The purpose of this document is to provide guidance to Building Certifiers, BillingCustomers <strong>and</strong> Applicants for <strong>fees</strong> <strong>and</strong> charges that are applicable for QFRS referralagency advice in:• The calculation <strong>and</strong> invoicing of the <strong>fees</strong> for building approval work; <strong>and</strong>• The management of enquiries or complaints relating to <strong>fees</strong>.Contents PagePageCalculating Fees 3Travel <strong>and</strong> Accommodation Costs 3Meetings 4St<strong>and</strong>ard Building Applications 5Alternative Solutions 6Reassessment 8Change from Deemed-to-Satisfy to Alternative Solution 8Change from Alternative Solution to Deemed-to-Satisfy 8Inspection/Reinspection 8Building Fit-out 9Building Change of Classification/Use 9Marinas 11Temporary Structures 11Special Structures 11Referral Agency Response 11Request for Comment on FEB 11Fee Calculation for Non BCA Required Special <strong>Fire</strong> <strong>Service</strong>s 12Fees Payable If Building Work Does Not Go Ahead 12Multiple Buildings on One ‘Application to Assess’ 12Multiple Building Applications (MBAs) 13Fee Complaint/Enquiry Management 13QFRS Fee Table 1 July 2013 – 30 June 2014 14Version 0.1 July 2013Page 2


The Calculation <strong>and</strong> Invoicing of Fees for Building Approval WorkCalculating FeesThe calculation of Building <strong>Fire</strong> Safety <strong>fees</strong> is based on the <strong>Fire</strong> <strong>and</strong> <strong>Rescue</strong> <strong>Service</strong> Act1990 (FRSA 1990) <strong>and</strong> the Building <strong>Fire</strong> Safety Regulation 2008 (BFSR 2008).Fees for a building approval activity are calculated based on the <strong>fees</strong> applicable for the datethe application for that activity was received.For example, if an ‘Application to Assess/Reassess Special <strong>Fire</strong> <strong>Service</strong>s <strong>and</strong>/or AlternativeSolution Design’ is received on 28 June 2011; however, the Assessment Report <strong>and</strong> theinvoice was not published until 12 July 2011, the fee for the activity would be calculatedusing the <strong>fees</strong> as at the 28 June 2011.Travel <strong>and</strong> Accommodation CostsThe following table outlines when costs for travel <strong>and</strong> accommodation should be charged tothe billing customer. Additional details are provided in each relevant section.ActivityRegulated/Non-RegulatedTravel ChargeAccommodationChargeFEB/FER Meeting Regulated First 200kms return = NilEach km after 200km return = rateas per ATO claimable businesskilometre ratesAs at 1 July 2012, these were:1600cc <strong>and</strong> less1601cc to 2600cc2601cc <strong>and</strong> over63c per km74c per km75c per kmReasonable costs inaccordance with theMinister forEducation <strong>and</strong>Industrial RelationsDirective Number9/11 ‘DomesticTravelling <strong>and</strong>Relieving Expenses’BAO ConsultancyMeetingNon-RegulatedFirst 70kms one way = NilEach km after 70km one way = rateas per Appendix E of QFRSSt<strong>and</strong>ing Order SO-Q-BM-2.4(Schedule of Fees <strong>and</strong> Charges).As at 1 July 2012 this was:Net Value $3.85GST amount $0.35Reasonable costs inaccordance with theMinister forEducation <strong>and</strong>Industrial RelationsDirective Number9/11 ‘DomesticTravelling <strong>and</strong>Relieving Expenses’Gross Value (incl. GST) $4.20Note: Values are based on rates as at 1 July 2012. Please refer to latest fee schedules for currentrates (Appendix A).Version 0.1 July 2013Page 3


MeetingsPreliminary Meetings (BFSR 2008 s74)The <strong>fees</strong> for preliminary meetings are:Regulated <strong>and</strong>;Calculated at the hourly Preliminary Meeting Fee rate;For the first preliminary meeting for a job, the first hour has a nil fee, each additional hour, orpart of an hour, of the meeting is charged at the hourly Preliminary Meeting Fee rate.For any subsequent preliminary meetings for a job, each hour, or part of an hour, of themeeting is charged at the hourly Preliminary Meeting Fee rate.FEB/FER Meetings (BFSR 2008 s62)The <strong>fees</strong> for FEB/FER meetings are:Regulated <strong>and</strong>;Calculated at an hourly FEB/FER Meeting Fee rate;There is no fee associated with the first three FEB/FER meetings for the one job.For the fourth <strong>and</strong> any subsequent