclosed. The left out/unused materials if any shall be returned to Railway Depot (asmentioned in Rate Schedule) by the Contractor for which no extra charges shall be paid by Railway.8.4 The Contractor shall transport material supplied by Railway to the site <strong>of</strong> work as required <strong>and</strong> nocarting charges shall be payable by Railways.8.5 RECONCILIATION OF MATERIALS SUPPLIED BY RAILWAYS:All the materials supplied by the Purchaser shall be correctly accounted for <strong>and</strong> the quantitiesreconciled on completion <strong>of</strong> the work by the contractor. One completion <strong>of</strong> the work al surplusmaterials supplied by the purchaser together with the ones found defective or that have becamedefective or broken on account <strong>of</strong> defective materials <strong>and</strong>/or workmanship shall be returned to him bythe contractor.If the contractor fails to return excess <strong>and</strong> unused materials supplied by the railway or if there are anyshortages during final reconciliation their cost there <strong>of</strong> shall be recovered by the Purchaser form theContractor at the books rate plus railway freight, h<strong>and</strong>ling, loading, supervision <strong>and</strong> other incidentalcharges at the rates fixed by the railway. To this will be added an increase <strong>of</strong> 100%.8.6 CONSIGNEE:The contractor should consign, if need be, all the materials to ‘self’ to the nearest stations where materialcan be booked for stacking before erection. For such items, as admit part payment on receipt by theRailway, can be booked to store godown <strong>of</strong> Sr Section Engineer/Signal/NCR, MTJ/AGC/TDL, where formthe materials shall be h<strong>and</strong>ed over to the contractor for installation. However transportation charges tothe site <strong>of</strong> work, taxes, octroi/ Entry tax etc <strong>and</strong> all h<strong>and</strong>ling charges for each such times shall be borneby the contractor.8.7 PACKING AND FORWARDINGThe contractor shall pack at his own cost the stores sufficiently <strong>and</strong> properly for transit by rail/road, air<strong>and</strong> / or sea as provided in the contract so as to ensure their being free form loss or damage on arrival attheir destination.All containers (including packing cases, boxes, tins, drums <strong>and</strong> wrappings) in which the stores aresupplied by the contractor4 shall be considered as non‐returnable <strong>and</strong> their cost as deemed to haveincluded in the contract price. Each bale or package shall contain note specifying the name <strong>and</strong> address<strong>of</strong> the Contractor the number <strong>and</strong> date <strong>of</strong> the acceptance <strong>of</strong> tender <strong>and</strong> the designation <strong>of</strong> the Controlling<strong>of</strong>ficer.Each bale or package delivered under the contract shall be marked by the Contractor at his ownexpense. Such marking shall be distinct (all previous irrelevant making being carefully obliterated) <strong>and</strong>shall clearly indicate the description <strong>and</strong> quantity <strong>of</strong> the stores, the name <strong>and</strong> address <strong>of</strong> the consignee,the gross weight <strong>of</strong> the package <strong>and</strong> the name <strong>of</strong> the contractor with a distinctive number <strong>of</strong> marksufficient for the purpose <strong>of</strong> identification. All markings shall be carried out with such material as maybe found satisfactory by the inspecting <strong>of</strong>ficer as regard quickness <strong>of</strong> drying fastness <strong>and</strong> indelibility.39


Materials <strong>and</strong> Equipment meant for each station shall be packed in separate boxes <strong>and</strong> marked with thename <strong>of</strong> station, consignee <strong>and</strong> railway.The inspecting <strong>of</strong>ficer may reject the stores <strong>of</strong> the stores are not packed <strong>and</strong> /or marked as aforesaid<strong>and</strong> in case where the packing materials are separately prescribed, if such materials are not inaccordance with the terms <strong>of</strong> the contract. Such rejection <strong>of</strong> the stores by the Inspecting Officer shall bebinding on the Contractor.8.8 CONSIGNEE’S RIGHT OF REJECTION:Notwithst<strong>and</strong>ing any approval which the Inspecting <strong>of</strong>ficer may have give4n in respect <strong>of</strong> any materialsor other particulars or the work or workmanship involved in the performance <strong>of</strong> the contract (whetherwith or without any test carried out by the Contractor or the inspecting <strong>of</strong>ficer or under the direction <strong>of</strong>the Inspecting <strong>of</strong>ficer) <strong>and</strong> notwithst<strong>and</strong>ing delivery <strong>of</strong> the materials where so provided to the interimconsignee, it shall be lawful for the consignee, on behalf <strong>of</strong> the Railway, to reject the material or any part,portion or consignment there<strong>of</strong> within a reasonable time after actual deliver there<strong>of</strong> to him at the placeor destination specified in the contract is such materials or part portion or consignment there<strong>of</strong> is notin all respects in conformity with the terms <strong>and</strong> conditions <strong>of</strong> the contract whether on account <strong>of</strong> anyloss, deterioration or damage before dispatch or delivery or during transit or otherwise howsoever.8.9 SECURITY OF MATERIALS:­Security <strong>of</strong> all materials in the section where the work is progress shall be the contractor’s responsibility<strong>and</strong> he shall arrange to guard the same form theft. In the event <strong>of</strong> any loss the contractor shall beresponsible to that effect <strong>and</strong> shall execute an indemnity bond for the materials that will remain in hiscustody, which has been supplied by the Railway.9. OTHER RAILWAY STORES:9.1 If any material other than those specified in para 8 above is supplied by the Railway either at theContractor’s request or suo‐motto in order to prevent any possible delay in the execution <strong>of</strong> the workslikely to occur due to the Contractor’s inability to make adequate arrangements for supply there<strong>of</strong> orotherwise, recovery will be made from Contractor’s bill at 1.5 times the cost pr procurement which isinclusive <strong>of</strong> freight or rate given in schedule whichever is higher. Freight between the Railway sources<strong>of</strong> supply <strong>and</strong> Railway Stores/depot shall be to the Contractor’s account.9.2 If however, the material required by the Contractor is not available in Railway stock or the Railwaysdecided not to supply the same be that for whatever reasons the Railway will not be bound to arrangefor the supply at the cost quoted above or at any cost nor will this fact be accepted as an excuse for delayin execution <strong>of</strong> works.10. TEST & MEASURING INSTRUMENTS, SPECIAL TOOLS AND INSTALATION MATERIAL10.1 Special tools <strong>and</strong> instruments required for installation <strong>and</strong> maintenance <strong>of</strong> all the equipment shall bearranged by the tenderer in adequate quantities. All installation material for complete commission <strong>of</strong>the e system shall be provided by the tenderer. Details <strong>of</strong> special tools their quantities <strong>and</strong> unit pricesshall be indicated.10.1.1 All tests <strong>and</strong> measuring instruments <strong>and</strong> other arrangements required for all the acceptance tests shallbe provided by the contractor free <strong>of</strong> cast.11 STORES OT BE SUPPLIED BY CONTRACTOR:11.1.1 All materials required for the execution <strong>of</strong> the contract other than those specifically shown as beingsupplied by the Railways in this document shall be arranged <strong>and</strong> supplied by the contractor as detailedin the scope so as to realize the end objective. The materials supplied <strong>and</strong> used by the contractor shallbe <strong>of</strong> best quality available.40


11.2 The approximate quantities <strong>of</strong> equipment <strong>and</strong> material to be supplied by contractor are indicated inTender Schedule <strong>of</strong> preamble. The supply <strong>of</strong> equipment <strong>and</strong> materials shall also include requiredinstallation <strong>and</strong> other materials <strong>and</strong> document etc., which may not be specifically mentioned herein, butwhich are usually necessary for completing the work in all respects. The materials supplied <strong>and</strong> used bythe contractor shall be <strong>of</strong> best quality available.12 SUPPLY FOR TECHNICAL LITERATURES, DOCUMENTATION, DRAWINGS & COMPLETION PLANS ETC.12.1.1 The supply <strong>of</strong> equipment <strong>and</strong> materials shall include supply to two sets <strong>of</strong> printed documents from theoriginal equipment manufacturers with each equipment. The documents should include:‐(i) All s<strong>of</strong>tware documentation required for the equipment/system design.(ii) <strong>Design</strong> approach <strong>of</strong> the system.Functions achieved in hardware <strong>and</strong> s<strong>of</strong>tware.Mode <strong>of</strong> interaction between hardware <strong>and</strong> s<strong>of</strong>twareSpecification <strong>of</strong> the interface adopted for communication between the tack side balise <strong>and</strong> vehicleantenna, track side balise <strong>and</strong> signal aspect.Salient features through which fail safety has been achieved e.g. use <strong>of</strong> a watch dog timer, automatic shutdown etc.Pro<strong>of</strong> <strong>of</strong> safety in the form <strong>of</strong> process adopted for safety analysis <strong>and</strong> result there<strong>of</strong>.(iii) The following certifications from the approved validation agency (independent safetyCorrectness <strong>and</strong> safety <strong>of</strong> the s<strong>of</strong>twareExpected MTBF <strong>and</strong> availability <strong>of</strong> the systemauditor).(iv) Name <strong>of</strong> manufacturer, place <strong>of</strong> manufacture <strong>and</strong> inspection. A list <strong>of</strong> spare parts as recommended bythe manufacturer shall be enclosed.(v) A list <strong>of</strong> Test equipment <strong>and</strong> other special tools as required for date input, simulation testing,installation <strong>and</strong> maintenance etc. <strong>of</strong> the system <strong>and</strong> a detailed write‐up about the procedure to beadopted for use <strong>of</strong> the same.(vi) Quality assurance & s<strong>of</strong>tware validation.The tenderer shall submit along with the tender the quality assurance control, <strong>and</strong> inspection planincluding full details <strong>of</strong> in‐house quality assurance organization, procedure <strong>and</strong> documentation. Thetenderer shall submit along with this tender the details <strong>of</strong> s<strong>of</strong>tware validation done by an AccreditedAgency <strong>of</strong> International repute <strong>and</strong> st<strong>and</strong>ard. Further, all the details <strong>of</strong> test, certification <strong>and</strong> validationdone to ensure full safety <strong>of</strong> the system for use at station for operation <strong>of</strong> passenger train services, as perthe Technical Specification, shall be submitted by the tenderer12.2 Except where printed documents are supplied with each equipment by original equipment tmanufacturer, all other documentation <strong>and</strong> information shall be prepared using CAD. All thedocumentation <strong>and</strong> drawing etc. shall be supplied in two sets <strong>of</strong> CD’s. The drawing etc. shall also besupplied in duplicate on J.K. Copier/map litho white paper to facilitate taking out copes on plain papercopier. In addition, four complete sets <strong>of</strong> such documents shall also be supplied for ready sue dulybounded in good plastic folders.12.3 The supply <strong>of</strong> equipment <strong>and</strong> material shall also include necessary documentation related to training onthe maintenance <strong>of</strong> equipment in sufficient number <strong>of</strong> copies, <strong>and</strong> two video‐cassettes.12.4 <strong>Supply</strong>, installation, testing & <strong>Commissioning</strong> <strong>of</strong> TPWS equipment <strong>and</strong> associated equipment etc. shallinclude supply <strong>of</strong> :‐(i)Four sets <strong>of</strong> equipment layout, wiring & circuit, details.(ii) Test & Measurement results <strong>of</strong> TPWS equipment parameter vis‐à‐vis st<strong>and</strong>ard/nominal values.(iii) Any other detail which Railways feel necessary during/after completion <strong>of</strong> the work.41


13. SPARES:13.1 The Tenderer shall include in his tender the details <strong>of</strong> essential spares, their quantity <strong>and</strong> unit prices asper schedule <strong>of</strong> requirements. Details are to be given in confirm that quantity <strong>of</strong> spares quoted are asper requirement <strong>of</strong> this clause. The tenderer shall give a detailed list <strong>of</strong> circuit packs, modules, panels,plug in units, crystals, couplers, connectors, fuses <strong>of</strong> each type which may be lowest level fieldreplaceable units for each location. The total cost <strong>of</strong> essential spares based on the unit price quoted bythe tenderer shall not be included in the tender evaluation.13.2 Railway shall consider the following essential spares at 5% <strong>of</strong> the quantities used in the equipmentsubject to a minimum <strong>of</strong> one. The fraction shall be rounded <strong>of</strong>f on higher side.a) All units which may include but not limited to circuit packs, modules, plug in units, ancillary equipmentconnectors, couplers <strong>of</strong> each type, which may be lowest level filed replaceable assembly/device.b) Surge <strong>and</strong> lightning protection arrangement.c) Power supply equipment.d) Connectors <strong>and</strong> couplers <strong>of</strong> each type with cables, crystals, MCBs switches. In addition following are tobe supplied as spares:i) S<strong>of</strong>tware back up in two sets <strong>of</strong> CD’s.ii)Three times the quantity <strong>of</strong> fuses used in the equipment for each type.13.3 Optional Spares:In addition to the essential spares, tenderer shall indicate additional recommended quantities <strong>of</strong> sparesfor efficient maintenance <strong>of</strong> the equipment t <strong>and</strong> the systems which is considered necessary by thetenderer.14. LONG TERM AVAILABILITY OF SPARES AND SYSTEM SUPPORT:14.1 The tenderer shall undertake to supply on payment all maintenance spares <strong>and</strong> tools required for theequipment during life time. He shall also undertake to supply additional equipment required forreplacement or expansion <strong>of</strong> the network that may become necessary due to additional trafficrequirements. The priced variation formula adopted in pricing such maintenance spares <strong>and</strong> additionalsupply that may be ordered in future shall be provided by mutual discussions.14.2 The manufacturer shall guarantee that spare parts for the system shall be available for a minimum <strong>of</strong>eight years after expiry <strong>of</strong> the warranty period <strong>and</strong> thereafter at least two years notice shall be given tothe Railway before <strong>and</strong> equipment or components are discontinued or phased out from themanufacturing plans. This will enable the Railway to assess <strong>of</strong> the life time requirement <strong>of</strong> sparesneeded <strong>and</strong> order in sufficient quantity prior to stoppage <strong>of</strong> the manufacture.14.3 The successful tenderer shall further guarantee that <strong>of</strong> the goes out <strong>of</strong> production <strong>of</strong> spare parts he shallsupply the specifications <strong>of</strong> materials at no cost to the purchaser, if <strong>and</strong> when required in connectionwith the equipment to enable the purchaser to fabricate or procure from other sources.14.4 The supplier shall recommend <strong>and</strong> provide, prior to the system acceptance, calibration procedures. Therecommendation shall include a list <strong>of</strong> the various calibration instruments, recalibration periods <strong>and</strong>extent <strong>of</strong> preventive maintenance for each test instrument.15. QUALITY ASSURANCE:15.1 The tenderer shall submit along with the tender the quality control plan including full details <strong>of</strong> in‐housequality assurance organization, procedures <strong>and</strong> documentation. During the manufacturing process,proper record shall be maintained for the inspection <strong>and</strong> test carried out according to this plan.42


15.2 In the event <strong>of</strong> Railways waiving <strong>of</strong>f the inspection, all test provided in the test schedulesapproved by Railway shall be carried out b y the quality assurance organization <strong>and</strong> proper recor5ed <strong>of</strong>all such tests <strong>and</strong> results there<strong>of</strong> shall be maintained <strong>and</strong> supplied to Railways on dem<strong>and</strong>.16. EQUIPMENT EVALUATION AND APPROVAL:16.1 The equipment shall be supplied by the contractor after the prototype is approved by the inspectingagency.(i) Prototype testing <strong>and</strong> approval is not required for those equipment:‐(a ) Which have already been type approved by Research, <strong>Design</strong> & St<strong>and</strong>ards organization (RDSO),Lucknow.(b)Which have already been successfully tested by An Independent Reputed International organization <strong>and</strong>which would be accepted by RDSO based on Cross acceptance. For cross acceptance <strong>of</strong> the equipment byRDSO, the tenderer shall supply all the necessary documents required by the RDSO in the regard.16.2 The procedure proposed to be adopted for the prototype approval <strong>of</strong> the equipment shall be as under:‐(i)(ii)(iii)(iv)(v)(vi)(vii)(viii)The test procedure shall be based on the system design. The methodologies to be adopted for varioustests shall be decided taking into account the system design/configuration <strong>and</strong> shall be approved by IR.Manufacturer shall carry out acceptance tests on equipment to be installed for functional acceptancetest. Two sets <strong>of</strong> trackside /line equipment to be installed in an experimental section <strong>of</strong> the Railway willbe <strong>of</strong>fered for the proto type testing. These will be subject to routine test as laid down in Para 8 <strong>of</strong> thetechnical specifications <strong>of</strong> the tender Document. These will be shipped to the consignee only after theinspecting <strong>of</strong>ficial issues a clear <strong>and</strong> unequivocal inspection certificate.Functional Acceptance Tests: The Proto‐type tested set <strong>of</strong> two trackside /line side equipment will beinstalled in one block section <strong>of</strong> the Railway where detailed trial shall be conducted for functionalacceptance Test. The functional acceptance tests shall sequence through all required operation to provethat the system performs in accordance with the specification <strong>and</strong> that the local configuration data isacceptable.After completion <strong>of</strong> the survey <strong>and</strong> functional acceptance test, clearance will be given by the Railway tothe Contractor for undertaking manufacture <strong>of</strong> the total quantity <strong>of</strong> on board <strong>and</strong> line side equipment tobe supplied under this tender.Routine Test: The manufacture shall carryout the routine tests as per Para 9.2 (A) <strong>of</strong> the technicalspecifications <strong>of</strong> the tender document <strong>of</strong> each equipment <strong>and</strong> the test results shall be submitted to theinspection authority before calling him for the acceptance tests.Acceptance Test: The inspecting <strong>of</strong>ficial shall undertake the acceptance test on all the equipments as perPara No. 9.2 (B) <strong>of</strong> the technical specification <strong>of</strong> tender document at the manufacturer’s premises. Thematerial will be shipped only after an issue <strong>of</strong> ‘Inspection Certificate’ by the inspecting <strong>of</strong>ficial.The Inspecting Officer shall be nominated by the CAO/IRPMU. Notice /Intimation shall be sent inwriting at least One month in advance by the contractor to the Inspecting <strong>of</strong>ficer when the stores ormaterial to be supplied are ready for inspection <strong>and</strong> test <strong>and</strong> no materials shall be delivered ordispatched until the Inspecting Officer has certified in writing that such stores have been inspected <strong>and</strong>approved for dispatch.Test Procedure: The contractor shall submit detailed Test Procedure for each equipment, sub‐system<strong>and</strong> system as a whole to the Railway. The railway shall discuss with the contractor <strong>and</strong> modify thesame as may be required to ensure that the requirements <strong>of</strong> Tender Specification are complied. Thefinalized Acceptance Test Procedure/Schedule shall, only, act as broad guideline <strong>and</strong> Railway shall befree to carry our any other test that may considered essential. The Test Procedure shall give details <strong>of</strong> allequipment, test <strong>and</strong> measuring instruments required to perform the test.43


(ix)(x)Facilities for Test <strong>and</strong> Examination: The contractor shall, at his own cost afford to the inspecting <strong>of</strong>ficerall reasonable facilities including Office/Lab accommodation as may be necessary for satisfying himself,that materials are being <strong>and</strong> /or have been manufactured in accordance with the Specification <strong>and</strong>conditions laid down. Contractor shall provide the facilities <strong>of</strong> inspection <strong>and</strong> testing at the final stage <strong>of</strong>production, assembly <strong>and</strong> testing in the manufacturer’s /supplier’s premises.Cost <strong>of</strong> Test: The Contractor shall provide, at his cost, all materials, tools, labour <strong>and</strong> assistance <strong>of</strong> everykind, which the Inspecting <strong>of</strong>ficer may dem<strong>and</strong> <strong>of</strong> him for any test <strong>and</strong> examination, which he shallrequire to be made on the Contractor’s premises. If the Contractor fails to meet with the conditionsaforesaid, the inspecting <strong>of</strong>ficer shall, in his sole judgment, be entitled to remove for test <strong>and</strong>examination, all or any <strong>of</strong> the stores manufactured by the Contractor to any premises other than that <strong>of</strong>the Contractor, <strong>and</strong> in all such cases the Contractor shall bear the cost <strong>of</strong> transport <strong>and</strong>/or carrying outsuch test elsewhere. A certificate in writing by the Inspecting <strong>of</strong>ficer that the Contractor has failed toprovide the facilities <strong>and</strong> the means for test examination shall be final. The contractor shall not beentitled to object on <strong>and</strong> ground whatsoever to the method <strong>of</strong> testing adopted by the Inspecting <strong>of</strong>ficer.(xi) Delivery <strong>of</strong> Materials for Test: The Contractor shall also provide <strong>and</strong> deliver for test, at his cost, at suchplace other than his premises <strong>and</strong> the Inspecting <strong>of</strong>ficer may specify such material or stores, he mayrequire. The premises for testing other than manufacturer’s premises shall be mutually decided byRailway <strong>and</strong> the Contractor.17. INSPECTION OF MATERIALS:17.1 All equipment, materials, fittings <strong>and</strong> components will be subject to inspection by the purchaser or hisrepresentative at the manufacturer’s premises before dispatch <strong>and</strong> no materials shall be dispatchedfrom the manufacturer’s premises until these are inspected <strong>and</strong>/or approved. The materials may also beinspected by the purchaser or his representative at the contractor’s depot at the purchaser’s discretion.The purchaser or his representative shall have the right to be present during all stages <strong>of</strong> manufacture,<strong>and</strong> shall be afforded, free <strong>of</strong> charge al reasonable facilities for inspection <strong>and</strong> testing so as to satisfyhimself that the materials are in accordance with specifications, approved drawing <strong>and</strong> designs.17.2 Materials to IRS/RDSO design or specification <strong>and</strong> ITD/TEC specification shall be inspected by RDSObefore they are finally used in works. Materials other than this should be inspected by purchaserEngineer or his representative at factory/site.17.3 All Materials that are not covered under the specification, designs <strong>and</strong> drawings <strong>of</strong> RDSO/TEC etc. shallbe procured from the reputed manufacturers or their authorized dealers. Such materials are to beapproved by the purchaser’s Engineer. The Contractor may be required to produce test certificate fromthe manufacturer whatever called for by the Engineer.17.4 During the execution <strong>of</strong> the contract, samples may be taken from all the materials employed for thepurpose <strong>of</strong> test <strong>and</strong>/or analysis under the conditions laid down in specification, such samples to beprepared for testing <strong>and</strong> forwarded to the testing entity shall be free <strong>of</strong> all costs to the Railway.17.5 The decision <strong>of</strong> the purchaser or his successor shall be final in respect <strong>of</strong> acceptability or otherwise <strong>of</strong>any material, equipment etc. required for the work.17.6 The cost <strong>of</strong> inspection <strong>of</strong> equipment <strong>and</strong> materials, all test <strong>and</strong>/ or analysis performed shall be borne bythe Contractor.17.7 All expenses <strong>of</strong> the purchasers representative shall be borne by the purchaser whether the inspectedmaterials is utilized in the work or not.17.8 In case any material be found not according to the st<strong>and</strong>ard specifications after delivery at site, thecontractor shall immediately remove such materials with 48 hours from Railway premises at his owncost.44


18. INSPECTION OF WORKS:18.1 The Engineer or his representative may inspect <strong>and</strong> test the various portions <strong>of</strong> the work at all stages<strong>and</strong> shall have full power to reject all or any portion <strong>of</strong> the work that the may consider to be defective orinferior in quality <strong>of</strong> materials workmanship <strong>of</strong> design in comparison to what is called for in thespecification. In the event <strong>of</strong> rejection <strong>of</strong> any work already executed <strong>and</strong> not in accordance withspecification as in this tender <strong>and</strong>/or as determined by the Engineer or which the Contractor has beenapprised, the Contractor shall carry out alterations/replacements to such works to the satisfaction <strong>of</strong> theEngineer for which no additional expenses will be Born by the Railway.18.2 The Contractor shall submit detailed test procedure for each equipment, sub‐system <strong>and</strong> system as awhole to the Railways. The Railways shall discuss with the contractor <strong>and</strong> modify the test procedure asmay be required to ensure that the requirements <strong>of</strong> tender specifications are complied. The finalizedtest procedure shall, only, act as a broad guideline <strong>and</strong> Railway shall be free to carry out any other teststhat may be considered essential. These test procedure shall give details <strong>of</strong> all equipment, test <strong>and</strong>measuring instruments required to perform the tests which shall be provided by the contractor free <strong>of</strong>cost.18.3 Before the cables are actually laid contractor’s representative <strong>and</strong> the Engineer’s representative shalljointly inspect the quality <strong>and</strong> depth <strong>of</strong> trenches, chases, quality <strong>of</strong> bricks <strong>and</strong> arrangements for tampedfilling. The measurement <strong>of</strong> length for all these items will be suitable recorded by the Engineer’srepresentative who will permit the laying <strong>of</strong> cables after issuing the certificates in Form No. 9 enclosedthat the above works have been done as required by the Specifications.19. QUANTUM OF WORK AND VARIATION IN QUANTITIES:19.1 The quantities <strong>of</strong> various items given in the schedules for the works to be executed are only approximate<strong>and</strong> are only for the guidance <strong>of</strong> the contractor. As far as possible, they have been assessed correctly butare likely to vary during the execution <strong>of</strong> the work.19.2 Individual NS items in contracts shall be operated with variation <strong>of</strong> plus or minus 25% <strong>and</strong> paymentwould be made as per the agreement rate. For this, no finance concurrence would be required.19.3 In case an increase in quantity <strong>of</strong> an individual item by more than 25% <strong>of</strong> the agreement quantity isconsidered unavoidable, the same shall be got executed by floating a fresh tender. If floating a freshtender for operating that item is considered not practicable, quantity <strong>of</strong> that item may be operatedin excess <strong>of</strong> 125% <strong>of</strong> the agreement quantity subject to the following conditions:a. Operation <strong>of</strong> an item by more than 125% <strong>of</strong> the agreement quantity needs the approval <strong>of</strong> an<strong>of</strong>ficer <strong>of</strong> the rank not less than S.A. Grade:i. Quantities operated in excess <strong>of</strong> 125% but upto 140% <strong>of</strong> the agreement quantity <strong>of</strong> theconcerned item, shall be paid at 98% <strong>of</strong> the rate awarded for that item in that particular tender;ii. Quantities operated in excess <strong>of</strong> 140% but upto 150% <strong>of</strong> the agreement quantity <strong>of</strong> theconcerned item shall be paid at 96% <strong>of</strong> the rate awarded for that item in that particular tender;iii. Variation in quantities <strong>of</strong> individual items beyond 150% will be prohibited <strong>and</strong> would bepermitted only in exceptional unavoidable circumstances with the concurrence <strong>of</strong> associatefinance <strong>and</strong> shall be paid at 96% <strong>of</strong> the rate awarded for that item in that particular tender.b. The variation in quantities as per the above formula will apply only to the Individual items <strong>of</strong> thecontract <strong>and</strong> not on the overall contract value.c. Execution <strong>of</strong> quantities beyond 150% <strong>of</strong> the overall agreemental value should not be permitted <strong>and</strong>,if found necessary, should be only through fresh tenders or by negotiating with existing contractor,with prior personal concurrence <strong>of</strong> FA & CAO/ FA & CAO(C) <strong>and</strong> approval <strong>of</strong> General Manager.19.4 In cases where decrease is involved during execution <strong>of</strong> contract:a. The contract signing authority can decrease the items upto 25% <strong>of</strong> individual item without financeconcurrence.45


