12.07.2015 Views

DGBR MONTHLY NEWS LETTER 1. This News Letter covers the ...

DGBR MONTHLY NEWS LETTER 1. This News Letter covers the ...

DGBR MONTHLY NEWS LETTER 1. This News Letter covers the ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TECHNICAL PLANNING DIRECTORATEWorks Achievement16. Achievement of works up to 20 Feb 2012 is as under:-SerNo.Nameofwork(a) Fmn EqvtCl-9Km(b) Surf(c) Resurf(d) PmtWksA/U Annual Works Plan BE 2011-12 Achievement up to20 Jan2012GS Agency Total GS Agency Total221<strong>1.</strong>26 96<strong>1.</strong>30 3172.55 1199.16 390.64 1589.80EqvtCl-9KmCl-9KmRs. inLakh2747.26 3255.24 6002.50 808.14 1062.96 187<strong>1.</strong>102644.04 73.21 2717.25 131<strong>1.</strong>72 122.60 1434.32134479.58 112116.56 246596.14 48352.73 39322.98 87675.71RemarksWORKS PROJECT DIRECTORATE117. Following AEs / RAEs have been sanctioned during <strong>the</strong> month of Feb 2012 :-S/No Project Nos of AEsSanctionedNos ofRAEsSanctioned(i) Beacon 0 2(ii) Sampark 4(iii) Deepak 1(iv) Himank 1(v) Vijayak 3(vi) Shivalik 4(vii) STF Hirak 7(viii) Sewak 8(ix) Setuk 0(x) Udayak 4 1(xi) Vartak 3(xii) Arunank 2(xiii) Brahmank 1(xiv) Chetak 3(xv) Pushpak 3(xvi) Dantak 1(xvii) Swastik 3(XVIII) Rohtang Tunnel 1Total 49 3Nos ofRevisionAEsSanctionedRemarks

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!