2 Customer Information Customer Reference Number TBA Project Title Evaluation of Aardvark Mk IV Company Name Department For International Development Customer Contact Ms. A Docherty Contract Number TBA Milestone Number N/A Date Due (dd/mm/yyyy) 06/11/2000 This Document was produced by DERA for Department For International Development Under Order/Contract reference TBA © Crown copyright 2001Defence Evaluation and Research Agency UK DERA/LWS/LSAA/TRD000603/1.2
Authorisation Prepared by Mr C A Leach Title Project Engineer Signature Date 26/02/2001 Location DERA Chertsey Authorised by Mr J. Hambly Title Technical Manager Signature Date Principal authors Name Mr C A Leach Appointment Project Engineer Location DERA Chertsey DERA/LWS/LSAA/TRD000603/1.2 iii
- Page 1: Evaluation of Aardvark Mk IV Flail
- Page 5 and 6: Abstract Aardvark Clearmine Ltd hav
- Page 7 and 8: List of contents Authorisation iii
- Page 9 and 10: List of Tables Table 4-1; Improveme
- Page 11 and 12: Figure 6-45; Aardvark just passed R
- Page 13 and 14: 1 Introduction 1.1 Contractual Matt
- Page 15 and 16: Rear Front Figure 3-1; Aardvark Mar
- Page 17 and 18: 4.1 Additional Alterations: 4.1.1 T
- Page 19 and 20: 6 Test Procedures and Results 6.1 G
- Page 21 and 22: Figure 6-2; Measuring the height of
- Page 23 and 24: Figure 6-3; Using load cells to wei
- Page 25 and 26: Figure 6-4; Measuring the Approach
- Page 27 and 28: Figure 6-6; Turning Circle DERA/LWS
- Page 29 and 30: Figure 6-7; Aardvark climbing Birch
- Page 31 and 32: Figure 6-9; Speed = 67m/hr, Depth =
- Page 33 and 34: Figure 6-13; After flailing at 300m
- Page 35 and 36: Figure 6-17; Measuring Level used D
- Page 37 and 38: Figure 6-18; Aardvark entering the
- Page 39 and 40: Figure 6-20; Foliage and terrain en
- Page 41 and 42: This page is intentionally blank DE
- Page 43 and 44: Figure 6-24; Test run before cleara
- Page 45 and 46: This page is intentionally blank DE
- Page 47 and 48: Destroyed Mine Case Figure 6-28; La
- Page 49 and 50: GIAT buried in spoil Figure 6-32; P
- Page 51 and 52: Destroyed Mine Case Figure 6-34; La
2<br />
Customer Information<br />
Customer Reference Number TBA<br />
Project Title <strong>Evaluation</strong> <strong>of</strong> <strong>Aardvark</strong> <strong>Mk</strong> <strong>IV</strong><br />
Company Name Department For International<br />
Development<br />
Customer Contact Ms. A Docherty<br />
Contract Number TBA<br />
Milestone Number N/A<br />
Date Due (dd/mm/yyyy) 06/11/2000<br />
This Document was produced by DERA for Department For International<br />
Development Under Order/Contract reference TBA<br />
© Crown copyright 2001Defence <strong>Evaluation</strong> and Research Agency UK<br />
DERA/LWS/LSAA/TRD000603/1.2