Salmon, J., Meurice, J., Wobus, N., Stern, F., Duaime, M., 2011: Guidebook to <strong>geothermal</strong> <strong>power</strong>f<strong>in</strong>ance. Golden, CO: National Renewable Energy Laboratory.Sanyal, S., 2005: Cost of <strong>geothermal</strong> <strong>power</strong> and factors that affect it. Proceed<strong>in</strong>gs World GeothermalCongress, Antalya, Turkey, April 24-29, 2005.Savvides, S., 1994: Risk analysis <strong>in</strong> <strong>in</strong>vestment appraisal. Project Appraisal, Vol. 9, Number 1, 1-30.Seider, W.D., Seader, J.D., Lew<strong>in</strong>, D.R., 2003: Product and Process design pr<strong>in</strong>ciples: synthesis,analysis, and evaluation (2 nd ed.). New York, NY: Wiley, 2003.SIGET, 2010: Boletín de estadísticas eléctricas no 12 2010. Gerencia de Electricidad, San Salvador.Siregar, P., 2004: Optimization of electrical <strong>power</strong> production process for Sibayak <strong>geothermal</strong> field,Indonesia. Report 16 <strong>in</strong>: Geothermal Tra<strong>in</strong><strong>in</strong>g Iceland 2004. UNU-GTP, Iceland, 349-376.SKM, 2009: Assessment of current costs of <strong>geothermal</strong> <strong>power</strong> generation <strong>in</strong> New Zealand (2007basis). Report by SKM for New Zealand Geothermal Association. S<strong>in</strong>clair Knight Merz, Auckland.Website: www.nz<strong>geothermal</strong>.org.nz\<strong>in</strong>dustry_papers.html.Stefánsson, V., 2002: Investment cost for <strong>geothermal</strong> <strong>power</strong> <strong>plant</strong>s. Geothermics, Volume 31, 263-272pp.Ste<strong>in</strong>sdóttir, G., and Ketilsson, J., 2008: Visit to Nicaragua July 2008. Geothermal legal environment<strong>in</strong> Nicaragua. <strong>Orkustofnun</strong>, Reykjavík, report OS-2008/006, prepared for Iceland GeoSurvey.Website: http://www.os.is/gogn/Skyrslur/OS-2008/OS-2008-006.pdfThórhallsson, S., 2006: Common problems faced <strong>in</strong> <strong>geothermal</strong> generation and how to deal with them.Presented at the Workshop for Decision Makers on Geothermal Projects <strong>in</strong> Central America,organized by the UNU-GTP and LaGeo <strong>in</strong> San Salvador, El Salvador, 26 November to 2 December2006, 12 pp.UNCTAD, 2010: Investment policy review of El Salvador. United Nation Publication, 124 pp.UNFCCC, 2004: La Joya hydroelectric project , version 2. Clean Development Mechanism, projectdesign document form (CDM-PDD). Website:http://cdm.unfccc.<strong>in</strong>t/Projects/DB/AENOR1154424472.86/viewUNFCCC, 2005: La Esperanza hydroelectric project. Clean Development Mechanism,design document form (CDM-PDD). Website:http://cdm.unfccc.<strong>in</strong>t/Projects/DB/DNV-CUK1098894708.4projectUNFCCC, 2005: Los Algarrobos Hydroelectric Project (Panama), Version 1. Clean DevelopmentMechanism, Project Design Document Form (CDM-PDD). Website:http://cdm.unfccc.<strong>in</strong>t/Projects/DB/AENOR1124809177.22/viewUNFCCC, 2005: San Jac<strong>in</strong>to Tizate <strong>geothermal</strong> project , Version 2. Clean Development Mechanism,project design document form (CDM-PDD). Website:http://cdm.unfccc.<strong>in</strong>t/Projects/DB/DNV-CUK1135673240.22/viewUNFCCC, 2006: LaGeo, S. A. de C. V., Berl<strong>in</strong> <strong>geothermal</strong> project, phase two, PDD number version18. Clean Development Mechanism, project design document form (CDM-PDD). Website:http://cdm.unfccc.<strong>in</strong>t/Projects/DB/DNV-CUK1141464500.33/viewUNFCCC, 2007: Berl<strong>in</strong> b<strong>in</strong>ary cycle <strong>power</strong> <strong>plant</strong>, version 3.2. Clean Development Mechanism,project design document form (CDM-PDD). Website:69
