12.07.2015 Views

AADvance Safety Manual - Tuv-fs.com

AADvance Safety Manual - Tuv-fs.com

AADvance Safety Manual - Tuv-fs.com

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter 3 Functional <strong>Safety</strong> ManagementSystem ProductionSystem IntegrationSystem InstallationThe system production stage implements the detailed system design. The productiontechniques, tools and equipment, including those used for production testing of thesystem, shall be appropriate for the specified safety requirements class.The system integration stage shall integrate the application programs with the<strong>AADvance</strong> controller. Where multiple systems are used to meet an overallrequirement, it is re<strong>com</strong>mended that each sub-system undergoes application programand target system integration and testing before <strong>com</strong>mencing overall systemintegration. To meet the requirements of the intended safety requirements class, thesystem integration shall result in full <strong>com</strong>pliance of the software and hardware with thefunctional safety requirements.The system installation stage shall define the steps to be performed that will ensurethat the system is installed correctly and brought into working order on the plant.The installation environment is a potential source of <strong>com</strong>mon cause failure, therefore itis vital that <strong>com</strong>patibility of the equipment is known. The environment for thesepurposes includes the prevailing climatic, hazardous area, power, earthing and EMCconditions. In many cases, there will not be a single installation environment. Elementsof the system may be installed in differing locations; in these cases, it is important toknow the environment for each location. Where the system <strong>com</strong>prises a number ofphysically separate units, it is important to define a sequence of physical installation.A controller system must be installed in a power network that is designed tomeet over voltage Category II (see BS EN 60664-1)System CommissioningThe <strong>com</strong>missioning stage is to prove the system installation and verify its correct 'endto-end'functionality, including the connection between the <strong>AADvance</strong> controller andthe requisite sensors and final elements. It is likely that groups of functions are<strong>com</strong>missioned in stages rather than the system as a whole, for exampleac<strong>com</strong>modation area functions before production functions. It is important to definethe <strong>com</strong>missioning sequence and the measures to be taken to ensure safe operationduring such periods of partial <strong>com</strong>missioning. These measures shall be system specificand shall be defined clearly before starting any <strong>com</strong>missioning. It is also important todefine that any temporary measures implemented for test purposes, or to allow partial<strong>com</strong>missioning, are removed before the system, as a whole, goes live.Document number 553630 Issue 7: February 2010 3-5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!