FEB/FER meetings, each hour, or part of an hour, of themeeting is charged at the hourly FEB/FER Meeting Fee rate.Minor Performance Meetings (BFSR 2008 s63)The <strong>fees</strong> for Minor Performance meetings are:Regulated <strong>and</strong>;Not calculated at an hourly rate;The total fee for a Minor Performance meeting is a sum total of:The research fee for evaluation of one subsystem <strong>and</strong>The Minor Performance meeting fee.BAO Consultancy Meetings (QFRS St<strong>and</strong>ing Order SO-Q-BM-2.4)The <strong>fees</strong> for BAO Consultancy meetings are:Non-Regulated <strong>and</strong>;Calculated at the hourly BAO Consultancy rate;The fee for BAO Consultancy Meetings is charged at a flat rate per hour or part of an hour.Version 0.1 July 2013Page 4


St<strong>and</strong>ard Building ApplicationsAssessment (BFSR 2008 s60)The <strong>fees</strong> for st<strong>and</strong>ard building approval assessments are:Regulated <strong>and</strong>;Not calculated at an hourly rate.Special <strong>Fire</strong> <strong>Service</strong> Fees as mentioned in the following sections are calculated using theformula SFSF = BF x SFS% where:SFSF means the special fire service fee for the required special fire service;BF means the base fee for stated building work (BFSR 2008 Sch.2 Part 1); <strong>and</strong>SFS% means the percentage for the required special fire service (BFSR 2008 Sch.2Part 2).Deemed to SatisfyIf the application is a DTS Assessment, the applicant must pay the following <strong>fees</strong>:The base fee for the stated building work (BF);The special fire service fee for each required special fire service for the statedbuilding work (SFSF).Calculation Example ResultFormula: BF + SFSFBF: Building Chargeable m 2 = 1000m 2 BF =$2,318.75SFSF: Calculated on thesum of the percentagesfor required SFSsmultiplied by the BF.FDAS 40%Hydrants 10%Sprinklers 15%Sum of SFS% = 65%Therefore, SFSF = 65% x $2,318.75 (BF)SFSF =$1,507.19DTS Fee: Calculated asBF + SFSF$2,318.75 (BF) + $1,507.19 (SFSF) Total Fee =$3,825.94Note: Values are based on rates as at 1 July 2012. Please refer to latest fee schedules for currentrates (Appendix A).Multiple Building Applications – DTSIf the application is a DTS Multiple Building Application (MBA), the same fee calculationapplies as stated above; however, the following calculations apply:Calculation Example ResultFormula: BF + SFSFBF: Calculated on thesum of the chargeable(m 2 ) value of all assessedstructures that form partof the MBA.Building A: Chargeable m 2 = 500m 2BF = $3,106.75Building B: Chargeable m 2 = 500m 2Building C: Chargeable m 2 = 500m 2Building D: Chargeable m 2 = 500m 2Sum of the Chargeable m 2 = 2000m 2SFSF: Calculated on thesum of the percentagesfor required SFSs on allBuilding A, B & C: FDAS 40%Building A, B, C & D Hydrants 10%Building D Sprinklers 15%SFSF =$2,019.38Version 0.1 July 2013Page 5


Calculation Example Resultassessed structures thatform part of the MBAmultiplied by the BF.Sum of SFS% = 65%Therefore, SFSF = 65% x $3,106.75 (BF)DTS MBA Fee:Calculated as BF + SFSF$3,106.75 (BF) + $2,019.38 (SFSF) Total Fee =$5,126.13Note: Values are based on rates as at 1 July 2012. Please refer to latest fee schedules for currentrates (Appendix A).Alternative SolutionIf the application is an Alternative Solution <strong>and</strong> the QFRS has been asked to assess anFEB/FER for the stated building work, the Alternative Building Solution Assessment <strong>and</strong>Inspection fee is calculated using the formula (AIF + Research Fee + Consultation Fee +FEB Meeting Fee):The Alternative Building Solution Assessment <strong>and</strong> Inspection fee (AIF); <strong>and</strong>The research fee for evaluation of the number of subsystems relevant to the statedbuilding work; <strong>and</strong>The fire engineering brief consultation fee; <strong>and</strong>The fire engineer brief meeting fee, for each fire engineering brief meeting attendedby a representative of the service for each hour or part of an hour.The AIF component of this fee is calculated as (BF + TSFSF) x 2 where:AIF means the Assessment <strong>and</strong> Inspection fee for the stated building work;BF means the base fee for stated building work (BFSR 2008 Sch.2 Part 1); <strong>and</strong>TSFSF means the total of the special fire service <strong>fees</strong> for the required special fireservices