. For decrease beyond 25% for individual items or 25% <strong>of</strong> contract agreement value, the approval<strong>of</strong> an <strong>of</strong>ficer not less than rank <strong>of</strong> S.A. Grade may be taken, after obtaining 'No Claim Certificate'from the contractor <strong>and</strong> with finance concurrence, giving detailed reasons for each such decrease in thequantities.c. It should be certified that the work proposed to be reduced will not be required in the same work.19.5 The limit for varying quantities for minor value items shall be l00% (as against 25% prescribed forother items). A minor value item for this purpose is defined as an item whose original agreementvalue is less than 1% <strong>of</strong> the total original agreement value.19.6 No such quantity variation limit shall apply for foundation items.19.7 As far as SOR items are concerned, the limit <strong>of</strong> 25% would apply to the value <strong>of</strong> SOR schedule as a whole<strong>and</strong> not on individual SOR items. However, in case <strong>of</strong> NS items, the limit <strong>of</strong> 25% would apply onthe individual items irrespective <strong>of</strong> the manner <strong>of</strong> quoting the rate (single percentage rate orindividual item rate).19.8 For the tenders accepted at Zonal Railways level, variations in the quantities will be approved by theauthority in whose powers revised value <strong>of</strong> the agreement lies.19.9 For tenders accepted by General Manager, variations upto 125% <strong>of</strong> the original agreement valuemay be accepted by General Manager.19.10 For tenders accepted by Board Members <strong>and</strong> Railway Ministers, variations upto 110% <strong>of</strong> theoriginal agreement value may be accepted by General Manager.19.11 The aspect <strong>of</strong> vitiation <strong>of</strong> tender with respect to variation in quantities should be checked <strong>and</strong> avoided.In case <strong>of</strong> vitiation <strong>of</strong> the tender (both for increase as well as decrease <strong>of</strong> value <strong>of</strong> contractagreement), sanction <strong>of</strong> the competent authority as per single tender should be obtained.20 RIGHT OF RAILWAY TO KEEP BACK FORM THE CONTRACT ANY PORTION OF WORK:The successful tenderer will however, have no claim or right in the execution <strong>of</strong> work which in theopinion <strong>of</strong> the <strong>of</strong> the Engineer should be carried out departmentally or otherwise <strong>and</strong> the RailwayReserves the right any time after the acceptance <strong>of</strong> the tender to keep back from the contract <strong>and</strong> carryout the work or any portion <strong>of</strong> work through any other agent it may think without assigning any reason.No claim for compensation/loss or whatsoever on this account will be entertained by the Railway.21. SUBLETTING AND ASSIGNMENT:21.1 The contractor may sublet a part <strong>of</strong> the work under this contract <strong>and</strong> enter into contract with suppliersfor supply <strong>of</strong> materials only with the approval <strong>of</strong> the Railway administration.21.2 The names <strong>of</strong> all sub contractors proposed to be employed for execution <strong>of</strong> work or any part there<strong>of</strong>including manufacturing <strong>of</strong> equipment <strong>and</strong> other materials shall be submitted by the contractor to thepurchaser <strong>and</strong> got approved by him before the contractor enter into a agreement with the subcontractor for the purpose.21.3 The contractor shall arrange for effective supervision <strong>of</strong> sub contractor’s work <strong>and</strong> remain solelyresponsible for materials supplied <strong>and</strong> for works carried out on his behalf by the sub‐contractor.21.4 The contractor shall not, save with the previous consent in writing <strong>of</strong> the Purchaser, sublet, transfer orassign the contract or an y part there<strong>of</strong> or interest therein or benefit or advantage there<strong>of</strong> any mannerwhatsoever.21.5 In the event <strong>of</strong> the Contractor’s subletting or assigning this contract or any part there<strong>of</strong> without suchpermission, the purchaser shall be entitled to cancel the contr4act <strong>and</strong> to purchase the stores elsewhereon the contractor’s account <strong>and</strong> risk <strong>and</strong> the contractor shall be liable for any loss or damage which thepurchaser may suction in consequence or arising out <strong>of</strong> such purpose.46


22.1 EXECUTION OF WORK:All the work shall be executed in strict conformity to the provisions <strong>of</strong> the contract document <strong>and</strong>according to detailed drawings, specifications <strong>and</strong> instructions as may be approved from time to time byRailway based on detailed design <strong>and</strong> engineering carried out the by contractor in line withrequirements as per contract document. The contractor shall be responsible for ensuring than the workthroughout are executed in the most substantial, proper <strong>and</strong> workman like manner with the quality <strong>of</strong>material <strong>and</strong> workmanship in strict accordance with the specifications <strong>and</strong> as per sound industrialpractices <strong>and</strong> to the entire satisfaction <strong>of</strong> the Railway. In case <strong>of</strong> any doubts regarding any particulars <strong>of</strong>construction <strong>and</strong> any ambiguities in the plans, the decision <strong>of</strong> the purchaser’s engineer shall be final <strong>and</strong>binding on the contractor.22.2 SAFETY OF WORK, TRAINS & PERSONNEL:­(i)(ii)The contractor should abide by all the Railway regulations <strong>and</strong> also ensure that the same are followedby his representatives, agents, servants or workmen. He is therefore bound under these clauses to givenotice to them about the provision <strong>of</strong> this clause <strong>and</strong> the consequent liability <strong>of</strong> the contractor under theagreement. The contractor shall conform to all the Railway Rules relating to safety <strong>of</strong> personnel <strong>and</strong>operation <strong>of</strong> signals <strong>and</strong> points. In the A.C. electrified areas the special precautions as laid down in R.E.Manual shall be followed:No petroleum spirit within the meaning <strong>of</strong> the Indian Petroleum Act shall be stored at site or adjacentl<strong>and</strong> until the approval <strong>of</strong> the Railway <strong>and</strong> necessary license under the Act has been obtained by thecontractor.(iii) The contractor’s employees <strong>and</strong> workers shall not for any reason operate any appliances orinstallations <strong>of</strong> the Railway concerning the safety <strong>of</strong> train movements, but they should whenevernecessary notify the qualified Railway staff who will then take necessary steps. The contractor shallalso be responsible for any damage that may cause due to the carelessness <strong>of</strong> his workmen <strong>and</strong> will bearthe consequences in this regard.(iv)(v)The work must be carried out most carefully in such a way that they do not hinder the Railwayoperation except as agreed to by the Railway. The Contractor shall do not work that may interfere withtraffic until protection has been provided by the Railway <strong>and</strong> under supervision <strong>of</strong> Railway’srepresentative. When the work is required to be carried out on the tack itself or as close to the track asmay pose a hazard to rail traffic, the work shall be carried out under the supervision <strong>of</strong> an authorizedRailway representative Junior Engineer/Senior Engineer/ Senior Section Engineer (JE/SE/SSE).Whenever track side work are undertaken by the contractors, areas for unloading <strong>of</strong> bulk materialsshould be clearly demarcated <strong>and</strong> barricades provided if necessary with the consent <strong>of</strong> the JuniorEngineer /Senior Engineer (JE/SE) Signal/Telecom, in‐charge <strong>of</strong> the work. Suitable steps shall also betaken to prevent transport vehicles <strong>and</strong> such other machinery gaining access so near the tack as tothreaten the safety <strong>of</strong> running liens the maximum moving dimensions for the said lines shall beadequately protected by fencing or such other suitable measures. No vehicle will normally be permittedto ply adjacent to the running lines. NO vehicle will normally be permitted to ply adjacent to the runninglines. The contractor will be responsible for the safety <strong>of</strong> hired trucks <strong>and</strong> men etc working at the site.He will also be responsible for any damage caused to the Railway property, staff <strong>and</strong> passengerstravelling on the line on account <strong>of</strong> his truck/vehicles having been allowed to ply on the bank.The contractor shall take all precautionary measures in order to ensure protection <strong>of</strong> his own personnelmoving about or working on the Railway premises <strong>and</strong> shall have to conform to the Rules <strong>and</strong>Regulations <strong>of</strong> the Railway. If <strong>and</strong> when, while the work under the contract is in progress, there is likelyto be any danger to the person employed by the contractor due to running <strong>of</strong> traffic or while working onthe Railway premises, the contractor shall apply in writing to the Railway to provide flagmen or lookoutmen for protection. The Railway will, however, decide as to whether it is necessary to post such flagmen<strong>and</strong> lookout men for various types <strong>of</strong> works <strong>and</strong> also the number <strong>of</strong> such men required to protect thecontractor’s staff working at site. The flagmen <strong>and</strong> lookout men will be Railway Servants <strong>and</strong> noexpenses on this account will be unforeseen accident or injury happens, the contractor will be solelyresponsible for the same.47


(vi)(vii)(viii)(ix)Suitable ladders for climbing the post <strong>and</strong> slings for supporting men on the post shall be used. Ropes asrequired shall be used for erection <strong>of</strong> the poles. The size <strong>of</strong> the rope shall be adequate. The contractorshall take necessary precaution for working near the power lines. If at any time the Railway finds thesafety arrangements are inadequate or insufficient, the contractor shall take immediate corrective actionas directed by the Railway’s representative at site. However, it is not obligatory on the part <strong>of</strong> theRailway’s to give such directions. The issue or non‐issue <strong>of</strong> any direction in the matter by the Railwayshall in no way absolve the contractor <strong>of</strong> his sole responsibility to adopt safe working methods. Thestone‐breakers, if employed shall be provided with protective goggles <strong>and</strong> protective clothing <strong>and</strong>seated at sufficiently sage intervals. Necessary personal safety equipment as considered adequate bythe Engineer‐in –Charge should be kept available by the contractor for the use <strong>of</strong> the persons employedon the site <strong>and</strong> maintained in condition suitable for immediate use <strong>and</strong> the contractor should takeadequate steps, to ensure proper use <strong>of</strong> equipment by these concerned. When not in use, electricalapparatus shall be switched <strong>of</strong>f. No pint containing lead or lead products shall be used except in theform <strong>of</strong> paste or ready mixed paints. Suitable face masks should be supplied by the contractor for use bythe workers when paint is applied in the form <strong>of</strong> spray.Within the station premises <strong>and</strong> specially on passenger platforms, the contractor shall ensure sufficientfree space for movement <strong>of</strong> passenger traffic. He must cover <strong>and</strong> protect the excavations carried out insuch areas with a view to avoid any accidents.In case <strong>of</strong> an accident <strong>of</strong> any nature, the contractor will indemnify the Railway for any losses caused byhim as a result <strong>of</strong> the accident.The contractor will not be entitled to any compensation for any damage or loss sustained by him duringexecution <strong>of</strong> the work, for any idle labour our transport or any loss or deterioration <strong>of</strong> the material ortools22.3 SUPERVISION & LABOUR:­(i)(ii)(iii)During the execution <strong>of</strong> the works the contractor or his representative shall not leave the site wherethe works are being carried out. At the site <strong>of</strong> work, the contractor shall always make available onerepresentative who shall be approved by the Railway Administration <strong>and</strong> who shall be invested withadequate powers by the Contractor so that orders or instruction given to the said representative bythe Railway Administration in writing could be considered as duly given or conveyed to theContractor himself. Representative <strong>of</strong> the Railway will check up the work from time to time.Supervision <strong>and</strong> Erection <strong>of</strong> indoor work will be done by the contractors with their own labour, tillcompletion <strong>and</strong> testing <strong>of</strong> the work.The field supervisor shall receive instructions, in the absence <strong>of</strong> the contractor from the Engineerin‐charge<strong>of</strong> the work or his representative at site <strong>and</strong> comply with the instructions. The contractorshall be responsible for the compliance <strong>of</strong> such instructions.If the supervisor acting on behalf <strong>of</strong> the contractor disobeys or does not regard the instructions <strong>of</strong>the Railway’s supervisor/representative <strong>and</strong> does not execute the work to the satisfaction <strong>of</strong> thisRailway supervisor, it shall be binding on the contractor to replace his supervisor.23. PROGRESS REPORTING:23.1 The contractor shall submit to Railways at his own cost periodic progress reports at regular intervalsregarding the state <strong>and</strong> progress <strong>of</strong> work. The details <strong>and</strong> pro‐forma <strong>of</strong> the report will mutually beagreed after award <strong>of</strong> the Contract. Such reports shall be for daily man power, equipment <strong>and</strong> plantdevelopment, weekly work progress <strong>and</strong> monthly progress review reports. All actions as directed byRailway pursuant to such reports shall be promptly attended to by Contractor.23.2 The purchaser’s engineer shall also conduct monthly meetings with the contractor to assess <strong>and</strong> reviewthe programme <strong>of</strong> works. The action proposed to progress the work as planned, difficulties, assistancerequired etc. shall be clearly brought out <strong>and</strong> remedial action taken. The minutes <strong>of</strong> these meetings shallbe jointly signed by Railway <strong>and</strong> contractor.48


24. MAINTENANCE OF WORKS:24.1 The contractor shall at all times during the progress <strong>and</strong> continuance <strong>of</strong> the works <strong>and</strong> also for theperiod <strong>of</strong> maintenance specified in the tender form <strong>and</strong> after the date <strong>of</strong> passing <strong>of</strong> the certificate <strong>of</strong>completion by the Railway’s representative or any other earlier date subsequent to the completion <strong>of</strong>the works that may be fixed by Railway’s representative be responsible for <strong>and</strong> effectively maintain <strong>and</strong>uphold in good, substantial, sound <strong>and</strong> perfect condition all <strong>and</strong> every part <strong>of</strong> the works <strong>and</strong> shall makegood from time to time <strong>and</strong> at all times, as <strong>of</strong>ten as the Railway’s representative shall require, anydamage or defect that may during the above period arise in or be discovered or be in any way connectedwith the works, provided that such damage or defect is not directly caused by errors in the contractdocuments, act <strong>of</strong> providence or instruction or instruction or civil riot, <strong>and</strong> the contractor shall beliable for <strong>and</strong> shall pay <strong>and</strong> make good to the Railways or other person legally entitled thereto wheneverrequired by the Railway’s representative so to do, all losses, damages, costs <strong>and</strong> expenses they or any <strong>of</strong>them may incur or be put or be liable to, by reason or in consequence <strong>of</strong> the operations <strong>of</strong> thecontractor or his failure in any respect.24.2 ANNUAL MAINTENANCE CONTRACT24.2.1 Annual maintenance <strong>of</strong> the system is not covered in this tender.25. CLERANCE OF SITE:25.1 Contractor at his own expenses clean the site, set out al works <strong>and</strong> provide all necessary labours, pets,string, steel to enable the purchaser or any <strong>of</strong> his representatives to check al setting out <strong>and</strong> thecontractor will correct all errors at his own expenses.25.2 At the end <strong>of</strong> the work in each section the contractor shall as a part <strong>of</strong> his contractual obligation leavethe area completely cleared <strong>of</strong> rubbish <strong>and</strong> obstruction <strong>of</strong> al kinds according to the instructions <strong>of</strong> theRailway’s representatives. Besides, he shall take execution <strong>of</strong> work to avoid the presence <strong>of</strong> loose earth<strong>and</strong> ballast on platforms, in drains, on the track formation <strong>and</strong> pathways, in the vicinity. If withinfortnight <strong>of</strong> completion <strong>of</strong> t he particular item <strong>of</strong> site work, the refuge is not cleared, the Railway, willarrange to get them removed at the cost <strong>of</strong> the contractor. However, before the Railway actually gets thesite cleared, intimation in writing shall be sent to the Contractor.26. PROVISIONAL ACCEPTANCE:26.1 Immediately after completion <strong>of</strong> the work at each station or after completion <strong>of</strong> work in a block sectionherein after referred as sub‐section, the contractor shall certify <strong>and</strong> advise the purchaser in writing thatthe installation is (i) complete, (ii) ready for satisfactory service <strong>and</strong> (iii) ready to be h<strong>and</strong>ed over. Hewill also place at the disposal <strong>of</strong> the purchaser the required staff for inspection, testing <strong>and</strong> putting itinto operation.26.2 The test or tests specified in Technical specification will be conducted jointly by the purchaser <strong>and</strong>contractor as soon as possible after receipt <strong>of</strong> advice <strong>of</strong> completion <strong>of</strong> one sub –section by the purchaserfrom the contractor. The test schedule shall be furnished by the tenderer which will be modified bymutual discussion between the contractor <strong>and</strong> Railway before finalization. Any component, modules,sub‐assemblies or equipment failing during the commissioning test shall be replaced/repaired free <strong>of</strong>cost by tenderer.26.3 Purchaser’s Engineer shall issue a Provisional Acceptance certificate for successful commissioning <strong>of</strong>whole system covering all materials <strong>and</strong> services included in the Schedule <strong>of</strong> works, after the finalacceptance test as per the approved test procedure have been completed <strong>and</strong> the performance has beenfound to meet the specifications. Railway decision in this respect shall be final. The Provisionalacceptance certificate shall be signed by both the parties. The period <strong>of</strong> maintenance <strong>of</strong> works shallcommence from the date <strong>of</strong> such certificate.49


26.4 The Purchaser’s Engineer may issue such a certificate with respect to any part <strong>of</strong> the works before thecompletion <strong>of</strong> the whole <strong>of</strong> works or with respect to any substantial part <strong>of</strong> the works which has beenboth completed to the satisfaction <strong>of</strong> the Purchaser’s Engineer <strong>and</strong> occupied or sued by the Railway <strong>and</strong>when <strong>and</strong> such certificate is given in respect <strong>of</strong> part <strong>of</strong> the works, such part shall be considered ascompleted <strong>and</strong> the period <strong>of</strong> maintenance <strong>of</strong> such part shall commence from the date <strong>of</strong> such certificate.26.5 Should the results/s <strong>of</strong> inspection <strong>and</strong> test be not satisfactory, an extension <strong>of</strong> one month will be grantedto the contractor to make good the defects <strong>and</strong> deficiencies pointed out by the purchaser. Freshinspection <strong>and</strong> test will then be carried out after the contractor has attended to the defects <strong>and</strong>deficiencies. If these tests are also not satisfactory the purchaser may proceed at the contractor’sexpense by the means deemed expedient, to have the installation made satisfactory until they complywith the specifications, <strong>and</strong> approved drawings <strong>and</strong> designs.26.6 In such a case or in the case <strong>of</strong> delay in completing the work under this contract within the time limit thepurchaser reserves the right, if he deems it possible to use in a reasonable manner any part <strong>of</strong> theinstallation even if some installations are not completely erected. The purchaser will give to thecontractor for this purpose 7 days previous notice. The contractor shall then take at his own expense allnecessary steps to complete the work in accordance with the provision <strong>of</strong> the contract. In case itbecomes impossible to proceed with the above mentioned taking over tests or reason other than forwhich the contractor is responsible, the Provisional acceptance certificate shall be issued at or within amutually agreed reasonable period not exceeding six months after completion <strong>of</strong> installation.26.7 The issue <strong>of</strong> provisional acceptance will not be withheld for rectification or minor defects as distinctfrom rejected equipment, which may not be essential for commissioning <strong>and</strong> operation <strong>of</strong> theinstallation. In such cases, only value <strong>of</strong> the materials <strong>and</strong> cost <strong>of</strong> the rectification <strong>of</strong> the minor defectsshall be withheld from the payments on provisional acceptance until rectification is completed.27. PLACING IN SERVICE & MAINTENANCE SUPERVISION:27.1 After the equipment has been commissioned & placed in service <strong>and</strong> Provisional Acceptance certificateissued by Purchaser’s Engineer, the contractor shall be responsible for proper maintenance supervision<strong>of</strong> the equipment for a period <strong>of</strong> 12 months from the date <strong>of</strong> commissioning. For this purpose he shallprepare a maintenance plan <strong>and</strong> make available the services <strong>of</strong> qualified maintenance engineerstationed the location approved by Purchaser’s Engineer who will guide <strong>and</strong> supervise the work <strong>of</strong>Railways maintenance staff. The maintenance engineer <strong>of</strong> the tenderer will visit Master station <strong>and</strong> allthe base stations at least once in a month <strong>and</strong> attend to any fault on the systems.27.2 During this period <strong>of</strong> maintenance supervision if any lacuna is noticed in the functioning as a result <strong>of</strong>any defect in design or manufacture, the same will be rectified by the contractor free <strong>of</strong> cost. Duringsuch rectification if any faulty equipment/ modules need replacement or repair, they shall be providedby the contractor from the set <strong>of</strong> equipment or modules that the contractor should bring to the site <strong>of</strong>installation in addition to all the materials to be supplied against this contract. Use <strong>of</strong> spare modulescovered under the Schedule <strong>of</strong> materials <strong>of</strong> this tender shall not be permitted to be used duringinstallation, commissioning <strong>and</strong> maintenance supervision period without personal <strong>of</strong> Chief ProjectManager/IRPMU Spares, so issued under unusual circumstances, should be replaced by the firm withinseven days <strong>of</strong> the issue <strong>of</strong> spares.28. FINAL ACCEPTANCE:28.1 The final acceptance <strong>of</strong> the entire equipment installed in the section shall take effect from the date <strong>of</strong>expiry <strong>of</strong> the period <strong>of</strong> maintenance supervision as defined in para‐ 27 or the expiry <strong>of</strong> the last <strong>of</strong> therespective period <strong>of</strong> Maintenance Supervision <strong>of</strong> various section for which Provisional acceptanceCertificates are issued or brought into full fledged operation, provided that the contractor has compliedfully with his obligations under clause 27 in respect <strong>of</strong> each section under the contract.28.2 If on the other h<strong>and</strong> the contractor has not so complied with his obligation under para 27 in respect <strong>of</strong>any section, the purchaser may either extend the period <strong>of</strong> maintenance supervision in respect <strong>of</strong> thatsection until the necessary works are carried out by the contractor or carry out those works suo‐ motoon behalf <strong>of</strong> the contractor at the contractor’s expenses. After expiry <strong>of</strong> the period <strong>of</strong> maintenance50


supervision for each section, certificate <strong>of</strong> Final Acceptance for the section shall be issued by thepurchaser <strong>and</strong> the last <strong>of</strong> such certificate will be called the Last <strong>and</strong> Final Acceptance Certificate. Thecontract shall not be considered as completed until the issue <strong>of</strong> Final Acceptance Certificate by thepurchaser.28.3 The purchaser shall not be liable to the contractor for nay dispute arising out <strong>of</strong> or in connection withthe contract or execution <strong>of</strong> the work unless the contractor have made a claim in writing in respectthere<strong>of</strong> before the issue <strong>of</strong> Final Acceptance Certificate under this clause. The contractor shall bedebarred from disputing the correctness <strong>of</strong> the items caused by the no claim certificate or dem<strong>and</strong>ing areference to Arbitration in respect there<strong>of</strong>.28.4 Notwithst<strong>and</strong>ing the issue <strong>of</strong> Final Acceptance Certificate, the contractor <strong>and</strong> the purchaser (subjectto Sub Clause as above) shall remain liable for fulfillment <strong>of</strong> any obligation incurred under to provision<strong>of</strong> the contract prior to the issue <strong>of</strong> Final Acceptance Certificate which remains unperformed at the timesuch certificate is issued <strong>and</strong> for determining the nature <strong>and</strong> extent <strong>of</strong> such obligation, the contract, shallbe deemed to remain in force between the parties hereto.29. WARRANTY:29.1 All equipment <strong>and</strong> system supplied by the Contractor shall be guaranteed against the defects for aperiod <strong>of</strong> 12 (twelve) months from the date <strong>of</strong> commissioning <strong>of</strong> work <strong>and</strong> placing in service. The date <strong>of</strong>the commissioning <strong>of</strong> the work will be after the signing <strong>of</strong> the provisional acceptance certificate by boththe parties as per details at clause 26(26.3) above.29.2 During the period <strong>of</strong> warranty, the contractor shall remain responsible to arrange replacement <strong>and</strong> forsetting right at his own cost any equipment installed by him which is <strong>of</strong> defective manufacture or designor becomes unworkable due to any cause whatsoever. The decision <strong>of</strong> the Railway’s representative inthis regard to direct the contractor to attend to any damage or defect in work shall be final <strong>and</strong> bindingon the Contractor.29.3 During the period <strong>of</strong> warranty, the contractor shall be responsible to the extent expressed in this clausefor any defects that may develop under the conditions provided for by the contract <strong>and</strong> under properuse, arising from faulty materials, design <strong>of</strong> workmanship in the plant, or from faulty execution <strong>of</strong> theplant by the contractor but not otherwise <strong>and</strong> shall remedy such defects at his own cost when calledupon to do so by the Purchaser who shall state in writing in what respect the portion is faulty.29.4 If it becomes necessary for the contractor the replace or renew any defective portions <strong>of</strong> the systemunder this clause the provisions <strong>of</strong> this clause shall apply to the portions <strong>of</strong> the plant to be replaced orrenewed until the expiration <strong>of</strong> six months from the date <strong>of</strong> such replacement or renewal or until theend <strong>of</strong> the warranty period whichever may be later. If any defect is not remedied within reasonable timethe purchaser may proceed to do the work at contractor’s risk <strong>and</strong> expense, but without prejudice to anyother rights which the purchaser may have against the contractor in respect <strong>of</strong> such defects.29.5 If the replacement or renewal are <strong>of</strong> such a character as may affect the efficiency <strong>of</strong> the system thepurchaser shall have the right to give to the contractor within one month from such replacement orrenewal notice in writing for the tests to be carried out. The cost <strong>of</strong> all such tests shall be born by thecontractor.29.6 All inspections, adjustments, replacements or renewals carried out b y the contractor during thesupervised maintenance period shall be governed by the special conditions <strong>of</strong> this contractor.29.7 Until the final certificate shall have been issued, the contractor shall have the right <strong>of</strong> entry, at his ownrisk <strong>and</strong> expense, by himself or his duly authorized representatives, whose names shall have previouslybeen communicated in writing to the pu8rchaser at all reasonable working hours upon all necessaryparts <strong>of</strong> the works for the purpose <strong>of</strong> inspecting the working <strong>and</strong> the records <strong>of</strong> the system <strong>and</strong> takingnotes there from <strong>and</strong>, if he desires at his own risk <strong>and</strong> expense, making <strong>and</strong> tests subject to the approval<strong>of</strong> the purchaser which shall not be unreasonably withheld.51


