Earthworks – Landscape Opportunitiesslide74
Summary:Section 106 Scheduleslide751. Invitation to Consulting Parties (6/2009)2. Meeting 1 (7/21/2009)3. Meeting 2 (9/14/2009)4. Meeting 3 (10/5/2009)5. Meeting 4 (Late November 2009)6. Concurrent Activities: (4/2009-1/2009)• On-going coordination within DCWASA + Design Team to vet various options• On-going coordination with key governmental Stakeholders:DCOP, DMPED, GSA/DHS, NPS DC-HPRB, CFA, NCPC• Negotiation of terms of MOA with Signatories
- Page 23 and 24: Assessment of Site Alternativesslid
- Page 25 and 26: Assessment of Site Alternativesslid
- Page 27 and 28: Assessment of Site Alternativesslid
- Page 29 and 30: Site Assessmentslide29Criterion #6
- Page 31 and 32: Site Assessmentslide31Criterion #6
- Page 33 and 34: Site Assessmentslide33Criterion #6
- Page 35 and 36: Assessment of Site Alternativesslid
- Page 37 and 38: Assessment of Site Alternativesslid
- Page 39 and 40: Assessment of Site Alternativesslid
- Page 41 and 42: Assessment of Site Alternatives-Fin
- Page 43 and 44: Status of Section 106 Review Proces
- Page 45 and 46: Rural & Industrial Precedentsslide4
- Page 47 and 48: Adjacency and Visual Superimpositio
- Page 49 and 50: Exploration of solid façade using
- Page 51 and 52: Exploration of frame and skin to tr
- Page 53 and 54: Basic Tower Options:slide53Hydropil
- Page 55 and 56: slide55Expression of the industrial
- Page 57 and 58: Cylinder - Frame and Scrim Variatio
- Page 59 and 60: Tapered Frame Variations - sculptur
- Page 61 and 62: Angled - sculpture in the landscape
- Page 63 and 64: slide63GardenDestinationGarden Foll
- Page 65 and 66: Destination and Placemaking: Cultur
- Page 67 and 68: Water Tower Concept StudiesSite B -
- Page 69 and 70: Destination and Placemaking: Cultur
- Page 71 and 72: Material & Form Opportunities
- Page 73: Earthworks - Landscape Opportunitie
- Page 77 and 78: Consulting Party Questions and Comm
- Page 79 and 80: Structural Frame - Downspouts and P
- Page 81: Structural Frame - Sculptural Trans
Summary:Section 106 Scheduleslide751. Invitation to Consulting Parties (6/2009)2. Meeting 1 (7/21/2009)3. Meeting 2 (9/14/2009)4. Meeting 3 (10/5/2009)5. Meeting 4 (Late November 2009)6. Concurrent Activities: (4/2009-1/2009)• On-going coordination within <strong>DC</strong>WASA + Design Team to vet various options• On-going coordination with key governmental Stakeholders:<strong>DC</strong>OP, DMPED, GSA/DHS, NPS <strong>DC</strong>-HPRB, CFA, NCPC• Negotiation of terms of MOA with Signatories