for the stated building work.The <strong>Fire</strong> Engineering Brief Consultation fee is charged for the involvement of the QFRSassessing officer in the complete consultation process from the initial fire engineering briefthrough to the final development of the fire engineering report.These <strong>fees</strong> are as stated in the BFSR 2008 Schedule 2, Part 3.Calculation Example ResultFormula: AIF = (BF + TSFSF) x 2BF: Building Chargeable m 2 = 1000m 2 BF = $2,318.75TSFSF: Calculated on thesum of the percentagesfor required SFSsmultiplied by the BF.FDAS 40%Hydrants 10%Sprinklers 15%Sum of SFS% = 65%Therefore, TSFSF = 65% x $2,318.75 (BF)TSFSF =$1,507.19AIF: Calculated as (BF +TSFSF) x 2($2,318.75 (BF) + $1,507.19 (TSFSF)) x 2 AIF = $7,651.88Calculation Example ResultFormula: AIF + Research Fee + Consultation Fee + FEB Meeting FeeResearch Fee:Calculated on the numberof selected Sub Systems.Building Sub Systems: SS-A, SS-B, SS-CNumber of selected Sub Systems = 3Therefore, Research Fee for evaluation of 2 to 5 SubSystems appliesResearch Fee =$2,071.10Version 0.1 July 2013Page 6


Calculation Example ResultConsultation Fee: Once only fee ConsultationFee= $3,962.25FEB Meeting Fee:Based on number of meetings attended. Assume forthis example, four meetings were attended, the fourthof which was for one hour.FEB MeetingFee = $495.25TOTAL AS Fee $7,651.88 (AIF) + $2,071.10 (Research) + $3,962.25(Consultation Fee) + $495.25 (FEB Meeting Fee e.g.fourth meeting of one hour)Total Fee =$14,180.48Note: Values are based on rates as at 1 July 2012. Please refer to latest fee schedules for currentrates (Appendix A).Multiple Building Applications – ASIf the application is a Multiple Building Application (MBA), where at least one structurecontains Alternative Solution components, the same fee calculation for Alternative Solutionsapplies as stated above; however, the following calculations apply:Calculation Example ResultFormula: AIF = (BF + TSFSF) x 2BF: Calculated on thesum of the chargeable(m 2 ) value of all assessedstructures that form partof the MBA.Building A: Chargeable m 2 = 500m 2BF = $3,106.75Building B: Chargeable m 2 = 500m 2Building C: Chargeable m 2 = 500m 2Building D: Chargeable m 2 = 500m 2Sum of the Chargeable m 2 = 2000m 2TSFSF: Calculated on thesum of the percentagesfor all SFSs on allassessed structures thatform part of the MBA.Building A, B & C: FDAS 40%Building A, B, C & D Hydrants 10%Building D Sprinklers 15%Sum of SFS% = 65%Therefore, TSFSF = 65% x $3,106.75TSFSF =$2,019.38AIF: Calculated as (BF +TSFSF) x 2($3,106.75 (BF) + $2,019.38 (TSFSF)) x 2 AIF =$10,252.26Calculation Example ResultFormula: AIF + Research Fee + Consultation Fee + FEB Meeting FeeResearch Fee:Calculated as the numberof selected Sub Systemsfor all assessed structuresthat form part of the MBA.Consultation Fee:Applied once only for allassessed structures thatform part of the MBA.Building A: Sub Systems SS-A, SS-BBuilding B: Sub Systems SS-A, SS-B, SS-CBuilding C: Sub Systems SS-CBuilding D: n/aNumber of selected Sub Systems = 3Therefore, Research Fee for evaluation of 2 to 5 SubSystems appliesOnce only feeResearch Fee =$2,071.10ConsultationFee = $3,962.25Version 0.1 July 2013Page 7


Calculation Example ResultFEB Meeting Fee:Applied once only for allassessed structures thatform part of the MBA(BFSR 2008 Sch. 2 Part3)Based on number of meetings attended. Assume forthis example, four meetings were attended, the fourthof which was for one hour.FEB MeetingFee = $495.25TOTAL AS MBA Fee $10,252.26 (AIF) + $2,071.10 (Research) +$3,962.25 (Consultation Fee) + $495.25 (FEBMeeting Fee e.g. fourth meeting of one hour)Total Fee =$16,780.86Note: Values are based on rates as at 1 July 2012. Please refer to latest fee schedules for currentrates (Appendix A).Reassessment (BFSR 2008 s65)The <strong>fees</strong> for st<strong>and</strong>ard building approval (AS or DTS) reassessments are:Regulated <strong>and</strong>;Calculated at the hourly Reassessment Fee rate.Change from Deemed-to-Satisfy to Alternative SolutionIf a Deemed-to-Satisfy application is changed to an Alternative Solution application, it is theQFRS policy that the new application will pay the full AS fee, <strong>and</strong> 50% of the DTSAssessment <strong>and</strong> Inspection fee will be refunded.Change from Alternative Solution to Deemed-to-SatisfyIf an Alternative Solution