30. TRAINING:30.1 The tenderer shall undertake to train Railway engineers <strong>and</strong> the staff nominated by the Railways indifferent aspects <strong>of</strong> equipments functioning, field installation, testing, commissioning, operation,maintenance <strong>and</strong> repair, covering both hardware <strong>and</strong> s<strong>of</strong>tware. The training should be comprehensivefor transfer <strong>of</strong> complete know‐how so as to impart full knowledge <strong>and</strong> competent to independently <strong>and</strong>successfully execute the installation, operation, maintenance <strong>and</strong> repair <strong>of</strong> all equipment. The trainingshould include h<strong>and</strong> on practical experience <strong>and</strong> visits to working installation.30.2 The contractor shall at every stage <strong>of</strong> installation, testing <strong>and</strong> commissioning shall provide all facilitiesfor adequate training <strong>of</strong> Railway personnel who may be deputed to work on the project.31. INFRINGEMENT OF PATENTS:(a)(b)The Contractor is forbidden to use any patens or registered drawings, proce3sses or patterns in fulfillinghis contract without the previous consent in writing <strong>of</strong> the owner <strong>of</strong> such patents drawings, patterns ortrademarks, except where these are specified by the purchaser himself. Royalties where payable for theuse <strong>of</strong> such patented processes, registered drawings or patterns shall be Born exclusively by theContractor. The Contractor shall advise the purchaser <strong>of</strong> any proprietary rights that may exist on suchprocesses, drawings or patterns which he may use <strong>of</strong> his own accord.In the case <strong>of</strong> patents taken out by the Contractor <strong>of</strong> the drawings or patterns registered by him, or <strong>of</strong>those patents, drawings or patterns for which he holds a license, the signing <strong>of</strong> the contractautomatically gives the Purchaser the right to repair by himself the purchased articles covered by thepatent or any person or body chosen by him <strong>and</strong> to obtain from any sources he desires the componentparts required by him for carrying out the repair work. In the event <strong>of</strong> infringement <strong>of</strong> any patent rightsdue to above action <strong>of</strong> the purchaser, he shall be entitled to claim damages from the contractor on thegrounds <strong>of</strong> any loss <strong>of</strong> any nature which he may suffer.32. LICENSE AS PER GOVT. OF INDIA CONTRACT LABOUR ACT:32.1 The contractors are required to produce license as enjoined in the Government <strong>of</strong> India Contract Labour(Regulation <strong>and</strong> Abolition ) Act (1978). They shall not be allowed to undertake or execute any workthrough contract labour except under an in accordance with a license issued under the said Act in thatbehalf by the authorized licensing Officer.33. DEFAULT & DELAYS:The Contractor shall execute the work with due diligence <strong>and</strong> expedition, keeping to the approved timeschedule. Should he refuse or neglect to comply with any reasonable order given to him in writing bythe Purchaser’s Engineers in connection with the work lags persistently behind the time schedule due tohis neglect, the Purchaser shall at liberty to give seven days notice in writing to the Contractorrequiring him to make good the neglect or contravention complained <strong>of</strong> <strong>and</strong> should the contractor fail tocomply with the requisitions made in the notice within seven days from the receipt there<strong>of</strong>, it shall belawful for the purchaser to take the work wholly or in part out <strong>of</strong> the Contractor’s h<strong>and</strong>s without anyfurther reference <strong>and</strong> get the work or any part there<strong>of</strong>, as the case may be, completed by other agenciesat the expense <strong>of</strong> the contractor without prejudice to any other right or remedy <strong>of</strong> the Purchaser.34. LOSS SUSTAINED DUE TO DEFAULT AND DELAY:In the event <strong>of</strong> any loss to the purchaser on account <strong>of</strong> execution <strong>and</strong>/or completion <strong>of</strong> the work or anypart there<strong>of</strong> by agencies other than the contractor, the contractor shall be liable to reimburse the loss topurchaser without prejudice to the other rights <strong>and</strong> remedies <strong>of</strong> the purchaser, <strong>and</strong> thereimbu8rsement in full or in part as the case may be, shall be met, at the option <strong>of</strong> the purchaser fromout <strong>of</strong> all or any <strong>of</strong> the following sources viz:i) Any amount due <strong>and</strong> payable to the contractor by the purchaser on any account whatsoever;52


ii) The Contractor’s security deposit in h<strong>and</strong>s <strong>of</strong> the purchaser as far as available, <strong>and</strong> any other assetswhatsoever <strong>of</strong> the contractor;In the event <strong>of</strong> re‐imbursement from out <strong>of</strong> sources(i) <strong>and</strong>/or(iii) above mentioned, the purchaser shallhave the right <strong>of</strong> appropriation suo‐moto.35. PENALTY FOR DELAY IN COMPLETION:a) If the contractor fails to execute <strong>and</strong> complete the work within the time specified in the Agreement orwithin the period <strong>of</strong> extension granted under para 36 except in so far as the delay is on the purchaser’saccount, the contractor shall be levied Liquidated Damages @ ½% per week or part there<strong>of</strong> <strong>of</strong> theentire contract value <strong>of</strong> the work awarded to the contractor for delays in supply/execution <strong>of</strong> the workas per General Condition <strong>of</strong> contract.b) For the purpose <strong>of</strong> this clause, the contract value <strong>of</strong> the works shall be taken as value <strong>of</strong> work as percontract agreement including any supplementary work order/contract agreement issued Provided also,that the total amount <strong>of</strong> liquidated damages under this condition shall not exceed the under notedpercentage value or <strong>of</strong> the total value <strong>of</strong> the item or groups <strong>of</strong> items <strong>of</strong> work for which a separate distinctcompletion period is specified in the contract.(i) For contract value up to 2 Lakhs ‐‐ 10% <strong>of</strong> the total value <strong>of</strong> the contract.(ii) For contracts valued above 2 Lakhs ‐‐ 10% for the first 2 Lakhs <strong>and</strong> the 5% <strong>of</strong> thebalance.Provided further, that if the Railway is not satisfied the the works can be completed by the contractor<strong>and</strong> in the event <strong>of</strong> failure on the part <strong>of</strong> the contractor to complete the work within further extension<strong>of</strong> time allowed as aforesaid, the Railway shall be entitled, without prejudice to any other right orremedy available in the behalf, to appropriate the contractor’s security deposit <strong>and</strong> rescind the contractunder clause 62 <strong>of</strong> these conditions, whether or not actual damage is caused by such default.36. EXTENSION OF TIME:If such a failure as aforesaid shall have arisen from any cause which the Purchaser may agree as being areasonable ground for extension <strong>of</strong> time, the Chief Project Manager/IRPMU or his successor (s) mayallow such additional time as he may in his absolute discretion consider to be reasonable justified by thecircumstances <strong>of</strong> the case, such extension shall be granted with liquidated damages in the Form No.11.The contractor will apply for extension at least two months’ before the expiry <strong>of</strong> the period <strong>of</strong>completion. Form No. 11. The Contracted will apply for extension at least two months before the expiry<strong>of</strong> the period <strong>of</strong> completion. Form No. 12 will be applicable in case extension is on purchaser’s account<strong>and</strong> also in case extension is on contractor account but the purchaser’s is reasonably satisfied thatcontractor’s cannot penalized for such delay. The terms <strong>and</strong> condition <strong>of</strong> the original contract willremain operative during the extended period <strong>and</strong> nothing will be allowed on this account.37. CONTRATOR’S LIABILITIES FOR COSTS AND DAMAGES:37.1 WITHHOLDING AND LIEN IN RESPECT FO SUMS CLAIMED:a) Whenever any claim or claims for payment <strong>of</strong> a sum <strong>of</strong> money arises out <strong>of</strong> under the contract againstthe contractor, the Purchaser shall be entitled to withhold <strong>and</strong> also have lien to retain such sum or sumsin whole or in part from the security, if any, deposited by the contractor <strong>and</strong> for the purpose aforesaidthe purchaser shall be entitled to withhold the said cash security deposit or the security, if any,furnished as the case may be <strong>and</strong> also have lien over the sum pending finalization or adjudication <strong>of</strong> anysuch claim.b) In the event <strong>of</strong> the security being insufficient to cover the claimed amount or amounts or if no securityhas been taken from the Contractor, the purchaser shall be entitled to withhold <strong>and</strong> have lien to retain tothe extent <strong>of</strong> such claim amount or amount s referred to spura, from any sum or sums found payable orwhich at any time thereafter may become payable to the Contractor under the same contract or anyother department <strong>of</strong> the Central Government pending finalization or adjudication <strong>of</strong> any such claims.53


c) It is an agreed term <strong>of</strong> the contract that sum <strong>of</strong> money or moneys so withheld or retained under the lienreferred to by the purchaser till the claim arising out <strong>of</strong> or under the contract is determined by theArbitrator. (If the contract is governed by the Arbitration clause) or by the competent court as the casemay be <strong>and</strong> that the contractor will have no claim for interest <strong>of</strong> damages whatsoever on any account inrespect <strong>of</strong> such withholding or retention under the lien referred to spura <strong>and</strong> duly noted as such to theContractor.d )For the purpose <strong>of</strong> this clause, where contr5actor is a partnership firm or a limited company, thepurchaser shall be entitled to withhold <strong>and</strong> also have a lien to retain towards such claimed amount oramounts in whole or in part from any sum found payable to any partner/limited company, as the casemay be, whether in his individual company or otherwise.37.2 LIEN IN RESPECT OF OTHER CONTRACTS:a) Any sum or sums <strong>of</strong> money due <strong>and</strong> payable to the Contractor (including the security deposit returnableto him under the contract) may be withheld or retained by way <strong>of</strong> lien by the Purchaser against anyclaim <strong>of</strong> this Railway or any other Railway or any other Departments <strong>of</strong> the central government inrespect <strong>of</strong> payment <strong>of</strong> a sum <strong>of</strong> money arising out <strong>of</strong> or under any other contract made by the Contractorwith this or any other Railway or any other department <strong>of</strong> the Central Government.b) It is an agreed term <strong>of</strong> the contract that the sum <strong>of</strong> money so withheld or retained under this clause bythe purchaser will be kept withheld or retained as such by the purchaser till the claim arising out <strong>of</strong> orunder any other contract is either mutually settled or determined by the Arbitrator if the other contractis governed by the Arbitration clause or by the competent court as the case may be, <strong>and</strong> the contractorshall have no claim for interest or damages in respect <strong>of</strong> any sum <strong>of</strong> money withheld or retained underthis clause <strong>and</strong> duly notified to the contractor.38. UNIT PRICES:38.1 The prices quoted by the Tenderer shall include the prices <strong>of</strong> materials including al incidental chargesfor transport, loading/unloading <strong>and</strong> h<strong>and</strong>ling <strong>of</strong> materials, commission for arranging dispatch byrail/road direct from manufacturer’s factory <strong>and</strong> completing all necessary formalities in this respect,such as submission <strong>of</strong> forwarding notes, arranging placement <strong>of</strong> Wagon, collection <strong>of</strong> banker’s chargesfor Bank guarantee, Indemnity Bonds inclusive <strong>of</strong> cist <strong>of</strong> Stamp etc. as also siding or shunting charges, <strong>of</strong>any, levied by the Railway.38.2 The prices shall include all taxes, duties, Royalty l<strong>and</strong> levies (including Octroi/Entry Tax/State Tax etc.)applicable on this Works Contract. Therefore, they should quote their prices taking into account therate <strong>of</strong> sales tax as leviable in the event <strong>of</strong> sale to the Central Government Organization etc.38.3 The prices quoted by the tenderer shall include cost <strong>of</strong> commissioning <strong>and</strong> testing <strong>and</strong> all costs <strong>of</strong>Administration <strong>of</strong> Contract, Insurance, Premium banker’s charges for guarantees, cost <strong>of</strong> storage,loading‐unloading <strong>and</strong> h<strong>and</strong>ling <strong>of</strong> materials <strong>and</strong> for any road transport which the contractor may use orcarriage <strong>of</strong> materials to his depot <strong>and</strong> the site <strong>of</strong> work. The prices shall include the cost <strong>of</strong> works <strong>and</strong>adjustments necessary to be done by the contractor during or after test carried out by the purchaser.38.4 The price to be quoted by the tenderer’s should take into account the credit availed on inputs under theMODVAT scheme introduced w.e.f. 1st March 1986. The tenderer should give a declaration that any let<strong>of</strong>fs in respect <strong>of</strong> duties on inputs as admissible under law is being totally <strong>and</strong> unconditionally passed onto the purchaser in the price quoted by him (see para43).38.5 While the price quoted in the contract are inclusive if al taxes i.e. custom duty, excise duty, octroi, locallevies, Sales tax levied by any statutory authority, the purchaser shall make any deduction toward salestax on works contract if statutorily required to do so. The deducted sales tax on works contacts shall beremitted to the concerned sales tax authority <strong>and</strong> the purchaser shall in no way be responsible for anydisputes between the sales tax authorities <strong>and</strong> the contractor in this regard.54


38.6 All taxes, duties <strong>and</strong> levies (Including octroi etc.) arising out <strong>of</strong> the transaction between the contractor<strong>and</strong> his sub contractor/supplier for this work will be included in the rates quoted by the contractor inthe relevant schedule.38.7 Arrangement <strong>of</strong> permits/license for materials will not be made by the Railway or any assistance given.The Contractor will have to make his own arrangement. Also no import license shall be arranged by theRailway for this work. No C/D form will be arranged/supplied by the railways.38.8 The Unit prices <strong>of</strong>fered against the various items in schedules will include beside labour the followingelements <strong>of</strong> cost:‐(i)Cost <strong>of</strong> all materials required for preparing the cable routes, laying the cables <strong>and</strong> all other incidentalsconnected therewith excluding the materials supplied by the Railways.(ii) Special tools & installation materials for TPWS equipments, racks, wiring etc. (see para 10).(iii) Cost <strong>of</strong> transportation <strong>of</strong> material, supplied by the Railway from place <strong>of</strong> delivery to the site <strong>of</strong> work.(iv) Return <strong>of</strong> released materials, left over cables <strong>and</strong> other materials from the site <strong>of</strong> work <strong>and</strong> h<strong>and</strong>ing overto the Engineer at specified locations or stores depot.(v) Cost <strong>of</strong> preparation <strong>of</strong> detailed documentation completion plans/drawings (see para 12).(vi) All other miscellaneous expenses necessary for the execution <strong>of</strong> work <strong>and</strong> fulfillment <strong>of</strong> contractualobligation.39. MEASUREMENT OF WORKS:39.1 Payments for the works shall be made in accordance with approved designs & drawings <strong>and</strong> measuredin relevant units except where provided or otherwise. The measurements will be made generally inaccordance with st<strong>and</strong>ard engineering practice & in conformity with the General condition <strong>of</strong> Contact.39.2 Figures, Dimensions <strong>and</strong> Drawing shall supersede measurement by scale <strong>and</strong> drawing to a larger scaleshall take precedence over those to smaller scale. Special dimensions for direction in the specificationshall supersede all else.39.3 MEANING AND INTERPRETATION BY RAIL WAY TO BE FINAL:All measurement, method <strong>of</strong> measurement, meaning <strong>and</strong> intent <strong>of</strong> specifications <strong>and</strong> interpretation <strong>of</strong>Special Conditions <strong>of</strong> Contract, given <strong>and</strong> made by the Purchaser or by the Purchaser’s Engineer shall befinal <strong>and</strong> binding <strong>and</strong> shall be considered “excepted matter” in terms <strong>of</strong> conditions laid down in theGeneral Conditions <strong>of</strong> Contract.40. TERMS OF PAYMENT:40.1 Payments to the contractor will be made through EFT/ECS. All bills shall be submitted to the authoritymentioned in Preamble or as nominated by CAO/IRPMU from time to time.40.2 Subject to any deduction or recovery which the Railway may be entitled to make under contract, theContractor will be entitled to be paid from time to time by way <strong>of</strong> an account payment ‘<strong>of</strong> supply <strong>of</strong> goodprogress payment’ for works as in the opinion <strong>of</strong> the Engineer he has executed in terms <strong>of</strong> Contract.40.3 ON ACCOUNT PAYMENT:“On Account Payment” will be made for supply <strong>of</strong> equipment, materials indicated in the supply scheduleon receipt <strong>of</strong> materials in good condition at the Stores <strong>of</strong> Sr. Section Engineer/Sig/NCR atMathura/Agra/New Delhi. On Account payments made will subsequently be adjusted against paymentsdue on Provisional Acceptance or Final Acceptance. 75% (Seventy five percent) <strong>of</strong> the value <strong>of</strong> eachconsignment shall be paid on production <strong>of</strong> the following documents:a) Store receipt certificate issued by Railway <strong>of</strong>ficial/Representative as per Form‐14.55


) Original Inspection certificate issued by Inspecting Officer viz. RDSO/RITES/Railway Representative orInspection Waiver Certificate issued be competent authority.c) Manufacturer’s certificate for TPWS equipments <strong>and</strong> associated equipment that he materials are inaccordance with the specifications <strong>of</strong> the contract.d) Challan /Invoice in duplicate.e) A certificate that the materials supplied are as per the contract <strong>and</strong> the amount claimed in the invoice iscorrect as per terms <strong>of</strong> the contract.(f)Current Sale Tax Clearance Certificate. (Form No.58)40.4 All on account payments shall be covered by a st<strong>and</strong>ing indemnity bond in the approved form (see formNo.6)40.5 15% (Fifteen percent) value <strong>of</strong> the good supplied shall be paid after the successful completion oninstallation & commissioning <strong>of</strong> a section.40.6 15% payment against supply <strong>of</strong> spares (Para 13 <strong>of</strong> SCC) <strong>and</strong> <strong>of</strong> goods supplied but not installed/notrequired to be installed, shall be paid after issue <strong>of</strong> Final Acceptance Certificate.40.7 90% (Ninety percent) <strong>of</strong> the installation rate quoted in rate schedule shall be paid to the contractor ason account bills only on production <strong>of</strong> certificate by the site engineer that relevant portion <strong>of</strong> installationhas been completed.41. FINAL PAYMENT.Final payment <strong>of</strong> 10% (Ten percent) <strong>of</strong> contract value shall be made after satisfactory operation <strong>and</strong>maintenance <strong>of</strong> the equipment under the supervision <strong>of</strong> the contractor for a period <strong>of</strong> one year aftercommissioning <strong>and</strong> issue <strong>of</strong> Final Acceptance Certificate. On the basis <strong>of</strong> Final Acceptance Certificatefrom the Purchaser’s Engineer for all the works in all the section covered in this contract, <strong>and</strong>reconciliation <strong>of</strong> materials issued, the final bill for the balance payment for each item <strong>of</strong> work shall besubmitted by the Contractor along with a clear ‘No Claim Certificate’. The final Acceptance Certificateshall be issued by the Purchaser’s Engineer only when he has accepted the work wholly afterconducting the acceptance tests as per the details given in the technical specification <strong>and</strong> supplement.42. FINAL SETTLEMENT:On expiry <strong>of</strong> the warranty period <strong>and</strong> issue <strong>of</strong> the certificate <strong>of</strong> final acceptance <strong>of</strong> the entireinstallations the security deposit will be refunded or bank Guarantee released to the Contractor afteradjustment <strong>of</strong> any dues payable by the contractor.43. CERTIFICATE FOR MODVAT BENEFITS ON BILLS:a) The Contractor should submit the following certificate along with the bills:‐“We certify that no additional duty set <strong>of</strong>f on the Goods supplied by us have accrued under the MODVATScheme in force on the date <strong>of</strong> supply after we submitted our quotations <strong>and</strong> submitted the presentbill.”b) In the event <strong>of</strong> MODVAT credit being extended by the Government <strong>of</strong> India to more items than thatalready covered, the firm should advise the purchaser about the additional benefits accrued through aletter containing the following certificate or any variation there<strong>of</strong> as may be considered necessary byindividual Railway administration:‐56


“We hereby declare that we can avail additional duty set <strong>of</strong>f as per latest MODVAT scheme in force now<strong>and</strong> we hereby give a reduction <strong>of</strong> (________) per unit <strong>and</strong> agree to revise the prices indicated in the order.The current E.D. <strong>of</strong> (________) is payable on this reduced price. Therefore, we request you to amend theorder accordingly.”44. DEDUCTION FROM ON ACCOUNT PAYMENT BILLS:(i)(ii)All costs, damages or expenses, which Railways may have paid or incurred, which under the provisions<strong>of</strong> contract are Contractor’s obligation will be deducted by Railways from progress paymentBills/Invoice <strong>of</strong> contractor, as <strong>and</strong> when it is understood that such an expenses has been incurred orpaid for.All such claims <strong>of</strong> Railways shall, however, by duly supported by appropriate <strong>and</strong> certified vouchers,receipts or explanations as are available to enable the contractor to identify such claims.45. TAXES:45.1 The Contractor <strong>and</strong> all personnel employed by him shall pay such taxes like Income Tax as are payableunder statutory laws <strong>of</strong> India <strong>and</strong> the Purchaser WILL NOT ACCEPT <strong>and</strong> liability for the same.45.2 Deduction <strong>of</strong> Income Tax at source as per provisions <strong>of</strong> Finance Act <strong>and</strong> Income Tax Act in force shall bemade from the contractor/Sub‐Contractor <strong>and</strong> the amount so deducted may be credited to the CentralGovernment.45.3 Wherever the law makes it statutory for the Purchaser to deduct any amount towards Sales Tax onWorks Contract, the same will be deducted <strong>and</strong> remitted to the concerned authority.46. MOBILIZATION ADVANCE:(a)If required by the Contractor, mobilization advance limited to 10% <strong>of</strong> contract value shall be payable onsubmission <strong>of</strong> irrevocable Bank Guarantee from a Nationalized Bank in India or the State Bank <strong>of</strong> Indiain a form acceptable to the Railway (Form No.8). This advance shall be payable in two stages as under:‐Stage: 1.5% <strong>of</strong> the contract value on signing the contact.2. 5% <strong>of</strong> the contract value on mobilization <strong>of</strong> establishment etc., i.e. setting up <strong>of</strong> project <strong>of</strong>fice<strong>and</strong> commencement <strong>of</strong> the Works.Interest:‐ The mobilization advance shall carry on interest at the rate <strong>of</strong> 18% per annum <strong>and</strong>recovery <strong>of</strong> the mobilization advance along with its interest shall be made from ‘On account <strong>and</strong>progress bills including design payment <strong>and</strong> advance payments for the work on pro‐data basis. Theinterest will be charged on balance outst<strong>and</strong>ing on the first day <strong>of</strong> each month.The recovery <strong>of</strong> the advance shall be commencing when the work to a extent <strong>of</strong> 15% <strong>of</strong> the provisionalvalue <strong>of</strong> the contract is completed. The recovery <strong>of</strong> principal <strong>and</strong> interest shall be made at the rate <strong>of</strong>15% <strong>of</strong> on account <strong>and</strong>/or progress payment such that the entire amount is recovered before totalpayment reach 85% <strong>of</strong> the value <strong>of</strong> the contract.(b)In case principal <strong>and</strong> interest could not be deducted progressively from progress/on account billsduring the course <strong>of</strong> the year, the interest in mobilization advance as accrued in the end <strong>of</strong> an year willbe recovered within the first 30 days <strong>of</strong> the next year from the progress/ on account bills or any otherbills which may be made by the Railway to the Contractor. If, for the reason whatever, progress/onaccount bill or any other amount is paid to the Contractor, he will still pay to the Railways the accruedinterest in full within the said 30 days <strong>of</strong> the next year. Otherwise , the unpaid interest will be added onto the Principal <strong>and</strong> interest for the next year will be charged on the balance comprising Principal as wellas unpaid interest.57


(c) In case <strong>of</strong> extension <strong>of</strong> the date <strong>of</strong> completion due to any reason whatsoever the interest on themobilization advance outst<strong>and</strong>ing would continue to accrue as specified earlier <strong>and</strong> the contractor/firmwould make the payment against the advance in the same manner as specified in Para (b) above.(d ) No advance/extra payment other than sated above shall by payable against the works.(e) The Tenderers shall specifically indicate in their <strong>of</strong>fer whether mobilization advance is required bythem. In case no specific dem<strong>and</strong> has been made in the <strong>of</strong>fer, grant <strong>of</strong> mobilization advance will not beconsidered subsequently.(f)No mobilization advance would be considered for Contract with a value less than Rs.1 (one) crore.47. INSURANCE:47.1 The Contractor shall take out <strong>and</strong> keep in force a policy or policies <strong>of</strong> insurance against all liabilities <strong>of</strong>the Contractor or the Purchaser at common law or under any statute in respect <strong>of</strong> accidents to personswho shall be employed by the contractor in or about the site for the purpose <strong>of</strong> carrying out the works inthe site. The Contractor shall also take out <strong>and</strong> keep in force a policy or policies <strong>of</strong> Insurance against allrecognized risks to their <strong>of</strong>fices <strong>and</strong> depots. Such insurance shall in all respects be to the approval <strong>of</strong> thePurchaser <strong>and</strong> if he so requires in his name.47.2 INSURANCE OF MATERIALS & INSTALATIONS:The Contractor shall take out <strong>and</strong> keep in force a policy or policies <strong>of</strong> Insurance for all materialsincluding Railway supply materials equipment irrespective <strong>of</strong> whether used up in the portion <strong>of</strong> workalready done or kept for the use in the balance portion <strong>of</strong> the work until such works are provisionallyh<strong>and</strong>ed over to the Railway. For this purpose the works are deemed to have been provisionally h<strong>and</strong>edover when Provisional acceptance certificate is issued for the Sub‐section as per para <strong>of</strong> SCC.47.3 The Contractor shall not be liable for losses/damages to the materials either used up in the portion <strong>of</strong>work done or his material kept for use at site, in consequence <strong>of</strong> mutiny, or other similar causes overwhich the Contractor has no control <strong>and</strong> which cannot be insured. Such losses or damages shall be theliability <strong>of</strong> the Purchaser <strong>and</strong> if required by the Purchaser, be made good by the contractor, at the cost <strong>of</strong>the Purchaser.47.4 The Contractor should, however, insure the stores brought to site, against risks in consequence <strong>of</strong> war<strong>and</strong> invasion, as required under the Emergency Risk (Goods) Insurance Act in force from time to time.47.5 It may be noted that the beneficiary <strong>of</strong> the insurance policy should be Railways or the policies should bepledged in favour <strong>of</strong> Railway. The contractor shall keep the policy/policies current till the installationsare provisionally h<strong>and</strong>ed over to the Purchaser. It may also be noted that in the event <strong>of</strong> contractor’sfailure to keep the policy current <strong>and</strong> alive, renewal <strong>of</strong> the policy will be done by the purchaser forwhich the cost <strong>of</strong> the premium plus 20% <strong>of</strong> premium shall be recovered from the contractor.47.6 For purpose <strong>of</strong> enabling the contractor to take the insurance cover in connection with this contract,the purchaser’s engineer will advise the approximate price <strong>of</strong> all the Railway s upply materials to thecontractor.47.8 The Contractor shall take out all Insurance covers in connection with this contract with GeneralInsurance Corporation <strong>of</strong> India only.58


