14. User trials in progressS/No Firm Subject Remarks(a) EBW, Swastik Beta MRMS EBW has been instructed to send <strong>the</strong>ir rep toProject Swastik for rectification of defects of MRMSvide this Dte letter No 55008/Trial/ MRMS/<strong>DGBR</strong>/134/E4 Tech dated 16 Feb 2012.(b) M/s BEML Snow cutterBS-42(c)(d)(e)(f)(g)(h)(j)(k)M/s MetaliteInternational PvtLtdM/s TVS MotorLtdM/s Mahindra &MahindraM/s RajEnterprisesOko puncturefree tyreSealantTVS StarSports & TVSApache RTRMultiplePorposetractorFIR EngergyJacketM/s Atlas Copco M/s MWCRock drillROC-T15M/s EscortsConstructionEqptM/s AshokleylandM/s AcrowBridge LtdBackhoeloader8 cum Tipper4x2Pre-engineeredbridgesA team consisting of 3 technician and 2 engineersis being proceeding to WBW to undertake certainmodification to <strong>the</strong>ir Snow Cutter BS-42 presentlykept at WBW as intimated by M/s BEML on 22 Feb2012.Trial successfully completed and evaluation underprogress. Firm asked to intimate correct KPL andreason for low KPL achieved during <strong>the</strong> trial periodat Project Deepak.Trial of eqpt with track chain has been completed.Project Vijayak instructed to submit final trial reportvide this Dte A-268150/Tech dated 10 Feb 2012and same awaited.NCNC trial of FIR Engergy jacket under progress inProject Deepak.Trial is under progress in (P) Beacon and (P)Vartak. Project Vartak has been instructed tosubmit <strong>the</strong> trial report along with reason for delay inconducting <strong>the</strong> trialEqpt recd from firm on 04 Jan 2012 andcommencement of NCNC trial has been askedfrom Project vide this Dte letter No55008/Trial/Digmax ECEL/E4 Tech dated 28 Feb2012.Date of receipt /commencement of trial of MPT hasbeen asked from Project vide this Dte letter No55008/Trial/MPT/<strong>DGBR</strong>/36/E4 Tech dated 22 Feb2012.Fresh MoU fwd to firm for <strong>the</strong>ir signature and earlyreturn vide this Dte letter No 55008/Trial/Apollo RdPatcher/<strong>DGBR</strong>/24/E4 Tech dated 27 Feb 2012.MoU fwd to firm for <strong>the</strong>ir signature and early returnvide this Dte letter No 55008/Trial/AMW1618/<strong>DGBR</strong>/17/E4 Tech dated 10 Feb 2012.15. Training/courses at firms premises(i) M/s Simpson, 10 tradesmen(ii) M/s Telcon, 15 Tradesmen(iii) M/s A/Lyland, 20 Tradesmen(iv) M/s Tata Motors, 24 Tradesmen(v) M/s BEML 10 Tradesmen

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!