application is changed to a Deemed-to-Satisfy application, it is theQFRS policy that the new application will pay the full DTS fee, <strong>and</strong> 50% of the AlternativeBuilding Solution AIF (Assessment <strong>and</strong> Inspection fee) will be refunded.Note: This is only 50% of Alternative Building Solution Assessment <strong>and</strong> Inspection fee (AIF)– <strong>and</strong> does not include the research fee, the fire engineering brief consultation fee or any fireengineer brief meeting <strong>fees</strong>.Inspection/Reinspection (BFSR 2008 s68)The <strong>fees</strong> for st<strong>and</strong>ard building approval inspections are:Regulated <strong>and</strong>;Calculated at an hourly rate.If the Inspection is an ‘Interim Inspection’, the fee is to be calculated at the regulated, hourly,general Inspection fee for each hour, or part of an hour, of the Inspection.If the Inspection is the First Inspection, other than an ‘Interim Inspection’, for that job, nil <strong>fees</strong>are charged for that Inspection.The <strong>fees</strong> for a second or subsequent ‘Inspection for a Staged Approval’ are calculated at thehourly, ‘Additional Inspection’ fee. Note, different <strong>fees</strong> apply to the first (or part of the first)hour of the Inspection <strong>and</strong> each additional (or part of an additional) hour.The <strong>fees</strong> for a second or subsequent Inspection (‘Reinspection’ or ‘Additional Inspection’)are calculated at the hourly, ‘Reinspection’ fee. Note, different <strong>fees</strong> apply to the first (or partof the first) hour of the Inspection <strong>and</strong> each additional (or part of an additional) hour.Version 0.1 July 2013Page 8


Building Fit-outAssessment / Reassessment (BFSR 2008 s59)The <strong>fees</strong> for building fit-out assessments are:RegulatedWhere the BAO has indicated that the fit-out:Affects the performance of a SFS; butDoes not include the modification, replacement or addition of a SFS.The fee is the base fee for the stated building work (BFSR 2008 Sch.2 Part 1).Where the BAO has indicated that the fit-out:Affects the performance of a SFS; <strong>and</strong>Does include the modification, replacement or addition of a SFS.The fee is the Deemed-to-Satisfy Assessment <strong>and</strong> Inspection fee which is calculated usingthe formula Base Fee + SFSF.Note: The SFSF is calculated based on ‘modified, replaced or added’ SFSs only.Inspection/Reinspection (BFSR 2008 s68)The <strong>fees</strong> for building fit-out inspections are the same as those applicable for st<strong>and</strong>ardbuilding inspections. See section above – ‘St<strong>and</strong>ard Building Applications -Inspection/Reinspection’.Building Change of Classification/UseAssessment/ReassessmentSome <strong>fees</strong> for Assessment/Reassessment of ‘Change of Classification/Use’ applications arenon-regulated <strong>and</strong> subject to GST while others are regulated <strong>and</strong> GST-exempt. The type offee is specified below for each type of ‘Change of Classification/Use’ application.Where the BAO has indicated that the Change of Classification/Use is for:A building which does contain SFSs; <strong>and</strong>A building ‘in existence’ before 14 December 1993; <strong>and</strong>The Certifier has not requested that the building be assessed as a St<strong>and</strong>ard BuildingApproval.The fee for Assessment/Reassessment is to be calculated at the regulated, hourly, generalInspection fee for each hour, or part of an hour, of the Inspection.Where the BAO has indicated that the Change of Classification/Use is for:A building which does contain SFSs; <strong>and</strong>A building ‘in existence’ before 14 December 1993; <strong>and</strong>The Certifier has requested that the building be assessed as a St<strong>and</strong>ard BuildingApproval.The fee for Assessment is the Deemed-to-Satisfy Assessment <strong>and</strong> Inspection fee which iscalculated using the formula Base Fee + SFSF. This fee is regulated <strong>and</strong> GST-exempt. Ifthe application is a Reassessment, the regulated, hourly, Reassessment fee for each (orpart of an) hour is charged.Version 0.1 July 2013Page 9