48. FORCE MAJEURE CLAUSE:If at any time, during the continuance <strong>of</strong> this contract, the performance, in whole or part, by either party,<strong>of</strong> any obligation under this contract shall prevented or delayed by reason <strong>of</strong> any war, hostility, act <strong>of</strong> thepublic enemy, Civil Commotion, Sabotage, Fires, Floods, Earth quakes, explosions, strikes, epidemics,quarantine, restriction lockouts, any statute, statutory rules, regulations, order <strong>of</strong> requisitions issued byany government department or Competent Authority or acts <strong>of</strong> God (here‐in after referred to as event)then provided notice <strong>of</strong> the happening <strong>of</strong> any such, event is given by either party to the other withintwenty on days from the date <strong>of</strong> occurrence there<strong>of</strong> neither party shall by reason <strong>of</strong> such event beentitled to terminate this Contract nor shall either party have any claim for damage against the other inrespect <strong>of</strong> such non‐performance or delay in performances, <strong>and</strong> the obligations under the Contract shallbe resumed as soon as practicable after such event has come to an end or ceased to exist, providedfurther that if the performance in whole or part <strong>of</strong> any obligation under this contract is prevented ordelayed by reason <strong>of</strong> any such event beyond a period as mutually agreed to by the Railways <strong>and</strong> theContractor after any event or 60 days in the absence <strong>of</strong> such an agreement whichever is more, eitherparty may at its option terminate the Contract provided also that if the contract is so terminated underthis clause the Railway may at the time <strong>of</strong> such termination take over from the Contractor at prices asprovided for in the contract, all works executed or works under execution.49. SETTLEMENT OF DISPUTE AND ARBITRATION:49.1 MATTERS FINALLY DETERMINED BY THE RAILWAY:Al disputes or differences <strong>of</strong> any kind whatsoever arising out <strong>of</strong> or in connection with contract, whetherduring the progress <strong>of</strong> the work or after its completion <strong>and</strong> whether before or after the determination <strong>of</strong>the contract shall be referred by the contractor to the Railway <strong>and</strong> the Railway shall within 120 daysafter receipt <strong>of</strong> the contractor’s representation make <strong>and</strong> notify decisions on all matters referred to bythe contractor in writing provided that matter for which provision has been made in clauses 8(a), 1822(5),39, 43(2),45(a) 55, 55‐A(5), 57,57A, 61(1),61(2) <strong>and</strong> 62(i) (b) <strong>of</strong> General Conditions <strong>of</strong> Contract orin any clause <strong>of</strong> the Special Conditions <strong>of</strong> the Contract shall be deemed as ‘excepted matter’ <strong>and</strong> decision<strong>of</strong> the Railway authority, thereon shall be final <strong>and</strong> binding on the contractor provided further that‘excepted matter’ shall st<strong>and</strong> specifically excluded from the purview <strong>of</strong> the arbitration clause <strong>and</strong> not bereferred to arbitration.50. DEMAND FOR ARBITRATION:50.1 (i) In the event <strong>of</strong> any dispute or difference between the parties hereto as to the construction oroperation <strong>of</strong> this contract, or the respective rights <strong>and</strong> liabilities or the parties on any matter inquestion, dispute or difference on any account or as to the withholding by the Railway <strong>of</strong> any certificateto which the contractor may claim to be entitled to, or if the Railway fails to make a decision within 120days but within 180 days <strong>of</strong> his presenting his final claim on disputed matter shall dem<strong>and</strong> in writingthat the dispute or difference be referred to Arbitration.(ii) The dem<strong>and</strong> for arbitration shall specify the matter which are in question or subject <strong>of</strong> the dispute ordifference as also the amounts <strong>of</strong> claim item wise. Only such dispute (s) or difference(s) in respect sowhich the dem<strong>and</strong> has been made, together with counter claim or set <strong>of</strong>f shall be referred to arbitration<strong>and</strong> other matter shall not be included in the reference.(a)The Arbitration proceedings shall be assumed to have commenced from the day, a written <strong>and</strong> validdem<strong>and</strong> for arbitration is received by the Railway.(b) Thee claimant shall submit his claim stating the facts supporting the claims along with all relevantdocuments <strong>and</strong> the relief or remedy sought against each claim within a period<strong>of</strong> 30 days fromthe date <strong>of</strong> appointment <strong>of</strong> the Arbitral Tribunal.59


(c)The Railway shall submit its defence statement <strong>and</strong> counter claims, if any within a period <strong>of</strong> 60 days <strong>of</strong>receipt <strong>of</strong> copy <strong>of</strong> claims from Tribunal thereafter, unless otherwise extension has been granted byTribunal.(iii) No new claim shall be added during proceedings by either party. However party may amend orsupplement the original claim or defence there<strong>of</strong> during the course <strong>of</strong> arbitration proceedings subject toacceptance by Tribunal having due regard to the delay in making it.(iv) If the contractor(s) does/do not prefer his/their specific <strong>and</strong> final claims in writing, with a period <strong>of</strong> 90days <strong>of</strong> receiving the intimation from the Railways that the final bill is ready for payment he/they will bedeemed to have waived his/their claim(s) <strong>and</strong> the Railway shall be discharged <strong>and</strong> released <strong>of</strong> al liabilitiesunder the contract in respect <strong>of</strong> these claims.50.2 OBLIGATIONS DURING PENDENCY OF ARBITRATION:Work under the contract shall, unless otherwise directed by the Engineer, continue during thearbitration proceedings, <strong>and</strong> no payment due or payable by the Railway shall be withheld on account <strong>of</strong>such proceedings, provided, however, it ;shall be open for Arbitral Tribunal to consider <strong>and</strong> decidewhether or not such work should continue during arbitration proceedings.50.3 (a) (i) In cases where the total value <strong>of</strong> all claims in question added together does not exceedRs.10,00,000/‐(Rupees Ten Lakhs only), the Arbitral Tribunal consist <strong>of</strong> a sole arbitrator who shall beeither the General Manager or a gazette <strong>of</strong>ficer <strong>of</strong> Rail not below the grade <strong>of</strong> JA Grade nominated by theGeneral Manager in the behalf. The sole arbitrator shall be appointed within 60 days from the day whena written <strong>and</strong> valid dem<strong>and</strong> for arbitration is received by Railway.(ii)(iii)(iv)(v)In cases not covered by clause 50.3(a)(i), the Arbitral Tribunal shall consist <strong>of</strong> a panel <strong>of</strong> three GazettedRailway Officers not below JA Grade, as the arbitrators. For this purpose, the Railway will send a panel<strong>of</strong> more than 3 names <strong>of</strong> Gazetted Railway Officers <strong>of</strong> one or more departments, <strong>of</strong> the Railway to thecontractor who will be asked to suggest to General Manager up to 2 names out <strong>of</strong> the panel forappointments as contractor’s nominee. The General Manager shall appoint at least one out <strong>of</strong> them asthe contractor’s nominee <strong>and</strong> will, also simultaneously appoint the balance number <strong>of</strong> arbitrators eitherfrom the panel or from outside the panel, duly indicating the ‘Presiding arbitrator from amongst the 3arbitrators so appointed. While nominating the arbitrators it will be necessary to ensure that one <strong>of</strong>them is from the Accounts departments. An <strong>of</strong>ficer <strong>of</strong> Selection Grade <strong>of</strong> the Accounts department shallbe considered <strong>of</strong> equal status to the <strong>of</strong>ficers in SA grade <strong>of</strong> other departments <strong>of</strong> the Railways for thepurpose <strong>of</strong> appointment <strong>of</strong> arbitrators.If one or more <strong>of</strong> the arbitrators appointed as above refuses to act as above refuses to act as arbitrator,withdraws from his <strong>of</strong>fice as arbitrator, or vacates his/their <strong>of</strong>fice/<strong>of</strong>fices or is/are unable or unwillingto perform his functions as arbitrator for any reason whatsoever or dies or in the opinion <strong>of</strong> the GeneralManager fails to act without undue delay, General Manager shall appoint new arbitrator/arbitrators hadbeen appointed. Such re‐constituted Tribunal may at its discretion, proceed with the reference from thestage at which it was left by the previous arbitrator(s).The arbitral Tribunal shall have power to cal for such evidence by way <strong>of</strong> affidavits or otherwise as thearbitral Tribunal shall think proper, <strong>and</strong> it shall be the duty <strong>of</strong> the parties hereto to do or cause to bedone all such things as may be necessary to enable the Arbitral Tribunal to make the award without anydelay.While appointing arbitrator(s) under sub‐clause (i), (ii) <strong>and</strong> (iii) above, due care shall be take thathe/they is /are not the one/those who had an opportunity to deal with the matter to which the contractrelates or who in the course <strong>of</strong> his/their duties as Railway servant(s) expressed views on all or any <strong>of</strong>the matter under dispute or differences. The proceedings <strong>of</strong> the Arbitral Tribunal or the award made by60


such Tribunal will, however, not be invalid merely for the reason that one or more arbitrator had, in thecourse, <strong>of</strong> his service, opportunity to deal with the matter <strong>of</strong> which the contract relates or who in thecourse <strong>of</strong> his/their duties expressed views on all or any <strong>of</strong> the matter under dispute.(b)(i) The arbitral award shall state in item‐wise, the sum <strong>and</strong> reason upon which it is based.(ii) A party may apply for correction <strong>of</strong> any computational errors, any typographical or clerical errors orany other error <strong>of</strong> similar nature occurring in the award <strong>and</strong> interpretation <strong>of</strong> a specific point <strong>of</strong> awardto tribunal within 30 days <strong>of</strong> receipt <strong>of</strong> the award.(iii) A party may apply to tribunal within 30 days <strong>of</strong> receipt <strong>of</strong> award to make on additional award as toclaims presented in the arbitral proceedings buy omitted from he arbitral award.50.4 In case <strong>of</strong> the Tribunal, comprising <strong>of</strong> three Members, any ruling or award shall be made by a majority <strong>of</strong>Members <strong>of</strong> Tribunal. In the absence <strong>of</strong> such a majority the views <strong>of</strong> the Presiding Arbitrator shallprevail.50.5 Where the arbitral award is for the payment <strong>of</strong> money, no interest shall be payable on whole or any part<strong>of</strong> the money for any period till the date on which the award in made.50.6 The cost <strong>of</strong> arbitration shall be Born by the respective parties. The cost shall inter‐alia include fees <strong>of</strong>the arbitrator (s) as per the rates fixed by the Railway Administration from time to time.50.7 Subject to the provisions <strong>of</strong> the aforesaid Arbitration <strong>and</strong> conciliation Act 1996 <strong>and</strong> the rules there underthe any statutory modification there <strong>of</strong> shall apply to the arbitration proceedings under this clause.61


Section –IIChapter‐ 3Forms <strong>of</strong> Tenders etc.62


SECTION –IICHAPTER­3FORMS OF TENDERS ETC.FORM NO.1 : Offer letter.FORM NO.2 : Not Applicable.FORM NO.3 : Agreement.FORM NO. 4 : Guarantee Bond for Security Deposit.FORM NO.5 : Statement <strong>of</strong> Deviations.FORM NO.6 : St<strong>and</strong>ing Indemnity Bond for on accountPayment <strong>and</strong> Stores supplied by Rly.FORM NO. 7 : System Performance Guarantee.FORM NO.8 : Bank Guarantee for MobilisationFORM NO.9 : Not ApplicableFORM NO.10 : Acknowledgement for receiving materials <strong>and</strong>Cable from Railways.FORM NO.11 : Extension <strong>of</strong> period <strong>of</strong> completion <strong>of</strong> work.FORM NO.12 : Extension <strong>of</strong> period <strong>of</strong> completion <strong>of</strong> work.FORM NO.13 : Qualification Experience.FORM NO. 14 : Store Receipt Certificate.FORM NO. 15 : Annexure­U.63


FORM­IPara‐6.8 (a), Chapter‐1, Section‐IIToThe President <strong>of</strong> India,Acting through Chief Administrative Officer/IRPMU(or his successor),N C Railway,Shivaji Bridge(IRCOT Complex), New DelhiOFFER LETTERI/We ........................................................................ have read the various conditions to tender attached here to <strong>and</strong>hereby agree to abide by the said conditions. I/We also agree to keep this tender open for acceptance fora period <strong>of</strong> 180 days from the date fixed for opening the same <strong>and</strong> in default there<strong>of</strong>, I/We will be liablefor forfeiture <strong>of</strong> my/our Earnest Money. I/We <strong>of</strong>fer to do the work <strong>of</strong> Operation & Maintenance <strong>of</strong> therelay Interface unit with emergency EP valve to provide Interface with E‐70 Brake System in WAPLocomotives at the rates quoted by me/us in the attached schedules <strong>and</strong> hereby bind myself/ourselvesto complete the work within (‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐) months from the date `<strong>of</strong> issue <strong>of</strong> Letter <strong>of</strong> Acceptance <strong>of</strong> thetender. I/We also hereby agree to abide by the General <strong>and</strong> Special conditions <strong>of</strong> Contract <strong>and</strong> to carryout the work according to the Specifications for materials <strong>and</strong> works laid down by the Railways for thepresent contract.A sum <strong>of</strong> Rs.________ herewith forwarded as “Earnest Money”. The full value <strong>of</strong> Earnest Money shall st<strong>and</strong>forfeited without prejudice to any other rights or remedies if,(a) I/We do not execute the contract documents within 30 days after receipt <strong>of</strong> notice issued by theRailway that such documents are ready or,(b) I/We do not commence the work within 10 days after receipt or orders to that effect.3. Until a formal agreement is prepared <strong>and</strong> executed the acceptance <strong>of</strong> this tender shall constitute abinding contract between us subject to modifications, as may be mutually agreed to between us <strong>and</strong>indicated in the “Letter <strong>of</strong> Acceptance” <strong>of</strong> my/our <strong>of</strong>fer for this work.SIGNATURE OF CONTRACTOR(S)DATESIGNATURE OF WITNESS CONTRACTOR(S) ADDRESS1.............................................. .......................................................2.............................................. .......................................................64


FORM ­ 3Para­2/ Chapter­2,Section­IIAGREEMENTAN AGREEMENT made this ........................................................... day <strong>of</strong> ....................................... Two Thous<strong>and</strong> .......................... between the President <strong>of</strong> India, acting in the premises through the Chief Project Manager/IRPMU, NorthCentral Railway or his successor ......................................... <strong>of</strong> the Ministry <strong>of</strong> Railways, Railway Board (herein afterreferred to as “the Railway”) <strong>of</strong> one part <strong>and</strong> Messers .................................................. (herein after referred to as“Contractor”) <strong>of</strong> the other part, a .......................... Firm (Status <strong>of</strong> the firm) being represented by .....................................(Name & <strong>Design</strong>ation <strong>of</strong> the proprietor in case <strong>of</strong> sole proprietorship business or all the names <strong>and</strong> particulars incase <strong>of</strong> partnership firm etc.)Whereas in response to a call for <strong>Design</strong>, <strong>Supply</strong>, <strong>Installation</strong> <strong>and</strong> commissioning <strong>of</strong> IP DSLAM at variouslocations over Northern & North Central Railways <strong>and</strong> Central Organization <strong>of</strong> Railway Electrification as pertender papers at Annexure‐A hereto the Contractor has submitted a tender as per Annexure‐B hereto <strong>and</strong>whereas the said Tender <strong>of</strong> the Contractor has been accepted for .................. as per copy <strong>of</strong> Letter <strong>of</strong> Acceptance <strong>of</strong>Tender No..................................... dated ................... complete with enclosures at the accepted rates <strong>and</strong> agreeddeviations from Tender Papers ..................................................... as per Annexure‐C hereto <strong>and</strong> at an estimated contractvalue <strong>of</strong> Rs...................... (Rupees ............................................................ only).Now this agreement witnesses that in consideration <strong>of</strong> the premises <strong>and</strong> the payment to be made by thepurchaser to the contractor provided for herein below the Contractor shall supply all equipment <strong>and</strong> materials<strong>and</strong> execute <strong>and</strong> perform all works for which the said Tender <strong>of</strong> the Contractor has been accepted strictlyaccording to the various provisions in Annexure‐B <strong>and</strong> C hereto <strong>and</strong> upon such supply, execute <strong>and</strong> perform tothe satisfaction <strong>of</strong> the purchaser <strong>and</strong> the purchaser shall pay to the Contractor at the rates accepted as per thesaid Annexure‐C <strong>and</strong> in terms <strong>of</strong> provisions therein. In case if the Contractor is not a company incorporatedunder the Companies Act, 1956, the expression “Contractor” shall unless otherwise excluded by or repugnant tothe subject or context mean <strong>and</strong> include each <strong>of</strong> the successors‐ in‐ interest, agents, nominees, servants,beneficiaries etc. If it is a Sole Proprietorship business, in addition to this, such expression Contractor will alsoinclude each <strong>of</strong> his heirs, executors, <strong>and</strong> legal representatives.In the witness where <strong>of</strong> the parties have hereunto set <strong>and</strong> subscribed their respective h<strong>and</strong>s <strong>and</strong>/orseals day <strong>and</strong> year respectively mentioned against their respective signature.Signed <strong>and</strong> delivered at.................................................................... by Shri ..................................................... for <strong>and</strong> on behalf <strong>of</strong>Messers ....................................................................... the Contractor within named in the presence <strong>of</strong> ‐1. SignatureDateName in block CapitalsAddress2. SignatureDateName in block CapitalsAddressSigned <strong>and</strong> delivered at .............. ................................. for <strong>and</strong> on behalf <strong>of</strong> the President <strong>of</strong> India by Shri.......................................................... (General Manager or his successor) .......... ..... ........ ....................... Railway .................................. Ministry <strong>of</strong> Railways (Railway Board) in the presence <strong>of</strong> ‐65


1. SignatureDateName in block CapitalsAddress2. SignatureDateName in block CapitalsAddressAnnexure ‐AAnnexure ‐BAnnexure ‐C: Tender Paper No.: Firm’s Tender No.: Letter <strong>of</strong> Acceptance <strong>of</strong> Tender complete with enclosures._________________________(Signature)Dated:Complete with enclosures.66


FORM­4Para­3.2/Chapter­2,section­IIFORMAT OF GUARANTEE BOND FOR PERFORMANCE GUARANTEE(On Stamp Paper <strong>of</strong> Appropriate value)(To be used by approved Scheduled Banks)In consideration <strong>of</strong> the President <strong>of</strong> India (hereinafter called “the Government”) having agreed toexempt.................................................... (hereinafter called “The said contractor(s)”) from the dem<strong>and</strong>, underthe terms <strong>and</strong> conditions <strong>of</strong> an agreement No........................................... dated .................... made between.............................. <strong>and</strong> .................... For............................................................. (herein after called “the saidagreement”) <strong>of</strong> Security Deposit for the due fulfillment by the said contractor(s) <strong>of</strong> the terms <strong>and</strong>conditions contained in the said Agreement, or production <strong>of</strong> a Bank Guarantee for Rs............. (Rupees....................................... only), we...............................................................(Indicate the name <strong>of</strong> Bank) (Hereinafter referred to as ‘the Bank”) at the request<strong>of</strong>................................. Contractor(s) do hereby undertake to pay to the Government an amount notexceeding Rs............................ against any loss or damage caused to or suffered or would be caused to orsuffered by the Government by reason <strong>of</strong> any breach by the said Contractor(s) <strong>of</strong> any <strong>of</strong> the terms orconditions contained in the said Agreement.2. We...................................................................... Bank do hereby undertake to pay the amounts due <strong>and</strong> payableunder this Guarantee without any demur, merely on dem<strong>and</strong> from the Government stating the amount isclaimed is due by way <strong>of</strong> loss or damage caused to or would be caused to or suffered by the Governmentby reason <strong>of</strong> breach by the said Contractor(s) <strong>of</strong> any <strong>of</strong> terms or conditions contained in the saidAgreement or by reason <strong>of</strong> the Contractor(s) failure to perform the said Agreement. Any such dem<strong>and</strong>made on the Bank shall be conclusive as regards the amount due <strong>and</strong> payable by the Bank under thisguarantee. However, our liability under this guarantee shall be restricted to an amount not exceedingRs...............................3. We.................................................................... bank undertake to pay to the Government any money so dem<strong>and</strong>ednotwithst<strong>and</strong>ing any dispute or disputes raised by the Contractor(s)/Supplier(s) in any suit orproceedings pending before any court or Tribunal relating thereto our liability under this present beingabsolute <strong>and</strong> unequivocal.The payment so made by us under this Bond shall be a valid discharge <strong>of</strong> our liability for payment thereunder <strong>and</strong> the Contractor(s)/ Supplier(s) shall have no claim against us for making such payment.4. We........................................................... Bank further agree that the Guarantee herein contained shall remain infull force <strong>and</strong> effect during the period that would be taken for the performance <strong>of</strong> the said Agreement<strong>and</strong> that it shall continue to be enforceable till all the dues <strong>of</strong> the Government under or by virtue <strong>of</strong> thesaid agreement have been fully paid <strong>and</strong> its claims satisfied or discharged or till.................... <strong>of</strong>fice/department) Ministry <strong>of</strong> ...................... certifies that the terms <strong>and</strong> conditions <strong>of</strong> the said agreement havebeen fully <strong>and</strong> properly carried out by the said contractor(s) <strong>and</strong> accordingly discharges this Guarantee.Unless a dem<strong>and</strong> or claim under the Guarantee is made on us in writing on or before the .................................we shall be discharged from all liability under this Guarantee thereafter.5. We................................................................................ further agree with (Indicate the name <strong>of</strong> bank)the Government that the Government shall have the fullest liberty without our consent without affectingin any manner our obligations hereunder to vary any <strong>of</strong> the terms <strong>and</strong> conditions <strong>of</strong> the Agreement or toextend time <strong>of</strong> performance by the said Contractor(s) from time to time or to postpone for any time orfrom time to time any <strong>of</strong> the powers exercisable by the Government against the said Contractor(s) <strong>and</strong> t<strong>of</strong>orebear or enforce any other terms <strong>and</strong> conditions relating to the said Agreement <strong>and</strong> we shall not berelieved from our liability by reason <strong>of</strong> any such variation, or extension to the said Contractor(s) or forany forbearance, act or omission on the part <strong>of</strong> Government or any indulgence by the Government to thesaid Contractor(s) or by any such matter or thing whatsoever which under the law relating to suretieswould but for this provision, have no effect <strong>of</strong> so relieving us.67


6. This Guarantee will not be discharged due to the change in the Constitution <strong>of</strong> the Bank or theContractor(s)/Supplier(s).7. We ...................................................... lastly undertake not to revoke this(Indicate the name <strong>of</strong> bank)Guarantee during its currency except with the previous consent <strong>of</strong> the Government in writing.Dated the.......................... Day <strong>of</strong> ..................200 for......................................................................................(Indicate the name <strong>of</strong> the bank)68


FORM­5Para­6.8/ Chapter­1, Section­IISTATEMENT OF DEVIATIONSPROFORMA FOR STATEMENT OF DEVIATIONS1. The following are the particulars <strong>of</strong> deviations from requirement <strong>of</strong> the instructions to Tenderers,General Conditions <strong>of</strong> contract.1.1 Instructions to Tenderers & Condition <strong>of</strong> TenderingCLAUSE DEVIATION REMARKS(INCLUDING JUSTIFICATION)1.2 General Conditions <strong>of</strong> ContractCLAUSE DEVIATION REMARKS(INCLUDING JUSTIFICATION)1.3 Special Conditions <strong>of</strong> ContractCLAUSE DEVIATION REMARKS(INCLUDING JUSTIFICATION)2. The following are the particulars <strong>of</strong> deviations from requirement <strong>of</strong> the technical specifications(Separate Statement for each specification)CLAUSE DEVIATION REMARKS(INCLUDING JUSTIFICATION)NoteWhere there is no deviation, the statement should be returned duly signed with an endorsementindicating no deviations.69


FORM‐6Para‐8.2/Chapter‐2, Section‐IISTANDING INDEMNITY BOND(FOR ON ACCOUNT PAYMENTS & STORES SUPPLIED BY RLYS.)(On Stamp paper <strong>of</strong> Requisite Value)We, M/s……………………………………….. hereby undertake that we hold at our stores Depot/s at …………………………… for<strong>and</strong> on behalf <strong>of</strong> the president <strong>of</strong> India in the premises through the General Manager or his successor, North CentralRailway (herein after referred to as “the Purchaser”) al materials for which “On Account” payments have been madeto us against the contract for <strong>Survey</strong>, <strong>Design</strong>, <strong>Supply</strong>, <strong>Installation</strong> <strong>and</strong> commissioning <strong>of</strong> Loco Borne Equipment <strong>and</strong>Line‐side equipment for Train Protection Warning System(TPWS) in New Delhi –Agar Cantt section on Nothern &North Central Railway vide letter <strong>of</strong> Acceptance <strong>of</strong> Tender No……………………….. dated ………….. <strong>and</strong> the materialsh<strong>and</strong>ed over to us by the purchaser for the purpose <strong>of</strong> execution <strong>of</strong> the said Contract, until such time the materialsare duly erected or otherwise h<strong>and</strong>ed over to him.We shall be entirely responsible for the site custody <strong>and</strong> protection <strong>of</strong> the said materials against al risk till theyare duly delivered as erected equipment to the purchaser or as he may direct otherwise <strong>and</strong> shall indemnify thePurchaser against any loss, damage or deterioration what so ever in respect <strong>of</strong> the said materials while in ourpossession <strong>and</strong> against disposal <strong>of</strong> surplus materials.. The said materials shall at all times be open to inspection byany Officer authorized by the Chief Project Manager/IRPMU, N C Railway, Shivaji Bridge, New Delhi.Should any loss, damage or deterioration <strong>of</strong> materials occur or surplus material disposed <strong>of</strong>f <strong>and</strong> refund becomesdue, the purchaser shall be entitled to recover from us the full cost as per prices included in the Contract (asapplicable) <strong>and</strong> also compensation for such loss or damage if any along withThe amount to be refunded without prejudice to any other remedies available to him by deduction from any sumdue or any sum which at any time hereafter becomes due to us under the said or any other Contract.Date this ………………………day <strong>of</strong> ………………………, 200Signature <strong>of</strong> Witness:Name <strong>of</strong> Witness in block letter:Address:For <strong>and</strong> on behalf <strong>of</strong>Messers……………………………………..(Contractor)70


