warp/m service manual - ADB Lighting Technologies

warp/m service manual - ADB Lighting Technologies warp/m service manual - ADB Lighting Technologies

adblighting.com
from adblighting.com More from this publisher
12.07.2015 Views

Motorised Yoke7.5 Replace Front PanelRequired Tool(s) Spare Part Code Preliminary readingFlat ScrewdriverScrewdriver PZ2Wire Cutter1001.65.000Chapter 7.2Chapter 6.11. Remove External connector and Slide Lamp Wire through the Cable Gland2. Disconnect 24 V Power in + WARP Link 1 + GND (from the Board)3. Cut cable tie behind Top Board (which fixes WARP Link 1)4. Disconnect 230 V Power IN from 24 V Power Supply5. Replace the Front Panel1001.65.000 includes:• 1 Front panelassembly• 3 cable tiesImportant:• When you change the Front Panel Board, youhave to enter the correct IP address by meansof the WEB PAGE. The IP address is writtenon the label on the right Arm.• If you replace only this board, you don’t haveto re-calibrate PAN&TILT2Do not disconnectfrom the RelayBoard1001.65.00031Service Manual - page 42Issue 0.9www.adblighting.com

Motorised Yoke7.6 Replace Top Board PCBRequired Tool(s) Spare Part Code Preliminary readingScrewdriver PZ 0.75Flat ScrewdriverOpen ended spanner 5.51001.65.290Chapter 7.5Chapter 6.11. Remove 6 screws from XLR connectors (PZ 0.75)2. Remove 3 screws (Flat)3. Remove 3 spacers and 2 screws(Open ended spanner + Flat)4. Change the boardImportant:• When you change the Top Board, you have to enterthe correct IP address by means of the WEB PAGE.The IP address is written on the label on the right Arm.• If you replace only this board, you don’t have to recalibratePAN&TILTWARNING:• If you replace the top box Board, you have to send itwith the RMA correctly completed. The IP address ofthe WARP is written into the right Arm on a selfadhesive label.1001.65.290 includes:• 7 Screws M3*12• 6 Screws M3*8• 4 Spacers M3*8• 6 Washers• 2 Nut M3• 1 Top Box Board11001.65.29032www.adblighting.com Service Manual - page 43Issue 0.9

Motorised Yoke7.6 Replace Top Board PCBRequired Tool(s) Spare Part Code Preliminary readingScrewdriver PZ 0.75Flat ScrewdriverOpen ended spanner 5.51001.65.290Chapter 7.5Chapter 6.11. Remove 6 screws from XLR connectors (PZ 0.75)2. Remove 3 screws (Flat)3. Remove 3 spacers and 2 screws(Open ended spanner + Flat)4. Change the boardImportant:• When you change the Top Board, you have to enterthe correct IP address by means of the WEB PAGE.The IP address is written on the label on the right Arm.• If you replace only this board, you don’t have to recalibratePAN&TILTWARNING:• If you replace the top box Board, you have to send itwith the RMA correctly completed. The IP address ofthe WARP is written into the right Arm on a selfadhesive label.1001.65.290 includes:• 7 Screws M3*12• 6 Screws M3*8• 4 Spacers M3*8• 6 Washers• 2 Nut M3• 1 Top Box Board11001.65.29032www.adblighting.com Service Manual - page 43Issue 0.9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!