Where the BAO has indicated that the Change of Classification/Use is for: A building which does contain SFSs; <strong>and</strong> A building not ‘in existence’ before 14 December 1993.The fee for Assessment is the Deemed-to-Satisfy Assessment <strong>and</strong> Inspection fee which iscalculated using the formula Base Fee + SFSF. This fee is regulated <strong>and</strong> GST-exempt. Ifthe application is a Reassessment, the regulated, hourly, Reassessment fee for each (orpart of an) hour is charged.Where the BAO has indicated that the Change of Classification/Use is for:A building which does not contain SFSs; <strong>and</strong>The Certifier has asked the QFRS to comment on the <strong>Fire</strong> Safety Considerations.The fee for Assessment/Reassessment is calculated at the hourly, BAO Consultancy rate.This fee is non-regulated <strong>and</strong> subject to GST.As there is no Inspection stage, no Inspection Report is generated <strong>and</strong> therefore noInspection fee is applicable. The BAO will visit the building as part of the Assessmentprocess to determine the suitability of the <strong>Fire</strong> Safety Considerations for the writing of thereport (Building Act 1975 s.112).Inspection/ReinspectionSome <strong>fees</strong> for Inspection/Reinspection of ‘Change of Classification/Use’ applications arenon-regulated <strong>and</strong> subject to GST while others are regulated <strong>and</strong> GST-exempt. The type offee is specified below for each type of ‘Change of Classification/Use’ application.Where the BAO has indicated that the Change of Classification/Use is for:A building which does contain SFSs; <strong>and</strong>A building ‘in existence’ before 14 December 1993; <strong>and</strong>The Certifier has not requested that the building be assessed as a St<strong>and</strong>ard BuildingApproval.The <strong>fees</strong> for Inspection/Reinspection are to be calculated at the hourly BAO Consultancyrate.Where the BAO has indicated that the Change of Classification/Use is for:A building which does contain SFSs; <strong>and</strong>A building ‘in existence’ before 14 December 1993; <strong>and</strong>The Certifier has requested that the building be assessed as a St<strong>and</strong>ard BuildingApproval.The <strong>fees</strong> for Inspection/Reinspection are the same as the St<strong>and</strong>ard Building ApprovalInspection process. See section above – ‘St<strong>and</strong>ard Building Applications -Inspection/Reinspection’.Where the BAO has indicated that the Change of Classification/Use is for: A building which does contain SFSs; <strong>and</strong> A building not ‘in existence’ before 14 December 1993.The <strong>fees</strong> for Inspection/Reinspection are the same as the St<strong>and</strong>ard Building ApprovalInspection process.Note: Where AS has been selected for the job; ‘Building Change of Classification/Use’ is nota possible ‘nature of building application’.Version 0.1 July 2013Page 10


MarinasThe <strong>fees</strong> for Assessment/Reassessment or Inspection/Reinspection of an applicationinvolving a marina are:Non-Regulated <strong>and</strong>;Calculated at the hourly BAO Consultancy rate.Temporary StructuresSome <strong>fees</strong> for Inspection/Reinspection of ‘Temporary Structure’ applications are nonregulated<strong>and</strong> subject to GST while others are regulated <strong>and</strong> GST-exempt. The type of fee isspecified below for each type of ‘Temporary Structure’ application.Assessment/ReassessmentThe fee for Assessment or Reassessment of an application involving a temporary structureis to be calculated at the non-regulated, hourly BAO Consultancy fee.Inspection / ReinspectionWhere the BAO has indicated that the application involving a Temporary Structure does notinclude SFSs, the fee for Inspection or Reinspection of the temporary structure is to becalculated at the non-regulated, hourly BAO Consultancy fee.Where the BAO has indicated that the application involving a Temporary Structure doesinclude SFSs, the fee for Inspection or Reinspection of the temporary structure is to becalculated at the regulated, hourly, general Inspection fee for each hour, or part of an hour,of the Inspection.Fees are calculated at both Assessment <strong>and</strong> Inspection <strong>and</strong> charged/invoiced separately.Special StructuresThe <strong>fees</strong> for Assessment/Reassessment or Inspection/Reinspection of special structuresare:Non-Regulated <strong>and</strong>;Calculated at the hourly BAO Consultancy fee rate.Fees are calculated at both Assessment <strong>and</strong> Inspection <strong>and</strong> charged/invoiced separately.Referral Agency ResponseThe <strong>fees</strong> for Assessment of an application for ‘Referral Agency Response prior toApplication to a Certifier’ are:Non-Regulated <strong>and</strong>;Calculated at the hourly BAO Consultancy fee rate.As there is no Inspection stage for ‘Referral Agency Response prior to Application to aCertifier’, the fee is calculated at Assessment only.Request for Comment on FEBThe <strong>fees</strong> for ‘Request for Comment on a FEB’ are:Non-Regulated <strong>and</strong>;Version 0.1 July 2013Page 11