SYSTEM PERFORMANCE GUARANTEEPROFORMA FOR THE SYSTEM PERFORMANCE GUARNATEEFORM‐7Para‐22.2/Chapter‐1, Section‐IIToThe President <strong>of</strong> India.I/We …………………………………………………………………hereby guarantee that he design on the basis <strong>of</strong> which we havesubmitted our tender No………………………………………. has b been carefully made to conform to the end objectives in thetender documents <strong>and</strong> to technical specification therein. We further guarantee that in the event <strong>of</strong> the performance <strong>of</strong>the system, when installed, not complying with the end objectives or with the specifications contained in the tenderdocuments, we shall provide further inputs to enable the Railways to realize the end objectives contained in thesedocuments without any additional payment for any additional equipment which may be required in this regard. Wefurther guarantee that all the expenses including the expenses incurred in India for providing the additional inputswill be provided by us to make the system workable within 8 months from the date on which this guarantee isinvoked by the Purchaser.(Signature <strong>of</strong> firm’s authorized Officer)Seal:Signature <strong>of</strong> Witness:1…………………………..2…………………………...71


PROFORMA OF BANK GUARANTEE FOR MOBILISATIONADVANCE(On Stamp Paper <strong>of</strong> requisite value)(To be used by approved Scheduled Bank)FORM‐8Para‐46/Chapter‐2, Section‐II1. In consideration <strong>of</strong> the President <strong>of</strong> India (hereinafter called “the Government”)having agreed to exempt…………………………{herein after called”the said Contractor (s)”} from the dem<strong>and</strong>, under the terms <strong>and</strong> conditions <strong>of</strong> anAgreement No………………dated………….. made between………………….. <strong>and</strong> ……………………. For…………………………..(hereinafter called “the said Agreement”) <strong>of</strong> Mobilisation advance payment for the duefulfillment by the said Contractor(s) <strong>of</strong> the terms <strong>and</strong> conditions contained in the said Agreement, orproduction <strong>of</strong> a Bank Guarantee for Rs……………(Rupees…………………. Only). We,………………………………………. Hereinafter(indicate the name <strong>of</strong> the Bank)Referred to as”the Bank”) at the request <strong>of</strong> …………………Contractor (s) do hereby undertake to payRs…………………. Against any loss for damage caused to or suffered or would be caused to or suffered bythe government by reason <strong>of</strong> any breach by the said Contractor(s) <strong>of</strong> any <strong>of</strong> the terms or conditionscontained in the said Agreement.2. We,…………………………………………….. Bank do hereby undertake to pay the amounts due <strong>and</strong> payableunder this Guarantee without any demur, merely on dem<strong>and</strong> from the Government stating that theamount is claimed is due by way <strong>of</strong> loss or damage caused to or would be caused to or suffered by theGovernment by reason <strong>of</strong> breach by the said Contractor(s) <strong>of</strong> any <strong>of</strong> terms <strong>of</strong> or conditions contained inthe Agreement or by reason <strong>of</strong> the Contractor(s) failure to perform the said Agreement. Any suchdem<strong>and</strong> made on the Bank shall be conclusive as regards the amount due <strong>and</strong> payable by the Bankunder this guarantee. However, our liability under this guarantee shall be restricted to an amount notexceeding Rs………………………………….3. We, ……………………………….. bank undertake to pay to the Government any money so dem<strong>and</strong>ed notwithst<strong>and</strong>ing any dispute or disputes raised by the Contractor(s) Supplier(s) in any suit or proceedingspending before any Court or Tribunal relating thereto our liability under this present being, absolute<strong>and</strong> unequivocal.The payment so made by us under this bond shall be a valid discharge <strong>of</strong> our liability for payment thereunder <strong>and</strong> the Contractor(s) Supplier(s) shall have not claim against us for making such payment.4. We, …………………………… Bank further agree that the Guarantee herein contained shall remain in fullforce <strong>and</strong> effect during the period that would be taken for the performance <strong>of</strong> the said Agreement <strong>and</strong>that it shall continue to be enforceable till all the dues <strong>of</strong> the Government under or by virtue <strong>of</strong> the saidAgreement have been fully paid <strong>and</strong> its claims satisfied or discharged or till ……………….Office/Department) Ministry <strong>of</strong> ……………………. Certifies that the terms <strong>and</strong> conditions <strong>of</strong> the saidAgreement have been fully <strong>and</strong> properly carried out by the said Contractor(s) <strong>and</strong> accordinglydischarges this Guarantee. Unless a dem<strong>and</strong> or claim under the Guarantee is made on us in writing on orbefore the ………..(1) ………………………… we shall be discharged from all liability under this Guaranteethereafter.5. We, ………………………………… further agree with(indicate the name <strong>of</strong> Bank)The Government that the Government shall have the fullest liberty without our consent <strong>and</strong> withoutaffecting in any manner our obligations hereunder to very any <strong>of</strong> the terms <strong>and</strong> conditions <strong>of</strong> theAgreement or to extend time <strong>of</strong> performance by the said Contractor(s) from time to time or to postpone72


for any time or from time to time any <strong>of</strong> the powers exercisable by the Government against the saidContractor(s) <strong>and</strong> to forbear or enforce any <strong>of</strong> the terms <strong>and</strong> condition relating to the said Agreement<strong>and</strong> we shall not be relieved from our liability by reason <strong>of</strong> any such variation, or extension to the saidContractor(s) or for any forbearance, act or omission on the part <strong>of</strong> Government or any indulgence bythe Government to the said Contractor(s) or by any such matter or thing whatsoever which under thelaw relating to sureties would, but for this provision, have affect <strong>of</strong> so relieving us.6. This Guarantee will not be discharged due to the change in the Constitution <strong>of</strong> the Bank or theContractor(s)/Supplier(s).7. We, ………………………………………… lastly undertake not to revoke(indicate the name <strong>of</strong> Bank)This Guarantee during its currency except with the previous consent <strong>of</strong> the Government in writing.Dated the …………. Day <strong>of</strong> ……………………200For ……………………………………………(indicate the name <strong>of</strong> the Bank)Witness1 Signature………………………………………Name ………………………………………2 Signature ………………………………………Name ……………………………………..NOTE: (1)contract.The guarantee shall be valid for a period <strong>of</strong> two months after the expiry <strong>of</strong> the currency <strong>of</strong> the73


FORM‐9Para‐18.3/Chapter –II, Section‐IICERTIFICATEJoint Inspection <strong>of</strong> Cable Trench & Protective Works1. The cable trench/chase including ducts, pipes etc. arrangements enroute has been jointly inspected by uson the following section <strong>and</strong> the work has been done according to the specifications. The laying <strong>of</strong> cable canbe taken on these sections after the deficiencies noted below are rectified <strong>and</strong> <strong>of</strong>fered for further check.2.‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐SI.No. From KM. To KM. Remarks/Deficiency if any‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐3. The following Joints have been jointly supervised <strong>and</strong> provided as per manufacturer’s instructions <strong>and</strong> itis confirmed that all the materials or kit have been used up.‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐SI.No. Type <strong>of</strong> Joint Location (KM.No.) Remarks/Deficiency if any‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Signature <strong>of</strong> Contractor’sRepresentative with<strong>Design</strong>ationSignature <strong>of</strong> Purchaser’sRepresentative with<strong>Design</strong>ation74


FORM‐10Para‐8.3/Chapter‐2, Section‐IIACKNOWLEDGEMENTFOR RECEIVING MATERIALS FROM RAILWAYSTATION:DATE:Sub:‐Receipt <strong>of</strong> Materials from Railway.It is hereby acknowledged that the following material as detailed have been received in full <strong>and</strong> good condition by meon ………………..…………………… at ………………… for the work coming under the Agreement No…………………….. dated…………‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐SI.No. Description <strong>of</strong> Material Quantity RemarksIf any‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Witnessed by:‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐(Signature <strong>of</strong> Purchaser’s(Signature <strong>of</strong> Contractor orRepresentative withContractor’s Representative)<strong>Design</strong>ation)75


FORM‐11Para‐36/Chapter‐2, Section‐IIEXTENSION OF PERIOD OF COMPLETION OF WORKON CONTRACTOR’S ACCOUNT(Regd.With A/D)No.Date:To………………….……………………Sub:(i)……………………..(Name <strong>of</strong> Work)(ii)Acceptance Letter No………………..(iii) Undertaking / Agreement No………Ref: ………………… (Quote specific application <strong>of</strong> theContractor for extension to date, if received).Dear Sir,The stipulated date for completion <strong>of</strong> the work mentioned above is/was ……………. However, the workis/was not completed on this date.Expecting that you may be able to complete the work <strong>of</strong> some time is given <strong>and</strong> in consideration <strong>of</strong> yourLetter No……………, the General Manager (or his successor) on behalf <strong>of</strong> the president <strong>of</strong> India, although notbound to do so, hereby extends the time for completion from ………. to………..Please note that liquidated damages @1/2% per week or part there<strong>of</strong> <strong>of</strong> the entire contract value will berecovered for delay in the completion <strong>of</strong> the work after the expiry <strong>of</strong> (1)………………. From you as mentioned inpara <strong>of</strong> the Special Conditions <strong>of</strong> Contract for the extended period.The above extension <strong>of</strong> the completion date will also be subject to the further condition that no increasein rates on any account will be payable to you.Please note that in the event <strong>of</strong> declining to accept the extension on the above said conditions or in theevent <strong>of</strong> your failure after accepting or acting up to this extension to complete the work by (2) …………….(heremention the extended date), further action will be taken in terms <strong>of</strong> relevant para <strong>of</strong> Conditions <strong>of</strong> Contract.Your’s faithfully,For & on behalf <strong>of</strong> President <strong>of</strong> India.Note:‐1. Give here the stipulated date for completion without any penalty fixed earlier.2. Here mention the extended date.76


FORM ‐12Para‐36/Chapter‐2, Section‐IIEXTENSION OF PERIOD OF COMPLETION OF WORKNo.Date:To………………..………………..………………..Dear Sirs,Sub: (i)……………………………… (Name <strong>of</strong> Work)(ii)Acceptance Letter No………………………….(iii) Undertaking/Agreement No………………….Ref:…………………(quote specific application <strong>of</strong> theContractor for extension to the date, if received).The stipulated date for completion <strong>of</strong> subject work under the above contract was …………………….. Inconsideration <strong>of</strong> the Contractor’s Letter No…………………. , The General Manger (or his successor) behalf <strong>of</strong> thePresident <strong>of</strong> India, is pleased to grant extension <strong>of</strong> the time for completion <strong>of</strong> works without liquidated damagesunder para 36 <strong>of</strong> Chapter II, <strong>of</strong> the contract as mentioned below:“ ………………………………………”It may be noted that unless repugnant to the context, alt he terms <strong>and</strong>conditions <strong>of</strong> the Contract will remain unaltered during the extended period from …………….. to ………… also, <strong>and</strong>further no increased additional rates <strong>and</strong> claims <strong>of</strong> recoveries which have not been already envisaged in terms <strong>of</strong>the conditions <strong>of</strong> the Contract will be leviable either by you or by the purchaser in respect <strong>of</strong> the this extendedperiod.Your's faithfully,( )for <strong>and</strong> on behalf <strong>of</strong> President <strong>of</strong> India77


FORM­13QUALIFICATION EXPERIENCEList <strong>of</strong> Works completedDescription <strong>of</strong>WorkOrganisation forwhom executedApprox.value <strong>of</strong>contract atthe time <strong>of</strong>awardDate <strong>of</strong>awardDate <strong>of</strong>scheduledcompletion <strong>of</strong>workDate <strong>of</strong> actualStartCompletionFinal value<strong>of</strong> contractList <strong>of</strong> Works in H<strong>and</strong>Description <strong>of</strong>workContract ValueApprox. value <strong>of</strong> balance workyet to be doneDate <strong>of</strong> award78


FORM ­14RECEIPT CERTIFICATE (FOR SUPPLY ONLY)From: Sr. Section Engineer/Section Engineer (Signal/Telecom)/North Central Railway,No. Date :1. Contract No2. Name <strong>of</strong> Work3. Item No .As in Rate Schedule4. Description <strong>of</strong> Itme.5. Material Inspected by:6. Dispatch particular & date7. Qty as per dispatch particular8. Qty received9. Qty short received10. Condition on Stores Received11. Name <strong>of</strong> Firm & Address12. Place <strong>of</strong> receipt13. Date <strong>of</strong> receipt14. Ledger No.15. Name & designation <strong>of</strong> Stores In‐ charge‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Signature <strong>of</strong> Stores –in – Charge79


ANNEXURE-U,Section- II, Chapter- 3FORM NO.15MEMORANDUM OF UNDERSTANDING(To be signed on Rs.100/- Non judicial stamp paper)This Memor<strong>and</strong>um <strong>of</strong> Underst<strong>and</strong>ing (hereinafter referred to as the “MOU”) is made <strong>and</strong> enteredinto this day <strong>of</strong> 2010.BY AND BETWEENAB, a company within the meaning <strong>of</strong> the Companies Act, 1956 having its registered <strong>of</strong>fice at……………………………………………/a Partnership firm having its <strong>of</strong>fices at………………………………………../a Proprietorship concern having its <strong>of</strong>fice at……………………………… Represented by its Managing Directors/Partner/Proprietor whichexpression shall unless excluded by or repugnant to the context be deemed to mean <strong>and</strong> include itssuccessors <strong>and</strong> assigns (hereinafter referred as AB) <strong>of</strong> the FIRST PART.ANDCD, a company within the meaning <strong>of</strong> the Companies Act, 1956 having its registered <strong>of</strong>fice at……………………………………………/a Partnership firm having its <strong>of</strong>fices at………………………………………../a Proprietorship concern having its <strong>of</strong>fice at……………………………… Represented by its Managing Directors/Partner/Proprietor whichexpression shall unless excluded by or repugnant to the context be deemed to mean <strong>and</strong> include itssuccessors <strong>and</strong> assigns (hereinafter referred as CD) <strong>of</strong> the SECOND PART.ANDEF, a company within the meaning <strong>of</strong> the Companies Act, 1956 having its registered <strong>of</strong>fice at……………………………………………/a Partnership firm having its <strong>of</strong>fices at………………………………………../a Proprietorship concern having its <strong>of</strong>fice at……………………………… Represented by its Managing Directors/Partner/Proprietor whichexpression shall unless excluded by or repugnant to the context be deemed to mean <strong>and</strong> include itssuccessors <strong>and</strong> assigns (hereinafter referred as EF) <strong>of</strong> the THIRD PART.The First Part, Second Part <strong>and</strong> Third Part hereinabove together are hereinafter referred to as “Theparties”.WHEREAS the parties hereto, have agreed to enter into a Joint Venture for the purpose <strong>of</strong>participation <strong>of</strong> Bid in respect <strong>of</strong> the Tender No…………………………………….. for………………………………………………………… (hereinafter referred to as the said Tender)invited by the Chief Administrative Officer, Indian Railway Project Management Unit, New Delhi(hereinafter referred to as “Employer”).AND WHEREAS in the event <strong>of</strong> the joint venture being successful in its bid, the parties have agreedto perform the contract in accordance with the agreed terms <strong>and</strong> conditions there<strong>of</strong> <strong>and</strong> in the spirit <strong>of</strong>mutual Co-operation to achieve the objective <strong>of</strong> this joint venture to the full satisfaction <strong>of</strong> theEmployer.NOW, therefore, for <strong>and</strong> in consideration <strong>of</strong> the foregoing premises <strong>and</strong> other considerations <strong>and</strong>covenants hereinafter set forth, the parties hereby agree as follows :80


ARTICLE 1 Form <strong>of</strong> Agreement1.1 That a Joint Venture is formed herein by the said (1) AB ………………………… (2) CD………………………………… AND (3) EF …………………………… <strong>and</strong> to be carried out in thename <strong>and</strong> style <strong>of</strong> _________________________ (JV).1.2 The Parties shall jointly prepare <strong>and</strong> submit tender documents for the said Contract <strong>and</strong> shalljointly perform the said Contract if any contract is awarded to the Joint Venture <strong>and</strong> shall be jointly<strong>and</strong> severally liable to the Employer for the contract.1.3 The Principal place <strong>of</strong> the <strong>of</strong>fice <strong>of</strong> the Joint Venture shall be situated at the <strong>of</strong>fice <strong>of</strong>…………………………………………………… And for the purpose <strong>of</strong> all correspondence theaddress is as follows ………………………………ARTICLE 2 Lead Partner2.1 The parties have agreed to appoint AB/CD/EF as the lead Partner <strong>of</strong> the Joint Venture for theperformance <strong>of</strong> said contract who are herein nominated by the parties to the Joint Venture asauthorized representative for <strong>and</strong> on behalf <strong>of</strong> the Joint Venture during the qualification <strong>and</strong> biddingperiods <strong>and</strong> in the event the Project is awarded to Joint Venture during the contract executionAB/CD/EF in the capacity <strong>of</strong> lead Partner are authorized to incur liabilities <strong>and</strong> receive instructionsfor <strong>and</strong> on behalf <strong>of</strong> any all the parties to Joint Venture or its constituents.2.2 In connection with the contract, if necessary, the parties shall take decisions by mutual consent.ARTICLE 3 Participation <strong>of</strong> Share3.0 The Parties agree that their respective participation/share in the Joint Venture (hereinafter called“Participation Share” shall be………………………………………….. for AB………………………………………….. for CD………………………………………….. for EFARTICLE 44.0 On issue <strong>of</strong> L.O.A. if awarded the contract an agreement among the members <strong>of</strong> JV firm will beexecuted on this basis <strong>of</strong> the terms <strong>and</strong> conditions mentioned herein <strong>and</strong> the said agreement has to beregistered before this Register <strong>of</strong> companies Act or before this Registrar/Sub-Register under thisRegistration Act, 1908.81


ARTICLE 5 Responsibility for Execution <strong>of</strong> Contracts5.1 The Parties hereto shall, if awarded the contract for the Project, be jointly <strong>and</strong> severally liable toEmployer for Execution <strong>of</strong> the project in accordance with General & Special Conditions <strong>of</strong> theContract. The parties hereto also undertake to be liable jointly <strong>and</strong> severally for the loss, damagescaused to the Employer in course <strong>of</strong> execution or due to non-execution <strong>of</strong> the contractor part there<strong>of</strong>or arising out <strong>of</strong> the contract.5.2 The parties shall be jointly <strong>and</strong> severally legally liable to the Employer for all obligation arisingfrom <strong>and</strong> in connection with the bidding process <strong>and</strong> execution <strong>of</strong> the said Contract in accordancewith the terms <strong>and</strong> conditions as shall be agreed with the employer.5.3 AB/CD/EF shall act as most experienced partner. All the parties shall be responsible forproviding key personnel in the discipline <strong>of</strong> site management general planning <strong>and</strong> plant operationduring the whole period <strong>of</strong> contract execution, in addition to execution <strong>of</strong> the work <strong>and</strong> performance<strong>of</strong> the contract in accordance with the contract agreement.5.4 As agreed between themselves, each party shall be fully responsible for the fulfillment <strong>of</strong> allobligations <strong>of</strong> its scope <strong>of</strong> the work for the said Contract to be executed subject to the Agreementbetween the parties <strong>and</strong> shall hold harmless <strong>and</strong> indemnified against any damage arising from itsdefault or non-fulfillment <strong>of</strong> such obligations.5.5 If any party fails to perform its obligations during the execution <strong>of</strong> the said contract <strong>and</strong> to curesuch breach within the period designated by the non-defaulting party, then the other parties shallhave the right to take up the work, the right <strong>and</strong> responsibilities <strong>of</strong> the defaulting party at the cost <strong>and</strong>risk <strong>of</strong> the defaulting party.ARTICLE 6 Duration <strong>of</strong> the Joint Venture Agreement6.1 This MOU shall come into effect from the date it is executed <strong>and</strong> remain valid till all the matersin connection with the said contract for which this agreement is executed are over <strong>and</strong> settled <strong>and</strong>shall not be terminates unless <strong>and</strong> until this work awarded under this contract is completed in allrespect <strong>and</strong> also till the maintenance period is over or till all this contractual liabilities are dischargedcompletely.6.2 This MOU shall be automatically terminated in case the L.O.A. is not AWARDED TO THEJoint Venture.ARTICLE 7 Governing Laws7.0 This agreement shall be governed <strong>and</strong> constructed in accordance with the laws <strong>of</strong> the Republic <strong>of</strong>India.82


ARTICLE 8 Authorized Member8.1 All the Joint Ventures partners i.e. AB, CD <strong>and</strong> EF nominate, constitute, authorize <strong>and</strong>Appoint………………………………………Director/Partner/Proprietor <strong>of</strong>…………………………………………. To deal with tender, to sign the agreement or enter intocontract is respect <strong>of</strong> the said tender, to receive payment, to witness joint measurement <strong>of</strong> work done,to sign measurement books <strong>and</strong> similar such action in respect <strong>of</strong> the said tender/contract.8.2 All the correspondences with respect to the contract would be sent only to Sri…………………………………………… authorized member <strong>of</strong> ……………………….. JV by Sri…………………………………. Authorized member <strong>of</strong> the JV. In case <strong>of</strong> any dispute/deferencearises with the Railway Administration then Sri ………………………. Authorized member <strong>of</strong> theJV firm will be authorized to refer the claim to the authorized on behalf <strong>of</strong>…………………………………… (JV) in terms <strong>of</strong> General Conditions <strong>of</strong> Contract <strong>and</strong> Specialcondition <strong>of</strong> Contract <strong>of</strong> the Railway <strong>and</strong> any proceedings will be dealt by…………………………………………… Only, before the Arbitration during the Arbitrationproceedings <strong>and</strong> before any Courts <strong>of</strong> Law in the country.ARTICLE 9 Assign ability9.0 No party to Joint Venture has the right to assign or transfer the interest, right or liability in thecontract without the written consent <strong>of</strong> the other party <strong>and</strong> that <strong>of</strong> the Employer in respect <strong>of</strong> the saidtender/contract.ARTICLE 10 Use <strong>of</strong> Machinery, Instruments, Labour Force etc.10.0 The parties here to undertake that whatever the machinery, instruments, labour force, (includingunskilled, skilled, inspectors, engineers etc.) they possess as the time <strong>of</strong> entering into Joint VentureAgreement or which subsequently shall come in their possession <strong>and</strong> if such machinery, instruments,labour force is required for the speedy <strong>and</strong> efficient execution <strong>of</strong> the work, the party/parties havingthe control over said machinery, instruments, labour force etc. without having any regard to theirshare <strong>of</strong> Pr<strong>of</strong>it <strong>and</strong> loss agreed to between the parties in Joint Venture Agreement shall h<strong>and</strong> over thesame at the disposal <strong>of</strong> the other party who is actually executing the work for purpose <strong>of</strong> execution <strong>of</strong>the contract without any hindrance <strong>and</strong> obstacle.ARTICLE 11 Bank Account11.0 One or more Joint Venture account shall be opened in the name <strong>of</strong> the Joint Venture with suchBank or Banks <strong>and</strong> shall be operated by both the parties jointly. Payment should be made by theRailways in that particular Joint Venture Bank account only, which will be intimated by the partiesjointly to the Railways after opening the said Joint Venture Bank Account.83


ARTICLE 12 Tender/Estimate Work12.1 Preparation for the tender/bid will be co-ordinated by as agreed from time to time.12.2 All the parties shall co-operate on the estimation work for the project.12.3 Any expenses <strong>and</strong> costs incurred by any party for <strong>and</strong> in connection with the preparation,submission negotiation etc. up to <strong>and</strong> for bidding process shall be borne individually by the partyincurring the same except when all the parties agree otherwise.ARTICLE 13 Arbitration13.1 All disputes or differences which may arise out <strong>of</strong> in relation to or in connection with thisagreement shall be settled amicably between the parties hereto.However, in case any dispute or difference is not settled each party shall have the right for arbitration<strong>and</strong> Conciliation Act 1996 <strong>and</strong> rules framed there under. Arbitration should be held within thejurisdiction <strong>of</strong> New Delhi.13.2 None <strong>of</strong> the parties shall be entitled to suspend the performance <strong>of</strong> the agreement merely byreason <strong>of</strong> the reference <strong>of</strong> a dispute to arbitration <strong>and</strong> the parties shall continue with the execution <strong>of</strong>the project irrespective <strong>of</strong> the Arbitration proceedings.IN WITNESS WHEREOF the authorized representatives <strong>of</strong> the parties hereto have executed thisagreement on the day, month <strong>and</strong> year first above written.WITNESS:1.FIRST PARTY2. SECOND PARTYTHIRD PARTY84


