Considerations for a Proposed Towerslide8Technical Requirements for Proposed Tower:• Location of proposed new tower must be at the highest ground elevationon the East Campus to provide the desired d water pressure• 60-ft diameter at base• 90-ft diameter at top• 175-ft heightOther Considerations for Site Selection:• Existing topography• Locations of existing subterranean infrastructure• Precedence set by existing water tower• Potential secondary functions of tower within the context of the EastCampus plan
Development of Site Alternativesslide9Site ASite BSite CSite D
- Page 1 and 2: ST. ELIZABETHS WATER TOWERCREATING
- Page 3 and 4: ST. ELIZABETHS WATER TOWERCREATING
- Page 5 and 6: Water Tower Context - Saint Elizabe
- Page 7: Water Tower Context - Saint Elizabe
- Page 11 and 12: Development of Site Alternativessli
- Page 13 and 14: Development of Site Alternativessli
- Page 15 and 16: Assessment of Site Alternatives-Are
- Page 17 and 18: Assessment of Site Alternativesslid
- Page 19 and 20: Assessment of Site Alternativesslid
- Page 21 and 22: Assessment of Site Alternativesslid
- Page 23 and 24: Assessment of Site Alternativesslid
- Page 25 and 26: Assessment of Site Alternativesslid
- Page 27 and 28: Assessment of Site Alternativesslid
- Page 29 and 30: Site Assessmentslide29Criterion #6
- Page 31 and 32: Site Assessmentslide31Criterion #6
- Page 33 and 34: Site Assessmentslide33Criterion #6
- Page 35 and 36: Assessment of Site Alternativesslid
- Page 37 and 38: Assessment of Site Alternativesslid
- Page 39 and 40: Assessment of Site Alternativesslid
- Page 41 and 42: Assessment of Site Alternatives-Fin
- Page 43 and 44: Status of Section 106 Review Proces
- Page 45 and 46: Rural & Industrial Precedentsslide4
- Page 47 and 48: Adjacency and Visual Superimpositio
- Page 49 and 50: Exploration of solid façade using
- Page 51 and 52: Exploration of frame and skin to tr
- Page 53 and 54: Basic Tower Options:slide53Hydropil
- Page 55 and 56: slide55Expression of the industrial
- Page 57 and 58: Cylinder - Frame and Scrim Variatio
Development of Site Alternativesslide9Site ASite BSite CSite D