Calculated at the hourly BAO Consultancy fee rate.As there is no Inspection stage for ‘Request for Comment on a FEB’, the fee is calculated atthe initial application only.Fee Calculation for Non BCA Required Special <strong>Fire</strong> <strong>Service</strong>sOutlined below are rules regarding the calculation of <strong>fees</strong> depending on whether or not SFSsincluded in a building approval application are required by the BCA. These rules apply onlyto Deemed-to-Satisfy Applications as the QFRS has jurisdiction on all FSIs/ SFSs in ASApplications.If a SFS is not required by the BCA <strong>and</strong> the Building Certifier requests the QFRS toassess/inspect, the BAO will assess/inspect <strong>and</strong> charge the appropriate <strong>fees</strong>. Thisrequest must be in writing e.g. email, to assist in clarification of <strong>fees</strong> to the applicant ifnecessary.If a SFS is not required by the BCA <strong>and</strong> the Building Certifier does not request theQFRS to assess, the BAO will not provide advice on that SFS (compliant/noncompliant) <strong>and</strong> not charge the <strong>fees</strong> for that SFS. This request must be in writing, forexample email, to assist in clarification of <strong>fees</strong> to the applicant if necessary.The CSOS will have the functionality to record that a non BCA required SFS has beeninstalled, but not include this SFS in the calculation of <strong>fees</strong> in the event that the BuildingCertifier does not request the SFS to be assessed.The Assessment/Inspection reports generated by the CSOS will include these 'non BCArequired SFS', however no jurisdictional points will be included. The CSOS will also providest<strong>and</strong>ard commentary to be inserted in the Assessment/Inspection reports in theseinstances, which identify the SFSs for which “the QFRS have not assessed <strong>and</strong> for which theQFRS are not able to provide advice as per the SPR 2009 Schedule 7, Table 1 although it isexpected that the SFS complies to all relevant codes or st<strong>and</strong>ards".Fees Payable If Building Work Does Not Go AheadIf building work doesn’t go ahead after an Assessment Report is provided to theApplicant/Building Certifier <strong>and</strong> an invoiced issued, no refund on the fee paid or payable willoccur as the <strong>fees</strong> are for Assessment <strong>and</strong> Inspection <strong>and</strong> are not separated in the BFSR2008.Multiple Buildings on One ‘Application to Assess’The QFRS will separate a single ‘Application to Assess’ into multiple ’Applications’ if itincludes more than one assessable building. This is in alignment with the BFSR 2008 whichrefers to <strong>fees</strong> being applied for a ‘building’; however, see also the following Multiple BuildingApplications section.In the event that multiple separate assessable buildings on one site are included in anapplication, the QFRS will separate the application into relevant individual buildingapprovals. Each building will then be treated as a separate application for the site, (e.g.individual Assessment <strong>and</strong> Inspection reports) <strong>and</strong> nil fee is charged for the first Inspection(excluding interim inspections) of each building. The BAO will charge the appropriate basefee for each building <strong>and</strong> apply the SFS % for any SFS that are installed in each building(e.g. special automatic fire suppression systems) <strong>and</strong> will also apply the SFS % for any SFSthat serves that building (e.g. hydrant booster).Version 0.1 July 2013Page 12