Section –IIIChapter‐1Technical Supplement85


INSTALLATION PRACTICESA. GENERAL1.0 The work shall be carried out according to the drawings approved by the Railways <strong>and</strong> shallconform to the provisions <strong>of</strong> the “Signal Engineering Manual” “Telecom Engineering Manual”“Schedule <strong>of</strong> Dimension”, “RDSO Specifications” <strong>and</strong> “Manual <strong>of</strong> Instructions for <strong>Installation</strong><strong>of</strong> S&T equipment on 25 KV, 50 Cycles, A.C. electrified sections” as modified from time totime unless deviations, if any, are specifically approved by the Engineer-in-charge. TheContractor shall be solely responsible for the proper execution <strong>of</strong> the work as per the saiddeviation <strong>and</strong> specifications.2.0 Foundation:2.1 Conforming to the Signaling plan <strong>and</strong> cable plan, the positions <strong>of</strong> foundations forapparatus cases, junction boxes, cable termination boxes, power panels as required, willbe indicated but the Engineer’s representative at site before the commencement <strong>of</strong> thework at the station.2.2 The excavation <strong>of</strong> pits for various type <strong>of</strong> foundation shall be done as per drawings orthe instructions given by Engineer’s representative <strong>and</strong> during the excavation, the earth<strong>of</strong> the pit shall be thrown on plain ground away from track <strong>and</strong> left out earth if any, shallbe thrown outside the Railway premises.2.3 Before casting <strong>of</strong> foundations, the Contractor’s representative <strong>and</strong> the Engineer’srepresentative shall jointly inspect the quality <strong>and</strong> depth <strong>of</strong> pits, quality <strong>of</strong> bricks,concrete etc. <strong>and</strong> ensure compliance as per the drawings <strong>and</strong> specifications.3.0 Apparatus case erection:3.1 Cable for apparatus case shall be taken inside the case. Exposed cable should beprotected by suitable means.3.2 The apparatus cases, junction boxes <strong>and</strong> cable termination boxes shall be vertical <strong>and</strong>plumb.4.0 Cable laying <strong>and</strong> termination:4.1 Cable opening in Apparatus cases, junction boxes <strong>and</strong> in relay rooms should be coveredby s<strong>and</strong> <strong>and</strong> top should be plastered by cement for apparatus cases <strong>and</strong> junction boxes.4.2 The cables in sufficient spare lengths shall be kept coiled in a circle <strong>of</strong> suitable diameterat 1.2 meter depth before being taken into the relay rooms/apparatus cases <strong>and</strong> fieldoperation for termination. Such coils <strong>of</strong> cables in pits shall be adequately covered bys<strong>and</strong> <strong>and</strong> bricks to provide protection against damage.4.3 For each station, the cable route plan will be supplied by Railways before thecommencement <strong>of</strong> the cable laying work at the station. However, under the exigencies<strong>of</strong> local conditions or for any other consideration, the Engineer in- charge may alter thecable route plan. The Engineer’s representative in-charge <strong>of</strong> the work will mark theroute <strong>of</strong> the cable with chalk or lime, as per cable route plans/cable plans <strong>and</strong> theEngineer’s instruction to him, which shall be taken by the contractor. He shall lay thecables only along this route. The contractor shall be present at the time <strong>of</strong> marking theroute <strong>of</strong> the cables <strong>and</strong> he shall furnish to the Engineer’s representative requiredquantities <strong>of</strong> lime, rope, labour etc. for carrying out this work at the cost <strong>of</strong> theContractor.86


4.4 Cables laying should commence only after the depth <strong>and</strong> quality <strong>of</strong> trenches checked,quantity <strong>of</strong> bricks <strong>and</strong> arrangements for tempted filling etc. are inspected jointed by theEngineer’s representative <strong>and</strong> contractor’s representative <strong>and</strong> approved by theEngineer’s representative4.54.6 Trenching for track crossing <strong>and</strong> laying <strong>of</strong> cables across the track should be done only inthe presence <strong>of</strong> the Engineer’s representative.4.7 Cables shall not be normally taken over the running track at the time <strong>of</strong> cable laying bythe Contractor, as this is likely to cause accident to trains <strong>and</strong> damage to cable. If, at anytime, the cable has to be taken across the track, it shall be done only in the presence <strong>of</strong>the Engineer’s representative <strong>and</strong> after due safety precautions have been taken.4.8 The h<strong>and</strong>ling laying <strong>and</strong> pulling <strong>of</strong> wires <strong>and</strong> cable shall be in accordance withinstructions <strong>and</strong> under supervision <strong>of</strong> the contractor. For laying the cables, the drumshall be mounted on axle at one <strong>of</strong> the trench <strong>and</strong> the cable laid out <strong>and</strong> carried bycontractor’s laborers guiding the cable into the trench.4.9 Cable should be properly terminated in the terminal boards/ racks.4.10 Bends in cables shall have a radius <strong>of</strong> not less than 20 times the diameter <strong>of</strong> thecables.4.11 Eyelet terminals shall be used on flexible wires. If necessary.4.12 Not more than two wire shall be connected to one terminal/tag.4.13 Cables terminated inside apparatus cases, junction boxes <strong>and</strong> in relay room should befixed by clamp or any other method indicated by Engineer’s representative.4.14 Terminals shall be mounted so that they cannot be turned in base <strong>of</strong> frame to whichapplied. They shall be properly insulated from each other <strong>and</strong> other metallic parts.4.15 Terminals shall be installed in an accessible position <strong>and</strong> neatly arranged on terminalboards in housings.4.16 The terminal block provided at the locations, <strong>and</strong> other places shall be provided withsuitable links to facilitate isolation <strong>of</strong> the two sides <strong>of</strong> the circuits which are connectedthrough the terminals links.4.17 With the help <strong>of</strong> Meg Ohm insulation resistance test shall be conducted on all cores <strong>of</strong>each cable jointly by the representative <strong>of</strong> the Engineer <strong>and</strong> the Contractor before thecables is connected or wired to the signalling equipment. The insulation resistance shallbe measured between a core <strong>and</strong> all other cores connected together to the sheath <strong>and</strong>earth. The results <strong>of</strong> the insulation resistance test shall be tabulated in the form given asAnnexure-III <strong>and</strong> the form signed by the representatives <strong>of</strong> the contractor <strong>and</strong> theEngineer.4.18 With the help <strong>of</strong> Wheat Stone Bridge, loop resistance test shall be conducted on all cores<strong>of</strong> each cable jointly by the representative <strong>of</strong> the Engineer <strong>and</strong> the Contractor before thecable is connected or wired to the signaling equipment. The result <strong>of</strong> the loop resistancetest shall be tabulated in the form given as Annexure-III <strong>and</strong> the form signed by therepresentative <strong>of</strong> the contractor <strong>and</strong> the Engineer.87


5.0 Relay Racks:5.1 Relay racks should be <strong>of</strong> metal which can be assembled with plug-in-base plates <strong>and</strong>factory pre-wired base plates for ready installation. The rack include all the necessaryrack fittings, supports in the relay room, arrangement for fixing fuses <strong>and</strong> relay basses,as per approved Northern Railway drawings. The outside colour should be light yellow.It should be powder coated for long life. It should be corrosive resistant.5.2 Relay racks shall be provided with anti-vibration protection.5.3 Relay racks shall be mounted in the relay room as per the position indicated by theRailway representative.5.4 MDF Rack will be similar to relay rack <strong>and</strong> will include all materials requires forformation <strong>of</strong> outdoor/indoor cables, fixing <strong>of</strong> terminals, fuses, fuse bases, transformers<strong>and</strong> other accessories as per instruction <strong>of</strong> Engineer at site.6.0 Relays:6.1 General:(i) In case <strong>of</strong> AC electrified areas, the relays shall be in conformity with RE manual.(ii) In case <strong>of</strong> application in rolling stock, the on-Board Interface relays shall be fit forrolling stock application.6.2 <strong>Design</strong>:Relays shall be <strong>of</strong> a design approved by the Railways. Relay shall be provided withmeans to ensure that it cannot be plugged into a wrong base.6.3 Mounting:Relay base plate shall be fixed on the relay racks for vertical mounting. Relay base plateshall be phonemic modulated for other approved insulated material <strong>and</strong> shall haveadequate mechanical <strong>and</strong> dielectric strength <strong>and</strong> insulation qualities. The fastening <strong>of</strong>relay to relay base plate shall be so securely hold the relay in place <strong>and</strong> yet be easilyremovable. Contact pressure between relay <strong>and</strong> base plate shall be adequate to keepconstant uninterrupted contact.7.0 Sealing <strong>and</strong> calibration:The enclosure containing the moving parts <strong>of</strong> the relay shall be sealed withmanufacturer’s seal or sealing arrangement should be provided. Each coil shall haveattached to it, secured by outside binding a tag which shall be clearly <strong>and</strong> indeliblymarked with the following particulars.a). Manufacturer’s reference No.b). Size <strong>of</strong> wire <strong>and</strong> kind <strong>of</strong> insulation.c) Resistance <strong>of</strong> the coil (for DC relays only).d). No. <strong>of</strong> turns (for DC relay only).8.0 Interconnections/wiring:8.1 <strong>Installation</strong> <strong>of</strong> control panels, cable terminations <strong>and</strong> relay racks shall have to be done atthe respective places. Writing <strong>of</strong> relay racks <strong>and</strong> control panel shall be carried out as percircuit diagram approved by the Railway providing interconnection arrangementsbetween the racks <strong>and</strong> control panels.88


8.2 Interconnection between terminal racks/boards <strong>and</strong> relay racks shall be carried out byproviding ladder arrangements or by any other arrangement as instructed by Engineer’srepresentative.8.3 Interconnection between control panel <strong>and</strong> other racks shall be with ladder arrangement.The ladder arrangement <strong>of</strong> suitable capacity are to be fixed neatly <strong>and</strong> firmly withproper support.8.4 The equipments are to be wired in relay room, control panel, power supply arrangement,apparatus case, cable termination box, battery box <strong>and</strong> in other locations.8.5 Cables termination racks should be erected in the relay room. Suitable cable ducts asrequired, shall be provided to bring all outside cable to the termination rack. RCC slabsshall be manufactured at site <strong>and</strong> duct covered. All the cables are to be neatly fixed <strong>and</strong>terminated in order.8.6 Terminals supporting the fixed part <strong>of</strong> front <strong>and</strong> back contacts <strong>and</strong> relay shall befastened on their supports so as to preclude adjustments <strong>of</strong> any kind without firstbreaking the seal <strong>of</strong> the relay.8.7 10% spare wire shall be installed between terminals, control panel, illuminated diagrams<strong>and</strong> relay racks.8.8 It shall be possible to identify wires to all terminals by mean <strong>of</strong> non-metallic tag or labelon which is stamped the designation corresponding to that on the circuit <strong>and</strong> wiringplan. Contractor may adopt any other means subject to approval <strong>of</strong> the Railways. Tagshall be applied in such a manner that if a wire is removed from the terminal the tag willremain on the wire.8.9 Where practicable the tag or lables shall be securely fastened adjacent to the terminals orsuitably painted so that the number can be easily read.8.10 All writing in the cabin <strong>and</strong> locations shall be terminated on suitable terminal block/tagblock having minimum insulation resistance <strong>of</strong> 500 Meg Ohms at 500 VDC. Theterminal block/tag block shall be covered with plastic cover.8.11 The colour <strong>of</strong> the wires for writing should be <strong>of</strong> as per st<strong>and</strong>ard colour scheme used onthe Railways which is as follows:a Black 110V Bx & Nx, 24 VNxb Green 24V steady panel indicationc Red 24V flashing panel indicationd Blue 60V DC positivee Grey 60V DC negativeThe above colour scheme shall be followed as required.8.12 The front side glass <strong>of</strong> relays shall not be <strong>of</strong> plastic. It should be covered with plainglass to avoid opacity for long.8.13 No joints are permitted in the connection wires.8.14 Wiring <strong>of</strong> relays housing shall be uniform for like apparatuses throughout theinstallation.9.0 FUSES, TERMINAL AND TERMINAL LINKS:A. It should not be possible to insert a cartridge <strong>of</strong> a higher rating into a holder <strong>of</strong> lowerrating.B. Fuses shall be <strong>of</strong> non-deteriorating type confirming <strong>of</strong> RDSO specifications.C. Fuses clips shall be mounted on an insulating base <strong>of</strong> firepro<strong>of</strong> material.D. Fuses or circuits breakers shall be installed according to st<strong>and</strong>ard practice with priorapproval <strong>of</strong> the Railway.89


10.0 INSULATION:Provision <strong>of</strong> insulation wherever required will be to follow st<strong>and</strong>ard approved Railwaypractice for the purpose. Material used for insulation shall be such that it will not beinjuriously affected by atmospheric conditions.11.0 TESTING AND COMMISSIONING:<strong>Testing</strong> <strong>and</strong> commissioning consists <strong>of</strong> testing <strong>of</strong> the telegram <strong>of</strong> the balise <strong>and</strong> infillbalise,communicating the exact position <strong>of</strong> aspect <strong>of</strong> the signal to which the infill-baliseis connected, LEU accepting the proper <strong>and</strong> exact aspect <strong>of</strong> the signal, communicatingthe aspect information to the balise, properly picking the signal aspect by the On-boardequipment passing over the balise <strong>and</strong> acting as per technical specifications given in thedocument <strong>and</strong> as per the safety case <strong>of</strong> ETCS/TPWS, integration with the existingTPWS provided in the section <strong>and</strong> final commissioning <strong>of</strong> entire Infill arrangement withthe existing TPWS for traffic use.12.0 EARTHING:Earthing <strong>of</strong> equipment shall be done as per the instructions on Earthing <strong>of</strong> Signaling <strong>and</strong>telecom Equipments in 25 KV 50 HZ AC electrified section as per TPWS/ETCS systemrequirement.13.0 MISCELLANEOUS:13.1 WOOD WORK:Whenever woodwork is involved the wooden planks are to be supplied by the contractor<strong>and</strong> he shall ensure the wood <strong>of</strong> good quality which shall be varnished/painted asspecified. All teak wood boards shall be varnished <strong>and</strong> hard wood shelves should beblack painted.13.2 Wooden cross <strong>of</strong> approved type should be provided for the newly erected colour lightsignals, till they are commissioned.13.3 Wooden board <strong>and</strong> shelves are to be properly polished before fixing the terminals <strong>and</strong>equipments on it, as advised by the Engineer’s representative.13.4 All the equipments, relays <strong>and</strong> terminals are to be marked by lettering on it as advisedby the Engineer’s representative.90


SPECIFICATION FORTRAIN PROTECTION & WARNING SYSTEM (TPWS)Version 2Number <strong>of</strong> Pages 30(& Annexure-I in 2 sheets)Specification No. RDSO/SPN/183/2011SIGNAL DIRECTORATERESEARCH DESIGNS & STANDARDS ORGANISATIONLUCKNOW-226011


DOCUMENT DATA SHEET<strong>Design</strong>ationRDSO/SPN/183/2011Title <strong>of</strong> DocumentSpecification ForTrain Protection & Warning System (TPWS)Version2Authors:A. K. Jain<strong>Design</strong>ation: Executive Director/Signal, RDSOApproved byName: Shri Mahesh Mangal<strong>Design</strong>ation: Sr. Executive Director/Signal,RDSOAbstractThis document defines specification for Train Protection & Warning System (TPWS)


DOCUMENT CONTROL SHEETNAME ORGANISATION FUNCTION LEVELP. K. Bhagch<strong>and</strong>aniRDSO Member PrepareA. K. Jain RDSO Member PrepareSh. Mahesh Mangal RDSO Approving Authority Approve


AMENDMENTSSpecification No. Version Amendment Amendment Effective dateDetailsRDSO/SPN/183/2004 0 - First issue 4/5.3.2004RDSO/SPN/183/2004 0 1 Cl. 6.10 12.4.2004ModifiedRDSO/SPN/183/2004 0 2 Clause 11.0 20.03.2009addedRDSO/SPN/183/2010 1 - Second issue 30.06.2010RDSO/SPN/183/2011 2 - Third issue 18.04.2011


TABLE OF CONTENTS1.0 FOREWORD 62.0 APPLICABLE DOCUMENTS 63.0 TERMINOLOGY 74.0 GENERAL REQUIREMENTS 95.0 FUNCTIONAL REQUIREMENTS 125.1 HEALTHY CONDITION OF SYSTEM 125.2 DATA FROM BALISE 125.3 CALCULATION OF SPEED 125.4 CALCULATION OF SPEED PROFILE 125.5 CALCULATION OF PERMITTED SPEED 125.6 RELEASE SPEED 125.7 DELETED 135.8 MONITORING OF SPEED 135.9 APPLICATION OF EMERGENCY BRAKE WHEN PASSING MANUAL 14STOP SIGNAL AT ON (TRAIN TRIP)5.10 PASSING MANUAL STOP SIGNAL / IB SIGNAL / GATE SIGNAL AT 14ON5.11 PASSING OF SEMI AUTO / AUTO SIGNAL AT ON 155.12 BALISE TRACKING / BALISE LINKING 155.13 BRAKE APPLICATION 165.14 ISOLATION OF TPWS 165.15 MODE 165.16 DATA LOGGING & DIAGNOSTICS 185.17 MULTIPLE TRACTION UNITS 185.18 SPEED RESTRICTIONS 186.0 TECHNICAL REQUIREMENTS 197.0 PERFORMANCE, DOUMENTATION & TRAINING REQUIREMENTS 238.0 ENVIRONMENTAL CONDITIONS 249.0 TESTS & REQUIREMENTS 2510.0 TEST PROCEDURES 2711.0 INFORMATION/ DOCUMENTS TO BE FURNISHED BY THE27MANUFACTURER / SUPPLIER12.0 QUALITY ASSURANCE & WARRANTY 2913.0 PACKING 2914.0 INFORMATION TO BE SUPPLIED BY PURCHASER 29SDMI LAYOUT – ANNEXURE - I (2 Sheets)


1.0 FOREWORD1.1 This specification covers the general, functional, technical <strong>and</strong> performancerequirements <strong>of</strong> Train Protection & Warning System (TPWS) for the Indian Railways.1.2 TPWS will be provided on sections equipped with Multi Aspect Colour Light Signalling<strong>and</strong> train driver will follow Line Side signals as per prevalent operating rules. Provision<strong>of</strong> TPWS will be an additional safety aid to the train driver to prevent consequencesarising out <strong>of</strong> Signal Passing At Danger (SPAD) <strong>and</strong> to control train speed withinspecified limits.1.3 In the event <strong>of</strong> a conflict between this Specification <strong>and</strong> any other st<strong>and</strong>ards orspecifications quoted herein, the requirement <strong>of</strong> this Specification shall prevail.1.4 The operation <strong>of</strong> TPWS will, in no way, infringe/ overrule the rules <strong>of</strong> normal trainoperations on Indian Railways.1.5 This specification supersedes previous versions & amendments <strong>of</strong> specification no.RDSO/SPN/183.2.0 APPLICABLE DOCUMENTS2.1 This specification requires reference to the latest approved documents on ETCS/ERTMS <strong>of</strong> UNISIG, EEIG, UIC, EC <strong>and</strong> EU, together with the following documents –1 EN 50126 Railway Applications- Specifications <strong>and</strong>demonstration <strong>of</strong> Reliability, Availability,Maintainability & Safety.2 EN 50128 Railway Applications-Communications, Signalling<strong>and</strong> processing systems-S<strong>of</strong>tware for RailwayControl <strong>and</strong> Protection Systems.3 EN 50129 Railway Applications-Communications, Signalling<strong>and</strong> processing systems- Safety RelatedElectronics Systems for Signalling.4 EN50159-1 Railway Applications-Communications, Signalling<strong>and</strong> processing systems - Safety relatedcommunication in closed transmission systems.5 EN50159-2 Railway Applications-Communications, Signalling<strong>and</strong> processing systems - Safety relatedcommunication in open transmission systems.6 EN 50121 Railway Applications - Electromagneticcompatibility (EMC)7 EEIG: 97s066 ERTMS/ETCS Environmental requirements8 IEC 60571 Electronic Equipment Used on Rail Vehicles9 IEC 61373 Railway Applications – Rolling stock equipment –Shock <strong>and</strong> vibration tests10 ELRS/SPEC/SI/0015 Reliability <strong>of</strong> electronics used in rolling stockapplication11 RDSO/SPN/144 Safety <strong>and</strong> reliability requirement <strong>of</strong> electronicsignalling equipment.12 IRS: S 36 Relay Interlocking systems.13 IRS: S 23 Electrical Signalling <strong>and</strong> Interlocking Equipment14 RDSO/SPN/192 Electronic Interlocking


2.2 Wherever in this specification, any <strong>of</strong> the above mentioned specifications are referred,the latest version/ issue <strong>of</strong> the same is implied.3.0 TERMINOLGY3.1 List <strong>of</strong> abbreviations:Abbreviation Full Form/ DescriptionACAlternating currentBTMBalise Transmission ModuleCENELEC European Committee for ElectrotechnicalSt<strong>and</strong>ardizationDCDirect CurrentDEMU Diesel-Electric Multiple UnitDMIDriver Machine InterfaceECEuropean CommissionECRLamp Checking RelayEEIG European Economic Interest GroupEMU Electrical Multiple UnitEOAEnd Of AuthorityEPROM Electrically Programmable Read Only MemoryERTMS European Rail Traffic Management SystemETCS European Train Control SystemFRSFunctional Requirement SpecificationG&SR General & Subsidiary RulesJRUJuridical Recording UnitIB Signal Intermediate Block SignalIECInternational Electrotechnical CommissionKmph Kilometers Per HourLEULine side Electronic UnitMEMU Mainline Electrical Multiple UnitMTBF Mean Time Between FailuresMTBSF Mean Time Between Service FailureMTBWSF Mean Time Between Wrong Side FailuresOBC On Board ComputerRAM R<strong>and</strong>om Access MemoryRAMS Reliability, Availability, Maintainability & SafetyRDSO Research <strong>Design</strong>s & St<strong>and</strong>ards OrganisationRERailway ElectrificationROM Read Only MemoryRSRelease SpeedSILSafety Integrity LevelAbbreviation Full Form/ DescriptionSDMI Simplified Driver Machine Interface


SPADSRSTIUTPWSUICUNISIGSignal Passing at DangerSystem Requirements SpecificationTrain Interface UnitTrain Protection & Warning SystemInternational Union <strong>of</strong> RailwaysEuropean Signalling Industries3.2 For the purpose <strong>of</strong> this specification, the terminology given in ERTMS/ ETCS latestFRS & SRS shall apply.3.3 Definitions:3.3.1 Acceptance Tests: Tests carried out on the equipment/ system for the purpose <strong>of</strong>acceptance <strong>of</strong> the equipment/ system.3.3.2 Cross Approval: A process <strong>of</strong> approval <strong>of</strong> foreign firms for their provenproducts/ systems through their Indian counter parts or supplier.3.3.3 Driving Cab: The cab where controls etc. are provided for the Driver to runthe locomotive/ train.3.3.4 Driving Position: The position in the locomotive from where driver runs thelocomotive/ train. Electric locomotives, some diesel locomotives, EMU, MEMU,DEMU etc. have separate driving cabs for either direction driving <strong>and</strong> thereforehave one driving position in each cab. However, most diesel locomotives haveonly one cab having two driving positions i.e. one for each direction driving.3.3.5 Dynamic speed pr<strong>of</strong>ile: The speed-distance curve which a train may followwithout violating the static train speed pr<strong>of</strong>ile <strong>and</strong> the end <strong>of</strong> movementauthority. This curve depends on the braking characteristics <strong>of</strong> the train <strong>and</strong>the train length.3.3.6 End <strong>of</strong> Authority (EOA): Location to which the train is permitted to proceed<strong>and</strong> where target speed is zero.3.3.7 ETCS/ ERTMS Level-2: ETCS/ ERTMS conforming to Level-2 operation.3.3.8 Functional Acceptance Tests: Tests carried out by installing someequipments in the field to prove that the system performs in accordance withthis specification & the local configuration data is acceptable.3.3.9 Locomotive: The word ‘locomotive’ wherever used in this specification shallalso mean the driving cab <strong>of</strong> EMU, MEMU, DEMU or any other self propelledvehicle running on Indian Railways.3.3.10 MTBSF: Mean Time between such failures which require restart/maintenance/ repair <strong>of</strong> system.3.3.11 National Values: These values are the values <strong>of</strong> different parameters such asmaximum permitted speed, speed in shunting mode, speed in OS mode,overlap distance, permitted roll away/ reverse movement distance etc. whichare based on rules <strong>of</strong> train operation.3.3.12 ‘Off’ aspect <strong>of</strong> a Signal: Any aspect other than ‘On’ aspect <strong>of</strong> a signal.3.3.13 ‘On’ aspect <strong>of</strong> a Signal: It is the most restrictive aspect <strong>of</strong> the signal. In case<strong>of</strong> stop signal, Red (or Danger) aspect is the ‘On’ aspect.3.3.14 Overlap Distance: The length <strong>of</strong> track in advance <strong>of</strong> a stop signal, which mustbe kept clear, either for clearing the stop signal next in rear or for the purpose


