Evaluation of Aardvark Mk IV Flail - gichd
Evaluation of Aardvark Mk IV Flail - gichd Evaluation of Aardvark Mk IV Flail - gichd
6.4 Handling & Mobility Page 14 of 77 This category is concerned with the manoeuvrability and speed of the machine. 6.4.1 Turning Circle (A2/1) 6.4.1.1 Description: 6.4.1.2 Results: Aardvark was required to turn in as smaller radius as was possible both anti-clockwise and clockwise, and in the forward and reverse direction. (For a definition of front and rear of Aardvark see figure 3.1) 6.4.1.3 Comments & Observations Direction Average Diameter (metres) Forward Left Hand Lock 10.68 Reverse Left Hand Lock 10.37 Forward Right Hand Lock 11.40 Reverse Right Hand Lock 10.68 Table 6-5; Turning Circle in forward and Reverse Aardvark performed adequately on the gravel area set aside for this exercise. Figure 6-5; Aardvark on the gravel used for a Turning Circle DERA/LWS/LSAA/TRD000603/1.2
Figure 6-6; Turning Circle DERA/LWS/LSAA/TRD000603/1.2 Page 15 of 77
- Page 1 and 2: Evaluation of Aardvark Mk IV Flail
- Page 3 and 4: Authorisation Prepared by Mr C A Le
- Page 5 and 6: Abstract Aardvark Clearmine Ltd hav
- Page 7 and 8: List of contents Authorisation iii
- Page 9 and 10: List of Tables Table 4-1; Improveme
- Page 11 and 12: Figure 6-45; Aardvark just passed R
- Page 13 and 14: 1 Introduction 1.1 Contractual Matt
- Page 15 and 16: Rear Front Figure 3-1; Aardvark Mar
- Page 17 and 18: 4.1 Additional Alterations: 4.1.1 T
- Page 19 and 20: 6 Test Procedures and Results 6.1 G
- Page 21 and 22: Figure 6-2; Measuring the height of
- Page 23 and 24: Figure 6-3; Using load cells to wei
- Page 25: Figure 6-4; Measuring the Approach
- Page 29 and 30: Figure 6-7; Aardvark climbing Birch
- Page 31 and 32: Figure 6-9; Speed = 67m/hr, Depth =
- Page 33 and 34: Figure 6-13; After flailing at 300m
- Page 35 and 36: Figure 6-17; Measuring Level used D
- Page 37 and 38: Figure 6-18; Aardvark entering the
- Page 39 and 40: Figure 6-20; Foliage and terrain en
- Page 41 and 42: This page is intentionally blank DE
- Page 43 and 44: Figure 6-24; Test run before cleara
- Page 45 and 46: This page is intentionally blank DE
- Page 47 and 48: Destroyed Mine Case Figure 6-28; La
- Page 49 and 50: GIAT buried in spoil Figure 6-32; P
- Page 51 and 52: Destroyed Mine Case Figure 6-34; La
- Page 53 and 54: This page is intentionally blank DE
- Page 55 and 56: Figure 6-39; Layout of 3 Figure 6-4
- Page 57 and 58: This page is intentionally blank DE
- Page 59 and 60: Figure 6-44; Layout of Run 4 Figure
- Page 61 and 62: Run stopped before these mines Figu
- Page 63 and 64: This page is intentionally blank DE
- Page 65 and 66: Figure 6-52; Layout of Run 6 Figure
- Page 67 and 68: This page is intentionally blank DE
- Page 69 and 70: Figure 6-57; Layout of Run 7 Figure
- Page 71 and 72: Figure 6-60; TMRP-6 and TMA-2 Figur
- Page 73 and 74: een destroyed or detonated. . The G
- Page 75 and 76: Figure 6-66; TMA-3 outside flail wi
6.4 Handling & Mobility<br />
Page 14 <strong>of</strong> 77<br />
This category is concerned with the manoeuvrability and speed <strong>of</strong> the machine.<br />
6.4.1 Turning Circle (A2/1)<br />
6.4.1.1 Description:<br />
6.4.1.2 Results:<br />
<strong>Aardvark</strong> was required to turn in as smaller radius as was possible both anti-clockwise<br />
and clockwise, and in the forward and reverse direction. (For a definition <strong>of</strong> front and rear<br />
<strong>of</strong> <strong>Aardvark</strong> see figure 3.1)<br />
6.4.1.3 Comments & Observations<br />
Direction Average Diameter<br />
(metres)<br />
Forward Left Hand Lock 10.68<br />
Reverse Left Hand Lock 10.37<br />
Forward Right Hand Lock 11.40<br />
Reverse Right Hand Lock 10.68<br />
Table 6-5; Turning Circle in forward and Reverse<br />
<strong>Aardvark</strong> performed adequately on the gravel area set aside for this exercise.<br />
Figure 6-5; <strong>Aardvark</strong> on the gravel used for a Turning Circle<br />
DERA/LWS/LSAA/TRD000603/1.2