12.07.2015 Views

Krohne OPTIFLEX 1300 C Level Meter Quickstart Guide ... - Instrumart

Krohne OPTIFLEX 1300 C Level Meter Quickstart Guide ... - Instrumart

Krohne OPTIFLEX 1300 C Level Meter Quickstart Guide ... - Instrumart

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2 INSTALLATION<strong>OPTIFLEX</strong> <strong>1300</strong> C2.10.7 Installation recommendations for non-metallic tanks and pitsIf you have a device with a single rod or a single cable probe and a thread connection,obey these instructions:• Put a metal sheet between the device and the process connection.i It must have a diameter greater than 200 mm / 8¨.• Make sure that the metal sheet is in contact with the thread stop on the device.We recommend that you use DN≥200 / ≥8¨ for flange connections.If you have a device with a double rod, double cable or coaxial probe, you can ignore theseinstructions.Figure 2-22: Installation in a non-metallic tank or pit with a thread connection1 Non-metallic (plastic...) tank or pit2 Metal sheet, Ø ≥200 mm / 8¨CAUTION!When the device is installed, make sure that the tank roof has no deformation.22www.krohne.com09/2010 - 4000049805 - QS <strong>OPTIFLEX</strong> <strong>1300</strong> R08 en

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!