<strong>of</strong> granting permission to approach. The overlap distance may be different fordifferent types <strong>of</strong> signals & signalling.3.3.15 Routine Tests: Tests carried out on the equipment/ system by themanufacturer before <strong>of</strong>fering for inspection.3.3.16 Schedule <strong>of</strong> Dimensions (SOD): Indian Railways Schedule <strong>of</strong> Dimensions.SOD can be purchased from IR.3.3.17 Static speed pr<strong>of</strong>ile: The Static Speed Pr<strong>of</strong>ile (SSP) is a description <strong>of</strong> thefixed speed restrictions for a part <strong>of</strong> track sent from track to train.3.3.18 Type Tests: Tests carried out to prove conformity with the specification.These are intended to prove the general qualities <strong>and</strong> design <strong>of</strong> theequipment/ system.4.0 GENERAL REQUIREMENTS4.1 Unless otherwise specified in this specification, TPWS covered in this specificationshall generally conform to latest approved FRS & SRS issued for ETCS/ ERTMSLevel-1. It shall work on the principle <strong>of</strong> target distance <strong>and</strong> target speed. The TPWSshall consist <strong>of</strong> following:i) Track side system comprising <strong>of</strong>a. Balises:• Switchable balises – This balises are interfaced to signal aspect throughLEU. The telegrams/ data transmitted by these balises depend on the aspect<strong>of</strong> the signal. These are provided at a location near the signal. ThePermanent Speed Restriction & track topography related information is alsotransmitted by these balises within the telegram/data related with signalaspect.• Infill balises – These balises are also interfaced to signal through LEU. Thetelegrams/ data transmitted by these balises depend on the aspect <strong>of</strong> thesignal. These are provided in advance <strong>of</strong> the signal to update the movementauthority in advance. These balises cannot effect change <strong>of</strong> mode <strong>of</strong> Onboard system.• Fixed balises – These balises are provided wherever required. Thesebalises transmit fixed telegrams/ data only. These can be used for enforcingTemporary speed restriction etc.• Repositioning data balises – These balises are provided whereverrequired to correct the previously given information.b. Line side electronic unit (LEU), its power supply & interfacing system with signallingc. Communication link (data cable) between the LEU & the baliseii) On board system comprising <strong>of</strong>a. On Board Computer (OBC)b. Juridical Recorder Unit (JRU) for data logging for investigation (Optional).c. Data logger for diagnostics (either part <strong>of</strong> OBC or separate)d. Drivers’ indication-cum-control panel (SDMI or DMI), indications & <strong>and</strong> audioalarms.e. Balise Transmission Module (BTM)f. Balise antenna fixed to the under frame


g. Speed <strong>and</strong> distance measurement unith. Train Interface Unit (TIU)i. Interface to existing brake control system which in turn controls application <strong>of</strong>service/ emergency brakes or interface to existing brake system directly.j. Power supply arrangementk. System Isolating Unit (Both Electrical & Mechanical)4.2 The system shall be capable <strong>of</strong> working satisfactorily up to speeds <strong>of</strong> 250 Kmph. Themanufacturer shall mention the maximum speed up to which their system shall worksatisfactorily.4.3 The On board equipment <strong>of</strong> TPWS shall work on the DC power supply available in thelocomotive.4.4 The track side system <strong>of</strong> the TPWS shall work on DC power supply & shall havebattery backup.4.5 TPWS shall be universally suitable for all types <strong>of</strong> sections <strong>of</strong> Indian Railways e.g.Sections/ Stations equipped with Relay interlocking, Electronic interlocking, MultiaspectColour Light Signalling, Automatic Signalling, Intermediate Block SignallingSections.4.6 TPWS shall be suitable for all types <strong>of</strong> EMUs, MEMUs, DMUs, electric <strong>and</strong> diesellocomotives, Distributed Power wireless control <strong>of</strong> locomotive (Locotrol), including alltypes <strong>of</strong> microprocessor based locomotives, running on Indian Railways.4.7 TPWS shall be capable <strong>of</strong> being correctly & effectively interfaced to existingAir/Vacuum/Dual/Electro-pneumatic brake system <strong>of</strong> Diesel <strong>and</strong> Electric Locomotivesas well as other self propelled vehicles treated as train.4.8 TPWS shall be capable <strong>of</strong> working in all electrified as well as non electrified territories.It shall be suitable for use on AC/DC EMUs/DMUs/MEMUs/single or multi-headedelectric/diesel locomotives.4.9 The system shall be suitable for single, double or multiple line sections on Suburban/Non-suburban section.4.10 TPWS shall be capable <strong>of</strong> functioning in 25 KV AC RE, 1500V DC RE, 750V DC REareas as well as in DC/AC RE areas where some lines may be working on AC REwhile other lines on DC RE.4.11 The track side <strong>and</strong> on-board equipment shall not in any way infringe the schedule <strong>of</strong>dimensions being followed by the Indian Railways.4.12 TPWS shall have two levels <strong>of</strong> brake comm<strong>and</strong>si Service brake comm<strong>and</strong>ii Emergency brake comm<strong>and</strong>4.13 The brake comm<strong>and</strong>s generated by the TPWS shall be used for application <strong>of</strong> service& emergency brakes <strong>of</strong> locomotives.4.14 Deleted.4.15 Deleted.4.16 The fixing arrangement <strong>of</strong> the balise on the sleeper shall be such that it does notrequire any drilling <strong>and</strong> does not cause any damage to the sleeper. The routing/fixingarrangement <strong>of</strong> its cable normally shall not restrict the use <strong>of</strong> track maintenancemachines. However, if required, the manufacturer/ supplier shall specify the


precautions needs to be taken by the Purchaser during use <strong>of</strong> track maintenancemachine.4.17 The TPWS track-side system shall interface with the signalling system without affectingnormal working & safety <strong>of</strong> signalling system. It shall take input regarding signal aspectthrough potential free contacts <strong>of</strong> the Lamp Checking Relays (ECRs).4.18 Deleted.4.19 The TPWS shall conform to the Safety Integrity Level (SIL) 4 as per CENELECst<strong>and</strong>ards or equivalent.4.20 The system shall be compatible & interoperable with the existing TPWS on IndianRailways. The manufacturer shall also submit certificate mentioning the systemsworking on world railways with which their system is interoperable. The certificate shallinclude systems <strong>of</strong> those manufacturers also whose TPWS are already working on IR.4.21 (i) The size <strong>of</strong> the entire on-board equipment (excluding SDMI/DMI) which is to beprovided inside locomotive’s machine room shall not be more than 1350 x 560 x550 mm (Height x width x depth). The SDMI/DMI to be provided in Driver’s cabshall not exceed in size by 360mm x 450mm x 150mm (Height x width x depth).(ii) Suppliers shall specify the number <strong>of</strong> sub-systems in which their On-board systemcan be split. Supplier shall also submit sizes <strong>of</strong> such sub-systems.(iii) There is severe constraint <strong>of</strong> space in the locomotives <strong>and</strong> therefore theequipment shall be compact & modular in design with possibility <strong>of</strong> distributing itinto sub-systems to facilitate its accommodation in the locomotive.(iv) The supplier/manufacturer in consultation with the purchaser shall identify space inthe locomotive for installation <strong>of</strong> on-board equipment <strong>of</strong> TPWS. The installation <strong>of</strong>on-board equipment <strong>of</strong> TPWS in space so identified shall not affect the access tothe loco equipments for maintenance/ operation purpose. The supplier/manufacturer shall obtain RDSO approval for space so identified for fitment <strong>of</strong> onboardequipment <strong>of</strong> TPWS prior to manufacture/supply.4.22 The programming/ feeding <strong>of</strong> data to track side or On board equipment shall besuitably protected against unauthorised use.4.23 The on board system shall be upgradeable to ETCS/ ERTMS level-2 with additionalhardware & changes in the s<strong>of</strong>tware. The supplier shall give details <strong>of</strong> such additionalhardware & changes in the s<strong>of</strong>tware.5.0 FUNCTIONAL REQUIREMENTS5.1 Healthy condition <strong>of</strong> system: A steady lit green light indicating that TPWS is inworking condition shall be available in the cab or on the driver’s indication -cum -control panel. This TPWS healthy indication light shall extinguish when any fault isdetected by TPWS <strong>and</strong> immediately “TPWS faulty” red light shall be lit <strong>and</strong> audiblealarm shall sound to attract attention <strong>of</strong> driver (which shall stop on acknowledgementby the driver). In such case, Emergency brake shall be applied by the TPWS <strong>and</strong> thetrain shall be able to move only after the TPWS is isolated. However, the “TPWSfaulty” red light shall remain lit till such time fault persists.5.2 Data from balise: TPWS on board equipment shall act on the data it receives when itpasses over a balise. This data shall consist <strong>of</strong> information on movement authority,balise linking distances, topography <strong>of</strong> track section ahead, mode pr<strong>of</strong>ile, speedrestrictions related information, release speed etc.


5.3 Calculation <strong>of</strong> Speed: The system shall incorporate the necessary hardware <strong>and</strong>s<strong>of</strong>tware module for accurate calculation <strong>of</strong> the train speed duly accounting for wheelslip/skid corrections. Manufacturer shall submit the details <strong>of</strong> the speed calculationmodule along with the supporting international st<strong>and</strong>ards/practices being followedworld over for the same. Calculation <strong>of</strong> speed shall be with an accuracy <strong>of</strong> ±2% subjectto maximum <strong>of</strong> ±2 kmph. Further, the variation in wheel diameter due to normal wearduring time period between two loco maintenance schedules shall not affect accuracybeyond the limits specified in this clause.5.4 Calculation <strong>of</strong> speed pr<strong>of</strong>ile: On board computer shall calculate the static & dynamicspeed pr<strong>of</strong>ile for the track section ahead based on data received from balise <strong>and</strong> dataavailable on board <strong>of</strong> the train characteristics.5.5 Calculation <strong>of</strong> permitted speed: Based on all relevant data (available on board & asreceived from balise), the TPWS shall calculate permitted speed, warning speed, aservice braking curve <strong>and</strong> an emergency braking curve for the train for all locations onthe section.5.6 Release speed:5.6.1 A release speed shall be calculated on-board to allow the train to approach the target(i.e. stop signal at ON) with such speed so as to ensure that the train stops beforereaching the danger point (overlap distance beyond the stop signal at ON) uptowhich train movement is considered safe, based on data received. The releasespeed shall be calculated on board based on safety distance including signal overlap,deceleration performance <strong>of</strong> the train & any other relevant considerations.5.6.2 The release speed shall be programmed as a fixed value & transmitted to on-boardequipment via the track side equipment. The release speed shall be based on theaspect <strong>of</strong> the signal, route <strong>of</strong> the train (main line or turnout route) on which it is goingto travel, gradient ahead & any other relevant considerations.5.6.3 Purchaser may decide to use any <strong>of</strong> the arrangement mentioned in 5.6.1 or 5.6.2depending upon the requirement. However, the value <strong>of</strong> release speed, in any case,should always be such that even in worst conditions, it is possible to stop the trainwithin the signal overlap distance on application <strong>of</strong> emergency brakes by the TPWS iftrain passes the signal at Danger at or below the release speed.5.7 Deleted.5.8 Monitoring <strong>of</strong> speed:5.8.1 TPWS shall continuously compare the current speed <strong>of</strong> train with the permitted speedat all locations in all those modes in which speed monitoring is required. However, incase <strong>of</strong> release speed monitoring, clause 5.8.2 shall apply. A warning must begiven to the driver to enable him to react <strong>and</strong> avoid intervention from TPWS beforethe application <strong>of</strong> service brake. The following actions shall be taken by TPWSdepending upon the difference in current train speed & permitted speed:


SN Current trainspeedWarning tothe Driverexceeds thespeedpermitted atthe moment,by1. Upto 5 kmph Intermittentaudio &visualwarningswhich willbe stoppedonce trainspeed isreduced topermittedspeed.2. Above 5 kmph& upto 10kmph3. Above 10kmphContinuousaudio &visualwarnings.Continuousaudio &visualwarningsComm<strong>and</strong>for tractioncut-<strong>of</strong>fBraking/Comm<strong>and</strong>BrakeNo No NoYesYesEventloggingService brake is Yesapplied by theTPWS. Theservice brakecomm<strong>and</strong> will bewithdrawn onlywhen the currenttrain speed isreduced to orbelow thepermitted speed.Emergency brake Yesis applied by theTPWS. There shallbe following twoprogrammableoptions for release<strong>of</strong> emergencybrake(a) When thecurrent trainspeed isreduced to orbelow thepermittedspeed.(b) When traincomes to ahalt.Purchaser shallprogram one <strong>of</strong>the above optionsas per requirement


The system shall have provision <strong>of</strong> configuring the speed limits/ slabs as mentionedin column 2 <strong>of</strong> the above table, by the purchaser. However, these speed limits shallbe in multiples <strong>of</strong> 5 KMPH or less.5.8.2 Monitoring <strong>of</strong> Release speed: The Release Speed (RS) monitoring applies to thesection near the EOA, where the speed is monitored against a constant value, theRelease Speed. If the current train speed exceeds the Release Speed, emergencybrake is applied by the TPWS & the train is brought to a halt. It shall be possible torelease the emergency brake only after train stops.5.9 Application <strong>of</strong> Emergency brake when passing Manual Stop Signal/ IB Signal/Gate Signal at ON (Train Trip): When Manual Stop Signal without calling on signal/Manual Stop Signal with calling on signal at ON/ IB Signal/ Gate Signal is passed atON, TPWS shall apply emergency brake irrespective <strong>of</strong> the speed <strong>of</strong> train & will bringtrain to a halt. It shall be possible to release the emergency brake only afteracknowledgement by the driver after the train has stopped. The events <strong>of</strong> such brakeapplication & the acknowledgement shall be logged. It shall be possible to overrideTrain Trip function when passing such signals at ON as described in para 5.10.15.10 Passing <strong>of</strong> Manual Stop Signal/ IB Signal/ Gate Signal at ON:5.10.1 The TPWS equipment shall have provision to enable passing <strong>of</strong> a manual stopsignal (without calling on signal)/ IB Signal/ Gate Signal at ON by carrying out EOAoverride operation on the SDMI/DMI. The EOA override operation shall be done bythe driver after following the procedure as prescribed in relevant paras <strong>of</strong> G&SR forpassing such signals at ON. This override operation shall be possible only after thetrain has come to a stop. The override control must be protected against inadvertentoperation. This action shall be logged by the system.5.10.2 If Manual Stop Signal is at ON but its calling on signal is OFF, the system shallpermit passing <strong>of</strong> such signal without EOA override operation. However, on passingsuch signal, a visual indication shall be lit up on the SDMI/DMI & TPWS shallrequest for an acknowledgement from the driver. If driver doesn’t acknowledgewithin 5 secs, the service brake shall be applied till driver acknowledges. However, ifwhile passing such signal, the speed <strong>of</strong> the train is more than the speed configuredin the system to be followed after passing such signal then brake shall beimmediately applied to bring the speed to the restricted speed configured in thesystem, without waiting for driver’s acknowledgement. The indication shall remain litup until the train passes the switchable/ signal balise (not the in-fill balise) connectedto next signal ahead. This indication reminds the driver that he should proceedahead cautiously at the specified restricted speed as per G&SR. The driver shallpass such signals at ON after following the procedure as prescribed in relevantparas <strong>of</strong> G&SR & follow the restricted speed as defined in G&SR. In case the trainspeed exceeds the restricted speed configured in the system, TPWS shall takeaction as described in para 5.8.1 above. Provision should be made in the system toenable changes in the configured restricted speed limit to any value (which can be inmultiples <strong>of</strong> 5 KMPH) at a later date to comply with the changes in Operating Rules<strong>of</strong> the Indian Railways.5.11 Passing <strong>of</strong> Semi auto/ auto signal at ON: In automatic signalling territory, when theautomatic signal with “A” marker plate or the semi-automatic signal with illuminated “A”marker light displaying ON aspect is passed, a visual indication shall be lit up on theSDMI/DMI & TPWS shall request for an acknowledgement from the driver. If driverdoesn’t acknowledge within 5 secs, the service brake shall be applied till driver


acknowledges. However, if while passing such signal, the speed <strong>of</strong> the train is morethan the speed configured in the system to be followed after passing such signal thenbrake shall be immediately applied to bring the speed to the restricted speedconfigured in the system, without waiting for driver’s acknowledgement. The indicationshall remain lit up until the train passes the switchable/ signal balise (not the in-fillbalise) connected to next signal ahead. This indication reminds the driver that heshould proceed ahead cautiously at specified restricted speed as per G&SR. Thedriver shall pass such signals at ON after following the procedure as prescribed inrelevant paras <strong>of</strong> G&SR & follow the restricted speed as defined in G&SR. In case thetrain speed exceeds the restricted speed configured in the system, TPWS shall takeaction as described in para 5.8.1 above. Provision should be made in the system toenable changes in the configured restricted speed limit to any value (which can be inmultiples <strong>of</strong> 5 KMPH) at a later date to comply with the changes in Operating Rules <strong>of</strong>the Indian Railways.5.12 Balise Tracking / Balise Linking: The TPWS equipment shall be capable <strong>of</strong>identifying missing balise <strong>and</strong> give suitable audio & visual indication to driveraccordingly. This event shall be logged by the system. The System shall be capable <strong>of</strong>taking following actions under such condition:(a) Apply service brake to bring the train to a halt;(b) Apply emergency brakes to bring the train to a halt.Purchaser shall be able to program one <strong>of</strong> the actions as mentioned in (a) & (b) above,to be taken by the system in case <strong>of</strong> missing balise.5.13 Brake application:5.13.1 The system shall generate service & emergency brake comm<strong>and</strong>s according to thesituation <strong>and</strong> apply respective brakes <strong>of</strong> locomotives in one <strong>of</strong> the following manners:5.13.1.1 On the locomotives not provided with electronic/ microprocessor controlled brakesystem, the brake comm<strong>and</strong>s <strong>of</strong> TPWS shall be interfaced to the existing brakesystem <strong>of</strong> the locomotive either pneumatically or electrically (like in EMU/ MEMUetc.) <strong>and</strong> shall apply the corresponding brakes.5.13.1.2 On the locomotives provided with electronic/ microprocessor controlled brakesystem, the brake comm<strong>and</strong>s <strong>of</strong> TPWS, through an electronic/ electrical interface,shall be given to the existing brake control system <strong>of</strong> locomotive <strong>and</strong> based onthese comm<strong>and</strong>s given by the TPWS, the existing brake control system shallapply the corresponding brakes.5.13.2 However, in all cases, the driver shall be able to apply brakes as normal over &above TPWS control. If so required, the driver should be in a position to apply moreintense brakes through his normal brake control system when application <strong>of</strong> brake byTPWS is not upto the level <strong>of</strong> emergency brake. The brake interface shall not resultin change <strong>of</strong> existing brake characteristic <strong>of</strong> the locomotive/ train. The brakecomm<strong>and</strong>s generated by the TPWS shall also cut-<strong>of</strong>f traction to the locomotive.5.13.3 Deleted.5.13.4 A non-resettable type electro-mechanical counter shall be provided to record in theform <strong>of</strong> counter reading, the instances <strong>of</strong> application <strong>of</strong> emergency brake <strong>and</strong> thisrecord shall not be affected by interruption <strong>of</strong> power supply to the system.Acknowledgement from Driver is required for releasing the emergency brake in case<strong>of</strong> Emergency brake application due to Train Trip (Clause 5.9).


5.13.5 It shall not be possible to mute the warning <strong>and</strong> to stop automatic brake applicationsby prior operation <strong>of</strong> reset button on the panel.5.13.6 It shall not be possible to cancel the brake application by interrupting the powersupply to the system.5.14 Isolation <strong>of</strong> TPWS: On board system shall have provision for isolation to cater forfailure situation which shall result in disconnection <strong>of</strong> the system from the locomotivebraking system. This shall be indicated to the driver by means <strong>of</strong> a visual indicationwhich shall be available even if SDMI/DMI has failed. To avoid accidental/ unwarranteduse, the isolation arrangement <strong>of</strong> the equipment must be protected <strong>and</strong> sealed.Isolation <strong>of</strong> system must be recorded by the system as well as recorded in a nonresettableveeder counter.5.15 Modes: The current mode <strong>of</strong> TPWS on-board equipments shall be indicated to thedriver by means <strong>of</strong> suitable indications on the SDMI/DMI. The various modes <strong>and</strong> theirdescriptions shall be as per ETCS/ ERTMS FRS/SRS. However it shall be possible toprogramme on board equipment to block one or more modes, if required under therules for train operations. Brief description <strong>of</strong> mode is given below:5.15.1 Isolation-This mode is entered by the TPWS on-board equipment when Isolationswitch is operated by the driver to isolate from the on-board system physically fromthe brakes. In this mode, TPWS on-board equipment has no role/ responsibility for itsfunctionality. However, under this mode TPWS shall not affect the normal working <strong>of</strong>locomotive including its brake system.5.15.2 No Power-This mode is entered by the TPWS on-board equipment when it is notpowered. In this mode the TPWS on-board equipment has no responsibility exceptcomm<strong>and</strong>ing the emergency brake.5.15.3 System Failure- The TPWS on-board equipment shall switch to the System Failuremode, in case <strong>of</strong> a fault, which affects safety <strong>and</strong> shall permanently comm<strong>and</strong> theEmergency Brake.5.15.4 Sleeping-In this mode, the TPWS on-board equipment <strong>of</strong> a slave engine is remotelycontrolled by the leading engine.5.15.5 St<strong>and</strong> By-In this mode, TPWS on-board equipment shall perform its self-test <strong>and</strong> thetest <strong>of</strong> the external devices. Results <strong>of</strong> tests shall be displayed to the driver by means <strong>of</strong>suitable indications on the SDMI/DMI.5.15.6 Shunting-In this mode, the TPWS on-board equipment supervises the train movementsagainst the shunting mode permitted speed limit.5.15.7 Full Supervision-When all train <strong>and</strong> track data, which is required for a completesupervision <strong>of</strong> the train, is available on board, the system shall be in Full Supervisionmode. In this mode, the TPWS on-board equipment shall display the train speed, thepermitted speed, the target distance <strong>and</strong> the target speed to the driver (this list is notexhaustive).5.15.8 Unfitted- In this mode, Train movement is allowed in the sections not equipped withTPWS track side equipment5.15.9 Staff Responsible-This mode allows the driver to move the train under his ownresponsibility in a TPWS equipped area under certain situations e.g., after the TPWSon-board equipment starts up, to pass a signal at danger etc.


5.15.10 On Sight- This mode enables the train to enter into a track section that could bealready occupied by another train, or obstructed by any kind <strong>of</strong> obstacle. Theauthority to use this mode shall come from track-side only (this mode cannot beselected by the driver).5.15.11 Trip-The TPWS on-board equipment enters into this mode when train passes manualstop signal at ON without following the procedure as described in 5.10, in this mode,emergency brake shall be applied to stop the train.5.15.12 Post Trip- This mode shall be entered after TRIP (refer 5.15.11) is acknowledged bythe driver.5.15.13 Non Leading- This mode is selected by the driver <strong>of</strong> non leading/ slave engine on hisTPWS on-board equipment that is not electrically coupled to the leading engine (<strong>and</strong>so, not remote controlled).5.15.14 Reversing- In this mode, the driver is permitted to change the direction <strong>of</strong> movement<strong>of</strong> the train <strong>and</strong> drive from the same cab. This mode shall be permitted by trackside.5.16 Data Logging & Diagnostics:5.16.1 System shall be provided with data logging for diagnostic functions. The data can beaccessed through PC/ laptop <strong>and</strong> a st<strong>and</strong>ard interface <strong>of</strong> on-board system . Memorycapacity <strong>of</strong> system shall be sufficient to keep log <strong>of</strong> minimum last one-week trainrunning data. The memory shall keep log on First-In-First-Out basis.5.16.2 Diagnostic/Analytical s<strong>of</strong>tware will be provided to analyse the events logged in LogFile. Diagnostic s<strong>of</strong>tware shall perform following minimum functions:a) it shall be possible to download data <strong>of</strong> logged events <strong>and</strong> selectively sort thisdata regarding emergency brake application, service brake application, speedovershoots <strong>of</strong> more than 5 kmph than permitted speed, missing balise, defectivetelegram, passing <strong>of</strong> manual stop signal at ON, train trip etc. Every recordedevent shall be with real date <strong>and</strong> time stamp <strong>of</strong> OBC/ JRU <strong>and</strong> the balise ID.b) it shall be possible to download data <strong>of</strong> failures <strong>of</strong> sub-systems .c) it shall be possible to download <strong>and</strong> display different Balise telegrams <strong>and</strong>parameters <strong>of</strong> vehicle data.d) The downloaded log shall be in st<strong>and</strong>ard file format like text, html, excel etc.5.16.3 The track-side equipment shall have data logging arrangement for diagnostics. Thedata can be accessed through st<strong>and</strong>ard interface to the PC/ Laptop.5.16.4 S<strong>of</strong>tware shall be provided to download data from JRU through st<strong>and</strong>ard interface toPC/ laptop for investigation purpose.5.16.5 JRU shall conform to the latest specification issued by UIC/ UNISIG.5.17 Multiple traction units: It shall be possible to use TPWS in multiple traction units bykeeping the mode <strong>of</strong> on board system <strong>of</strong> other than leading unit in sleep or non-leadingor isolation mode.5.18 Speed Restrictions:5.18.1 It shall be possible to enforce Permanent Speed Restrictions (PSR) by feeding theinformation through switchable balises.5.18.2 It shall be possible to enforce temporary speed restrictions by installing additionalfixed balises on track.


5.19 Interoperability: The On Board system <strong>of</strong> a manufacturer shall be compatible &interoperable with Balise <strong>of</strong> another manufacturer & vice versa. Similarly, Balise <strong>and</strong>LEU <strong>of</strong> different manufacturers shall be interoperable with each other.6.0 TECHNICAL REQUIREMENTSGeneral:6.1 The design <strong>of</strong> the system shall be robust <strong>and</strong> <strong>of</strong> state-<strong>of</strong>-art technology. The designshall be modular up to card level for ease <strong>of</strong> maintenance <strong>and</strong> fault troubleshooting.6.2 All the cards shall be suitably protected <strong>and</strong> enclosed to avoid dust ingress. Suitablehousing/cabinet shall be provided to withst<strong>and</strong> shocks, vibrations, electromagneticinduction <strong>and</strong> electrical surges etc.6.3 The equipment shall be so constructed as to prevent unauthorised access to thesystem both at track side <strong>and</strong> on board.6.4 All equipments shall be provided with easily accessible test points to facilitate faultlocalisation. Provision shall be made for isolating functional areas with each module toassist with testing <strong>and</strong> fault localisation.6.5 Application s<strong>of</strong>tware <strong>of</strong> on board & Trackside / Line side equipments shall have userfriendlydesign tools to enable carrying out <strong>of</strong> configuration changes by the Railways.Immunity to Interference/EMI/EMC/Surge/Transients etc.:6.6 The on board as well track side systems <strong>of</strong> TPWS shall be immune to followinginterference currents generated by locomotive/EMU etc.SN Interference Current Overall Limit1. Psophometric current AC traction 10.0A2. Psophometric current DC traction 2.0A3. DC Component in AC mode 4.7A4. Second Harmonic Component(100 Hz) in AC 8.5Atraction5. 1400Hz to 5000 Hz 400mA6. More than 5000Hz upto 50000 Hz 270mA7. 50 Hz component in DC mode 2.4AThe track side system shall be immune to electro-magnetic interference generated bythyristor/chopper-controlled locomotives, traction return currents.6.7 Electromagnetic compatibility <strong>of</strong> the entire On-board equipment as well as track sideequipments including interlinking cables shall comply with European St<strong>and</strong>ards EN50121 for Railway Applications – Electromagnetic Compatibility, as applicable <strong>and</strong> onboardequipment shall also comply with EN50238 for Railway Applications –Compatibility between rolling stock & train detection system. Adequate provisionsshould be made in the design for suppression <strong>of</strong> internal transients, spikes <strong>and</strong> towithst<strong>and</strong> external transients, spikes <strong>and</strong> surges as per limits laid down in IEC-60571.6.8 The track-side system shall be Electro Magnetically Compatible to work in conjunctionwith the relay based interlocking, electronic interlocking, field signalling equipment,signalling cables <strong>and</strong> power supply arrangements as laid down in specification IRS: S36 & IRS: S23.