Multiple Building Applications (MBAs)On the Application to Assess/Reassess Special <strong>Fire</strong> <strong>Service</strong>s <strong>and</strong>/or Alternative SolutionDesign (Form CSO 020), applicants can elect to have buildings assessed as part of aMultiple Building Application. The QFRS will assess multiple buildings as a ‘MBA’ as long asthey:Are lodged on the same day; <strong>and</strong>Are for the same site; <strong>and</strong>Have the same billing customer; <strong>and</strong>Have the same Development Approval for Building Work number; <strong>and</strong>Have the same nature of application (that being either: Building Approval, Fit-out of aBuilding, or Fit-out (DTS) in an AS Building.In the event that multiple separate assessable buildings on one site are included in anapplication submitted as a MBA, the QFRS will nominate a ‘parent’ building <strong>and</strong> theremaining assessable buildings become ‘children’ for the purpose of producing one RFTI.Each building will then be treated as a separate job in the CSOS, (e.g. individualAssessment <strong>and</strong> Inspection reports); however, will be treated as a sum total as if it was onebuilding when calculating <strong>fees</strong>. A nil fee is charged for the first Inspection for the site (not perstructure) (excluding interim inspections). The BAO will charge the appropriate <strong>fees</strong> asoutlined in each section of this module.Fee Complaint/Enquiry ManagementIncluded in Appendix A is the process to be followed when managing fee related complaintsor enquiries. The following points provided further guidance:Applicants/Building Certifiers making an enquiry or complaint relating to Building <strong>Fire</strong>Safety <strong>fees</strong> should, in the first instance, be directed to the BFSR 2008, Part 6. TheBFRS 2008 can be found on the <strong>Queensl<strong>and</strong></strong> Legislation website at:http://www.legislation.qld.gov.au/ LEGISLTN/CURRENT/B/Buildg<strong>Fire</strong>SR08.pdfIf an Applicant/ Building Certifier wishes to lodge a formal complaint they should beadvised to do so in writing, including:o Details of the Assessment, including the building’s address;o Specific nature of the complaint <strong>and</strong> desired resolution; <strong>and</strong>o Their contact details.Formal complaints should be addressed to:Manager State Building <strong>Fire</strong> Safety UnitState Community Safety Operations Branch<strong>Queensl<strong>and</strong></strong> <strong>Fire</strong> <strong>and</strong> <strong>Rescue</strong> <strong>Service</strong>GPO Box 1425 Brisbane<strong>Queensl<strong>and</strong></strong> 4001 The QFRS will review each complaint individually, <strong>and</strong> provide a response within 15working days.Version 0.1 July 2013Page 13


Appendix AQFRS Fee’s 1 July 2013 – 30 June 2014Base fee relating to building work:Fee effective1 July 2013Building work with a floor area not more than 700 sq m $1,332.50Building work with a floor area more than 700 sq m but not more than 1,100 sq m $2,399.90Building work with a floor area more than 1,100 sq m but not more than 1,500 sq m $2,935.75Building work with a floor area more than 1,500 sq m but not more than 2,000 sq m $3,215.45Building work with a floor area more than 2,000 sq m –- plus an additional charge for each 100sq m above 2,000 sq m$3,355.30$25.55Reassessment fee – for each hour, or part of an hour, of the assessment $512.55General Inspection fee for each hour, or part of an hour $512.55Re-inspection fee for first hour or part thereof- for each additional hour or part thereofPreliminary meeting fee for proposed building development application, for the first hour-nil.For each additional hour, or part of an hour, of the first meeting <strong>and</strong> for each hour, or part of anhour, of any subsequent meetingMinor Performance Meetings(Minor Performance meetings plus Research Fee for evaluation of 1 subsystem)$1,025.15$512.55Nil$512.55$1,332.50$1,304.75Research fee for 1 subsystem $1,304.75Research fee for 2 – 5 subsystems $2,143.55Research fee for more than 5 subsystems $4,287.35<strong>Fire</strong> engineering design brief consultation; includes reading of three reports <strong>and</strong> attendance atthree meetings (all subsequent meetings are subject of new fee)For the fourth <strong>and</strong> each subsequent meeting, for each hour or part of an hour, of the meeting$4,100.90$512.55BAO Consultancy fee for each hour or part thereof $512.55Version 0.1 July 2013Page 14