12.07.2015 Views

350 MW Pragati-II Combined Cycle Power Project of PPCL

350 MW Pragati-II Combined Cycle Power Project of PPCL

350 MW Pragati-II Combined Cycle Power Project of PPCL

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Rapid Environmental ImpactAssessment Study <strong>of</strong> the Proposed<strong>350</strong> <strong>MW</strong> <strong>Pragati</strong>-<strong>II</strong> <strong>Combined</strong> <strong>Cycle</strong><strong>Power</strong> <strong>Project</strong> <strong>of</strong> <strong>PPCL</strong>Doc. No.: CW-EN-9384-C-379-E-R-002Rev. No.: R0Issue Date: 21-02-2006Page No: 15 <strong>of</strong> 1617.0 CONCLUSIONAssessment <strong>of</strong> impacts due to various emissions and discharges from the proposedplant indicate that the environmental quality will remain within the stipulatedstandards after commissioning and operation <strong>of</strong> the project. Based on detailedanalysis <strong>of</strong> present environmental quality, impact assessment based on futurepredictions and various environment measures suggested by the project proponent/recommended as a part <strong>of</strong> this study, it may be concluded that the project isenvironmentally sustainable. All the negative impacts due to construction andoperation <strong>of</strong> the project shall be mitigated by adopting state-<strong>of</strong>-the art technologiesand management systems. In addition, the benefits <strong>of</strong> the project in terms <strong>of</strong> powergeneration, utilization <strong>of</strong> industrial wasteland, improvements in infrastructure etc., willadd to the positive impacts <strong>of</strong> the project.EXECUTIVE SUMMARYMANTEC CONSULTANTS (P) LTD., NEW DELHI

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!