6.9 The manufacturer shall acquaint themselves with the control system <strong>of</strong> EMUs <strong>and</strong> shallcarry out the EMI/EMC measurement before finalizing the scheme for on board fitment.6.10 Surge suppresser <strong>and</strong> proper earthing arrangement shall be provided in power supplysystem <strong>of</strong> On board as well as track side systems to protect against transient voltages,lightning <strong>and</strong> spikes etc. as per site/ local requirements in addition to their complianceto Clause 6.7.On-Board System:6.11 The On Board Computer (OBC) shall be capable <strong>of</strong> being connected to driver’sSDMI/DMI provided in each cab/ each driving position (where there is only one cab inthe locomotive having two driving positions) <strong>of</strong> the locomotive. It shall be interfacedwith Driver Control Switch so that at a time only one SDMI/DMI is active & other getslocked. On EMU/MEMU/DMU, OBCs with individual driver’s SDMI/DMI shall beprovided in each <strong>of</strong> the driving cabs. The train characteristics, wheel diameter etc. shallbe loadable into OBC through the respective ports on the OBC module using specials<strong>of</strong>tware tool.6.12 The On board equipment shall work on the DC power supply available in thelocomotive (which is normally 72V DC in Diesel locomotives & 110V DC in Electriclocomotives/EMU/MEMU, with a variation <strong>of</strong> -30% / +20% over nominal voltage <strong>and</strong> aripple factor <strong>of</strong> upto 15%) as input & shall derive other voltages required for theworking <strong>of</strong> its sub-systems.6.13 The balise antenna <strong>of</strong> on board system shall be so located <strong>and</strong> mounted on theappropriate part <strong>of</strong> the locomotive relative to centre <strong>of</strong> the track that it would functioncorrectly over the Indian Railways’ limits <strong>of</strong> transverse <strong>and</strong> vertical movement.Mounting arrangement <strong>of</strong> antenna shall be secured against severe vibrations.6.14 Whenever an OBC is replaced, the normal operation shall be possible only whencomplete vehicle data has been re-entered.6.15 It shall be possible to program various parameters in on board computer required forits functioning via diagnostic PC. The data for example, may include date, time, wheeldiameter, number <strong>of</strong> impulses per wheel revolution, emergency braking decelerationrate, maximum train speed etc.6.16 Fail safe relay shall be used for performing emergency brake operation. The status <strong>of</strong>this relay shall be continuously monitored & any change in the status shall be loggedwith date & time. The arrangement shall be such that failure <strong>of</strong> relay or its associatedwiring shall be on safer side i.e. system shall apply EB in such failures.6.17 The manufacturer/ supplier shall submit the maximum power drawn by the On boardsystem which shall not exceed 350 watts.6.18 Driver’s indication-cum-control panel:Each driving cab/ each driving position (where there is only one cab in the locomotivehaving two driving positions) shall be provided with Driver’s interface to TPWS. It shallconsist <strong>of</strong>:6.18.1 One <strong>of</strong> the following types <strong>of</strong> Driver’s indication-cum-control panel as indicated by thepurchaser:6.18.1.1 Simplified Drivers’ Machine Interface (SDMI), which shall be user friendly, easy tooperate, shall be as per layout drawing no. Annexure-I & shall have at leastfollowings:(i) Audio warning & visual indications for warning over speed, Service &Emergency Brake applications. For audio alarms, volume control shall be


provided with fixed minimum level so that alarm is audible even at minimumsetting <strong>of</strong> volume control.(ii) Backlit alphanumeric LCD display <strong>of</strong> two lines, each having minimum 16characters, for displaying <strong>of</strong> real date & time <strong>and</strong> contextual information. Thecharacter size shall be <strong>of</strong> 5x8 pixels. The pixel size shall not be less than0.55mm x 0.65 mm.(iii) Display <strong>of</strong> current mode <strong>of</strong> the system, current speed <strong>of</strong> the locomotive,target distance, target speed <strong>and</strong> release speed, when necessary.(iv) Suitable switches/ buttons for the driver to carry out required operations likeStart-up, change <strong>of</strong> mode, alarm resetting, acknowledgement, over-rideoperation etc.(v) Any other indications, buttons <strong>and</strong> switches as necessary for the operation <strong>of</strong>the system & to meet requirement <strong>of</strong> this specification.(vi) Where required by the purchaser, an atleast 8 position switch to select theconfiguration <strong>of</strong> different train characteristics predefined based on maximumpermissible speed, train load, brake characteristics & any other relevantconsiderations.6.18.1.2 CENELEC st<strong>and</strong>ard Drivers’ Machine Interface (DMI), which shall be userfriendly, easy to operate, shall be as per UIC/UNISIG specifications & shall haveat least followings:(i) Audio warning & visual indications for warning over speed, Service &Emergency Brake applications.(ii) Display <strong>of</strong> current mode <strong>of</strong> the system, current speed <strong>of</strong> the locomotive,target distance, target speed <strong>and</strong> release speed, when necessary, selectedset <strong>of</strong> train characteristics.(iii) Selection menu for the driver to carry out required operations like Start-up,Selection/change <strong>of</strong> mode, alarm resetting, acknowledgement, over-rideoperation etc.(iv) Any other indications & selection menu as necessary for the operation <strong>of</strong> thesystem & to meet requirement <strong>of</strong> this specification.(v) Selection menu to select/ enter the minimum train parameters like type <strong>of</strong>train, no. <strong>of</strong> coaches/ wagons etc. to select the set <strong>of</strong> minimum eightpredefined train characteristics.6.18.2 Red light & Green light indicating respectively the faulty & healthy condition <strong>of</strong> OnBoard TPWS. Non-resettable type electromechanical counter for recording the cases<strong>of</strong> emergency brake application.Track-side System:6.19 Balise shall conform to latest approved specifications issued by UIC/UNISIG. Baliseshall be guaranteed for operational compatibility with balise manufactured by differentmanufacturers.6.20 Line-side Electronic Unit (LEU) shall also conform to the latest specifications issued byUIC/UNISIG <strong>and</strong> shall be suitable to work with Indian Railways’ Signalling System.LEU shall be capable <strong>of</strong> receiving minimum 10 signal inputs. It shall be capable <strong>of</strong>delivering minimum four separate channels so that at least four data balises may bedriven upto 2500m. The manufacturer/ supplier shall mention the maximum number <strong>of</strong>


inputs & maximum number <strong>of</strong> channels an LEU can h<strong>and</strong>le. Balise controlling interfacecable shall meet the requirement mentioned in UNISIG specification for balise.6.21 The balise shall be either class-A or class-B based on the limits <strong>of</strong> debris on the top <strong>of</strong>the balise as per following table:Material DescriptionLayer on top <strong>of</strong> Balise (mm)Class B Class AWater Clear 100 2000.1 % NaCl (weight) 10 100Snow Fresh, 0 0 C 300 300Wet, 20 % water 300 300Ice Non porous 100 100Ballast Stone 100 100S<strong>and</strong> Dry 20 20Wet 20 20Mud Without salt water 50 50With salt water, 0.5 % 10 50NaCl (weight)Iron Ore Hematite (Fe 2 O 3 ) 20 20Magnetite (Fe 3 O 4 ) 2 20Iron dust Braking dust 10 10Coal dust 8 % sulphur 10 10Oil <strong>and</strong>Grease50 50Purchaser shall select the class <strong>of</strong> the balise depending upon the requirement.6.22 It shall be possible to provide additional balises as infill for updating the movementauthority in advance.6.23 On common loop lines or single line sections on which bi-directional movement ispermitted, there shall be provision so that balise pertaining to opposite side signal/movement are not read by the On-board system as per the direction <strong>of</strong> movement. Forthis, each signal on such lines shall be provided with two balises viz. One fixed balise& one switchable balise.6.24 <strong>Design</strong> <strong>of</strong> trackside system shall be such that in the event <strong>of</strong> simultaneous display <strong>of</strong>two conflicting aspects caused by defective components like signal lamp, informationcorresponding to either the more restrictive <strong>of</strong> the two aspects or the most restrictiveaspect <strong>of</strong> that signal shall be passed on to the OBC. Likewise, in the case <strong>of</strong> blanksignals, the information corresponding to most restrictive aspect <strong>of</strong> that signal shall betransmitted to OBC.6.25 LEU <strong>and</strong> Balise constituting track side system shall be designed in such a way that forany disconnection, low insulation or short circuit fault in connecting cable, a visualindication shall be given to the OBC <strong>and</strong> the information corresponding to mostrestrictive aspect <strong>of</strong> that signal shall be transmitted to OBC. These failures shall be onsafe side.6.26 The track side system <strong>of</strong> the TPWS shall work on DC power supply. A nominal 110VAC 50 Hz power supply (with variation <strong>of</strong> +20%, -30%) shall be made available by therailways at the signal location. A suitable conversion from 110V AC supply to DC


supply shall be provided by the supplier to work the track side system on DC powersupply. There shall be a suitable DC back-up with charging arrangement to managepower outages for the minimum duration <strong>of</strong> half an hour. Purchaser can specify theduration <strong>of</strong> backup in case it is required for more than half an hour.6.27 The Manufacturer/ supplier shall submit the health monitoring scheme <strong>of</strong> LEUs.6.28 The manufacturer/ supplier shall submit the maximum power drawn by the track sidesystem which shall not exceed 100 watts.7.0 PERFORMANCE, DOCUMENTATION & TRAINING REQUIREMENTS7.1 The MTBF <strong>of</strong> each sub-system <strong>of</strong> track side as well as On board system shall be asunder:Sub-SystemMinimum MTBF (Hrs.)OBC with JRU 25,000SDMI/DMI 20,000BTM 25,000Balise Antenna 1,00,000Speed & Distance Measuring Unit 25,000TIU 15,000LEU 60,000Balise 1,00,000However, manufacturer shall have adequate redundancy to achieve the MTBSF <strong>of</strong>entire on-board system <strong>of</strong> more than 20,000 hrs.7.2 MTBF <strong>of</strong> each card, each sub-system <strong>and</strong> reliability figure <strong>of</strong> complete system shall befurnished.7.3 TPWS shall have minimal impact on operations while providing accurate & reliablespeed enforcement.7.4 Deleted.7.5 Deleted.7.6 Manufacturer or supplier shall provide sufficient training in operation, maintenance &troubleshooting <strong>of</strong> the system to railway personnel as nominated by the purchaserrailway.7.7 Manufacturer shall guarantee availability <strong>of</strong> spares throughout the life <strong>of</strong> theequipments.8.0 ENVIRONMENTAL CONDITIONS8.1 The PCBs shall meet the requirements clause 6.8 <strong>of</strong> RDSO/SPN/144/2006.8.2 Balise <strong>and</strong> LEU shall have minimum protection code <strong>of</strong> IP 67 <strong>and</strong> IP 54 respectively.8.3 On-board (external) equipment shall have minimum protection code <strong>of</strong> IP 67.8.4 Deleted.8.5 The design <strong>of</strong> on board & track side systems shall take into account switching transientsthat may occur, in either the system or out side, <strong>of</strong> any magnitude, upto <strong>and</strong> includinginterruption due to short circuit <strong>of</strong> 25 KV system. The design shall also take into accountsupply related surge & transient.


8.6 On board as well as track side systems <strong>and</strong> system design shall take into account effect<strong>of</strong> lightning.8.7 The on board system shall be capable <strong>of</strong> operating efficiently inspite <strong>of</strong> dust, dirt, mist,torrential rains, heavy s<strong>and</strong> or snow storms, presence <strong>of</strong> oil vapors <strong>and</strong> radiant heat etc.,to which rolling stock is normally exposed in service. The system shall be suitable fortraction application under the following environmental conditions:‣ Atmospherictemperature‣ HumidityMaximum temperature <strong>of</strong> metallic surface underthe Sun: 75 degree celsius <strong>and</strong> in shade: 55degree celsiusMinimum temperature: - 10 degree celsius (Alsosnow fall in certain areas during winter season)100% saturation during rainy season‣ Referenceconditions‣ Rain fallsitei) Ambient temperature: 50 degree celsiusii) Humidity: 100%iii) Altitude: 1776 m above mean sea levelVery heavy in certain areas.‣ Atmosphericconditions‣ Coastal area‣ Vibration‣ Wind speedExtremely dusty <strong>and</strong> desert terrain in certainareas. The dust concentration in air may reach ahigh value <strong>of</strong> 1.6 mg/m3. In many iron ore <strong>and</strong> coalmine areas, the dust concentration is very highaffecting the filter <strong>and</strong> air ventilation systemhumid <strong>and</strong> salt laden atmosphere with maximumpH value <strong>of</strong> 8.5, sulphate <strong>of</strong> 7 mg per liter,maximum concentration <strong>of</strong> chlorine 6 mg per liters<strong>and</strong> maximum conductivity <strong>of</strong> 130 micro siemens /cmThe vibration <strong>and</strong> shock levels recorded onvarious sub-systems in existing locomotives <strong>of</strong> IRare generally more than the limits given in IEC61373 particularly at axle box, <strong>and</strong> traction motorAccelerations over 500 m/s 2 have been recordedat axle box levels during run. Vibrations duringwheel slips are <strong>of</strong> even higher magnitudeHigh level <strong>of</strong> vibrations above 30g have beenmeasured at traction motor on IR’s locomotives,which increase up to 50g with worn gear-pinion.High wind speed in certain areas, with windpressure reaching 150 kg/m29.0 TESTS AND REQUIREMENTS9.1 The firm should have all essential <strong>Testing</strong> Equipments as per latest ‘Schedule <strong>of</strong>Technical Requirements’ (STR).9.2 Unless otherwise specified, all tests shall be carried out at ambient atmosphericconditions. For inspection <strong>of</strong> material, relevant clauses <strong>of</strong> IRS: S 23 <strong>and</strong>RDSO/SPN/144 shall also apply.


9.3 Type Tests:9.3.1 Following tests shall constitute type tests:a) Visual inspection as per clause 10.2;b) EMC as per European St<strong>and</strong>ard EN 50121.c) Sub system/ Card level functional test as per format approved by RDSO;d) System level functional tests as per format approved by RDSO;e) System Diagnostics test;f) Fail-Safety tests on one card <strong>of</strong> each type as per CENELEC 50129 st<strong>and</strong>ards;g) Deleted.h) Interoperability Test– The inter-operability <strong>of</strong> <strong>of</strong>fered on-board system shall betested with existing track-side system & inter-operability <strong>of</strong> existing on-boardsystem shall be tested with <strong>of</strong>fered track-side system. (This shall be done onlyat the time <strong>of</strong> Initial Type Approval & when there is any design change whichmay affect the interoperability).9.3.2 For track side system, following tests shall also constitute type tests:(a) Insulation Resistance test as per relevant clause <strong>of</strong> RDSO/SPN/144;(b) Applied High Voltage test as per relevant clause <strong>of</strong> RDSO specification no.RDSO/SPN/144;(c) Environmental/ climatic tests as per RDSO specification no. RDSO/SPN/144.;(d) Vibration tests as per RDSO specification no. RDSO/SPN/144.9.3.3 For on board system, following tests shall also constitute type tests:(a) Performance Test as per clause 10.2.2 <strong>of</strong> IEC 60571(b) Cooling Test as per clause 10.2.3 <strong>of</strong> IEC 60571(c) Dry heat test as per clause 10.2.4 <strong>of</strong> IEC 60571(d) Damp heat test as per clause 10.2.5 <strong>of</strong> IEC 60571(e) <strong>Supply</strong> over voltage, Surges <strong>and</strong> electrostatic discharge test as per clause10.2.6 <strong>of</strong> IEC 60571(f) Transient burst susceptibility test as per clause 10.2.7 <strong>of</strong> IEC 60571(g) Insulation test as per clause 10.2.9 <strong>of</strong> IEC 60571(h) Salt mist test as per clause 10.2.10 <strong>of</strong> IEC 60571(i) Vibration <strong>and</strong> shock test as per IEC 61373(j) Water tightness test for on board external components as per clause 10.2.12 <strong>of</strong>IEC 60571(k) Tests for reliability <strong>of</strong> electronics used in rolling stock as per RDSO specificationno. ELRS/SPEC/SI/0015 <strong>of</strong> Oct 2001.9.3.4 Any other tests as considered necessary by RDSO in consultation with the supplier/manufacturer.9.4 Acceptance Tests:9.4.1 Following shall comprise acceptance tests:9.4.1.1 For Track-side system/ equipmentsa) Visual inspection as per clause 10.2;b) Insulation Resistance test as per relevant clause <strong>of</strong> RDSO/SPN/144;


c) Sub system/ Card level functional test as per format approved by RDSO;d) System level functional tests as per format approved by RDSO;e) System Diagnostics test;9.4.1.2 For On-board system/ equipmentsa) Visual inspection as per clause 10.2;b) Insulation Resistance test as per Clause 10.2.9 <strong>of</strong> IEC 60571 for On-boardequipments;c) Sub system/ Card level functional test as per format approved by RDSO;d) System level functional tests as per format approved by RDSO;e) System Diagnostics test;9.4.2 Deleted9.5 Routine tests: Manufacturer/supplier shall carry out routine tests on every equipment<strong>and</strong> the test results shall be submitted to the inspecting authority before acceptancetests. Following tests shall constitute routine tests:a) Visual inspection as per clause 10.2;b) Insulation Resistance test as per relevant clause <strong>of</strong> RDSO/SPN/144 for trackside equipment & as per Clause 10.2.9 <strong>of</strong> IEC 60571 for On-board equipments;c) Sub system/ Card level functional test;d) System level functional test;e) System diagnostics test.f) Environmental Stress Screening (ESS) tests as per RDSO specification no.RDSO/SPN/144.9.6 Deleted.9.7 Functional acceptance test: After carrying out acceptance tests, one set <strong>of</strong> onboardsystem <strong>and</strong> 10 sets <strong>of</strong> trackside side systems shall be installed on the section <strong>and</strong>detailed trials shall be conducted by the purchaser for Functional Acceptance Test.The Functional Acceptance Tests shall cover sequence through all required operationsby means <strong>of</strong> purchaser approved static & dynamic scenarios, acceptance tests onbalance equipments/ systems shall be undertaken.10.0 TEST PROCEDURES10.1 The test procedure shall be based on the system design. The methodologies to beadopted for various tests shall be decided taking into account the systemdesign/configuration <strong>and</strong> shall be approved by RDSO.10.2 Visual InspectionThe equipments shall be visually inspected to ensure compliance with therequirements <strong>of</strong> this specification. Visual inspection shall also be carried out after typetests have been performed to check whether any damage has occurred resulting fromthe test. The visual inspection will broadly include –10.2.1 System level checking:10.2.1.1 Constructional details.10.2.1.2 Dimensional check.10.2.1.3 General workmanship.10.2.1.4 Configuration.


10.2.1.5 Mechanical polarisation on cards.10.2.2 Card level checking:10.2.2.1 General track layout.10.2.2.2 Quality <strong>of</strong> soldering <strong>and</strong> component mounting.10.2.2.3 Conformal coating.10.2.2.4 Legend printing.10.2.2.5 Green masking.10.2.3 Module level checking:10.2.3.1 General shielding arrangement <strong>of</strong> individual cards.10.2.3.2 Indications <strong>and</strong> displays.10.2.3.3 Mounting <strong>and</strong> clamping <strong>of</strong> connectors.10.2.3.4 Proper housing <strong>of</strong> cards.11.0 INFORMATION/ DOCUMENTS TO BE FURNISHED BY THE MANUFACTURER /SUPPLIER:11.1 Manufacturer shall furnish following information at the time <strong>of</strong> initial type approval:(a) Approach for RAMS as per CENELEC - 50126 containing detailed analysis <strong>of</strong>equipment <strong>and</strong> complete system(b) The certificate <strong>of</strong> verification <strong>and</strong> validation <strong>of</strong> safety, reliability & availability etc.as per relevant st<strong>and</strong>ards (SIL 4 or equivalent) from reputed agency havingexperience in this field. The agency to be engaged for validation shall be gotapproved from RDSO. The certificate <strong>of</strong> pro<strong>of</strong> <strong>of</strong> safety giving complete tests &their results that have been undertaken by the manufacturer or independentsafety assessor shall also be submitted.(c) Estimated analytical MTBF & MTBWSF (Mean Time Between Wrong SideFailures) figures for each sub-system <strong>and</strong> system as a whole.(d) Details <strong>of</strong> s<strong>of</strong>tware algorithm flow chart along with test/validation procedure used<strong>and</strong> the results there<strong>of</strong>.(e) The manufacturer shall submit details <strong>of</strong> all components, its part Nos., Temprange, tolerance etc.(f) Details <strong>of</strong> Hardware e.g. schematic diagrams <strong>of</strong> the system circuits/components,details for each type <strong>of</strong> assembled PCB.(g) Version No. <strong>of</strong> equipments & S<strong>of</strong>tware checksum <strong>of</strong> EPROM(s) shall be providedas per RDSO/SPN/144.11.2 Following manuals shall be submitted by the supplier/ manufacturer for on-board aswell as for track side system separately-11.2.1 <strong>Installation</strong> Manual with pre-commissioning check list.11.2.2 Maintenance Manual with Diagnostics procedure including troubleshooting charts.11.2.3 User manual with Do’s & Don’t with Diagnostics procedure includingtroubleshooting charts.11.3 In case <strong>of</strong> Cross Acceptance/ Approval, the manufacturer/ vendor shall submitdocuments as per the prevailing guidelines in this regard which may be obtained from


RDSO. In addition, the manufacturer shall also be required to submit the certificates(preferably from user railways) certifying the interoperability <strong>of</strong> their TPWS (track sideas well as on board system) with the TPWS (track side as well as on board system) <strong>of</strong>the manufacturers whose TPWS are working on Indian Railways. Version No. <strong>of</strong>Signalling equipment as per manufacturer’s practice may be accepted.11.4 The manufacturer/supplier shall submit list <strong>of</strong> recommended spare parts.11.5 Manufacturer shall submit the expected life <strong>of</strong> the system/ sub-system.11.6 Manufacturer/ Supplier shall submit the complete details <strong>of</strong> the items which arefinalized/ decided by the manufacturer (e.g. utilization <strong>of</strong> spare bits <strong>of</strong> various packets& spare packets transmitted from track to train for various purposes to meet customer’srequirements) permitted under the ETCS/ ERTMS specifications.11.7 Documents for Approval:11.7.1 The brake interface arrangement alongwith the train interface arrangement shall begot approved from RDSO.11.7.2 RDSO shall supply the data <strong>of</strong> weight, rotating mass, <strong>and</strong> Braking effort <strong>of</strong> varioustypes <strong>of</strong> locos, coaches <strong>and</strong> wagons. Values <strong>of</strong> EBD, SBD <strong>and</strong> max accelerationwith + 10% accuracy for different train formations shall also be supplied by RDSO.The working out <strong>of</strong> correct train parameters shall be the responsibility <strong>of</strong> the supplierbased on this information. The braking algorithm along with the input parametervalues for various train configurations shall be furnished & demonstrated to thesatisfaction <strong>of</strong> RDSO by the manufacturer/supplier before implementation in thesection.11.7.3 The national values to be adopted shall be got approved from the purchaser.12.0 QUALITY ASSURANCE & WARRANTY12.1 All materials <strong>and</strong> workmanship used in manufacture <strong>of</strong> TPWS equipments shall be <strong>of</strong>good quality. Since the quality <strong>of</strong> the equipment bears a direct relationship to themanufacturing process <strong>and</strong> the environment under which it is manufactured, themanufacturer/supplier shall ensure Quality Assurance Program <strong>of</strong> adequate st<strong>and</strong>ard.12.2 All test instruments shall be available with the manufacturer/supplier.12.3 The manufacturer/supplier shall submit along with prototype sample for type test, theQuality Assurance Manual.12.4 The entire TPWS including all its equipments <strong>and</strong> subsystems shall be under warrantyfor three years from the date <strong>of</strong> commissioning <strong>of</strong> complete system.13.0 PACKING13.1 The equipment <strong>and</strong> its sub assemblies shall be wrapped in bubble sheet <strong>and</strong> thenpacked in thermocole boxes <strong>and</strong> the empty spaces shall be filled with suitable fillingmaterial. All PCBs shall be enclosed in anti-static shield cover. The equipment shall befinally packed in a wooden case <strong>of</strong> sufficient strength so that it can withst<strong>and</strong> bumps<strong>and</strong> jerks encountered in a road/ rail/ Air/ Ship journey.13.2 Each box shall be marked with code numbers, contents <strong>and</strong> name <strong>of</strong>manufacturer/supplier. The upside shall be indicated with an arrow. Boxes should havest<strong>and</strong>ard signages to indicate the correct position <strong>and</strong> precaution “H<strong>and</strong>le with Care”with necessary instructions.13.3 Printed circuit boards shall be separately <strong>and</strong> individually packed to prevent damage.


14.0 INFORMATION TO BE SUPPLIED BY PURCHASERa) Type <strong>of</strong> locomotives <strong>and</strong> their brake system on which the TPWS is to be installed.b) Brake interface in terms <strong>of</strong> clause 5.13.1.c) Type <strong>of</strong> signals where TPWS is to be installed.d) Available braking distance in the sectione) The voltage <strong>of</strong> input power supply available for On board <strong>and</strong> track side system.f) The duration <strong>of</strong> battery backup required for LEU, if required for more than half anhour.g) Relevant G & SR rules applicable alongwith speed restriction limits.h) Class <strong>of</strong> balise in terms <strong>of</strong> clause 6.21.i) Type <strong>of</strong> Driver’s interface whether SDMI or DMI in terms <strong>of</strong> clause 4.1 (ii) d &6.18.1.j) Whether 8 position switch is required in terms <strong>of</strong> clause 6.18.k) Purchaser shall specify the details <strong>of</strong> section, signaling details, type <strong>of</strong> locomotive<strong>and</strong> brake system to be used in the section in terms <strong>of</strong> clause 4.5 to 4.10.l) Details mentioning the UIC/UNISIG SRS/FRS version <strong>of</strong> existing TPWS systemwith which the TPWS as per this specification is required to be interoperable.m) Requirement <strong>of</strong> Juridical Recording Unit (JRU) in terms <strong>of</strong> Clause 4.1 (ii) (b).n) After award <strong>of</strong> contract, following information shall also be provided by thepurchaser:(i) Availability <strong>of</strong> potential free contact <strong>of</strong> lamp proving relays(ii) Details <strong>of</strong> the section like gradients, permanent speed restrictions,maximum sectional speed <strong>and</strong> route details <strong>of</strong> the section etc. whereTPWS is to be installed.(iii) Location <strong>of</strong> Signals.(iv) Location for installation <strong>of</strong> LEU.(v) Arrangement <strong>of</strong> release speed in terms <strong>of</strong> clause 5.6.3.(vi) Potential free contact <strong>of</strong> Cab active, forward direction <strong>and</strong> reverse direction<strong>of</strong> locomotive.(vii) Details regarding type <strong>of</strong> locomotive such as Train control circuit withdetails <strong>of</strong> traction cut-<strong>of</strong>f, battery terminal brake system details <strong>of</strong> existingwheel slip protection device etc.(viii) The train parameters like length <strong>of</strong> the train, weight, deceleration factor,reaction time etc. in connection with programming <strong>of</strong> brakingcharacteristics in the OBCo) Any other relevant information.----xxxx----xxxx----