http://cdm.unfccc.<strong>in</strong>t/Projects/DB/DNV-CUK1182851006.68/viewUNFCCC, 2008: Amatitlan <strong>geothermal</strong> project, version 7. Clean Development Mechanism, projectdesign document form (CDM-PDD). Website:http://cdm.unfccc.<strong>in</strong>t/Projects/DB/DNV-CUK1218173149.57UNFCCC, 2011: Clean development mechanism. Website: cdm.unfccc.<strong>in</strong>t/<strong>in</strong>dex.html.Valdimarsson, P., 2011a: Basic concepts of thermoeconomics. Presented at Short Course onGeothermal Drill<strong>in</strong>g, Resource Development and Power Plants, organized by UNU-GTP and LaGeo,<strong>in</strong> Santa Tecla, El Salvador, January 16-22, 2011.Valdimarsson, P., 2011b: Geothermal <strong>power</strong> <strong>plant</strong> cycles and ma<strong>in</strong> components. Presented at ShortCourse on Geothermal Drill<strong>in</strong>g, Resource Development and Power Plants, organized by UNU-GTPand LaGeo, <strong>in</strong> Santa Tecla, El Salvador, January 16-22, 2011.Walas, S.M., 1990: Chemical process equipment: selection and design. Butterworth-He<strong>in</strong>emann,Boston.Wendel, M. and Hiegl, M., 2010: GEOFAR: F<strong>in</strong>anc<strong>in</strong>g <strong>geothermal</strong> energy <strong>in</strong> European regions.Proceed<strong>in</strong>gs World Geothermal Congress, Bali, Indonesia, April 25-29, 2010.Westney, R., 1997: The eng<strong>in</strong>eer’s cost handbook tools for manag<strong>in</strong>g project cost. Marcel Dekker,Inc., New York, 749 pp.World Bank, 2006: Technical and Economic assessment of grid, m<strong>in</strong>i-grid and off-gradeelectrification technologies. Website: http://www.worldbank.org/World Bank, 2008: Project appraisal document on a proposed Global Environment Facility (GEF)grant of US$ million to the Republic of Indonesia for a Geothermal <strong>power</strong> generation developmentproject. World Bank, report No: 41420-ID. Website:http://www-wds.worldbank.org/external/default/WDSContentServer/WDSP/IB/2008/05/14/000333037_20080514235757/Rendered/PDF/414200PAD0P09910810011110Box327374B.pdfYock Fung, A., 2008: Geothermal resources development <strong>in</strong> Costa Rica. Papers presented at the 30thAnniversary Workshop of the United Nations University Geothermal Tra<strong>in</strong><strong>in</strong>g Programme, UNU-GTP, Reykjavík, August 26-27, 2008.Zuñiga, A., 2005: Nicaragua country update. Proceed<strong>in</strong>gs of the World Geothermal Congress 2005,Antalya, Turkey, 5 pp.70
- Page 1 and 2:
GEOTHERMAL TRAINING PROGRAMMEHot sp
- Page 3 and 4:
This MSc thesis has also been publi
- Page 5 and 6:
ACKNOWLEDGEMENTSMy gratitude to the
- Page 7 and 8:
TABLE OF CONTENTSPage1. INTRODUCTIO
- Page 9 and 10:
PageAPPENDIX A: FINANCIAL MODEL ...
- Page 12 and 13:
1. INTRODUCTIONRecent research on r
- Page 14 and 15:
2. CENTRAL AMERICAN DATA2.1 Power p
- Page 16 and 17:
2.2.3 HondurasThe Honduran electric
- Page 18 and 19:
NET INJECTION BY SOURCE (2010)INSTA
- Page 20 and 21:
income taxes for a period of 10 yea
- Page 22 and 23:
annual temperature ranges from 17 t
- Page 24 and 25:
egional reconnaissance in 1981ident
- Page 26 and 27:
4. GEOTHERMAL ELECTRICAL POWER ASSE
- Page 28 and 29:
The net contribution of that power
- Page 30 and 31: Introducing , = , and , = ,
- Page 32 and 33: 9ProductionWellBoiler5Turbine~1046P
- Page 34 and 35: TABLE 3: Parameters and boundary co
- Page 36 and 37: eaches the maximum limit, and for h
- Page 38 and 39: 160180140160tc vap[i], th vap[i]120
- Page 40 and 41: average results, and combining them
- Page 42 and 43: The base cost ( ) can be calculate
- Page 44 and 45: calculation for another separator c
- Page 46 and 47: mass flow rate (kg/s) on the plant
- Page 48 and 49: Table 11 shows a summary of costs f
- Page 50 and 51: 5.6.4 Comparison of capital costs b
- Page 52 and 53: 6. FINANCIAL FEASIBILITY ASSESSMENT
- Page 54 and 55: 6.2 Model structureThe financial fe
- Page 56 and 57: CCF = EBITDA − ∆Working Capital
- Page 58 and 59: Interest on loansFleischmann (2007)
- Page 60 and 61: IRR30%25%IRR CapitalIRR Equity20%Si
- Page 62 and 63: FIGURE 42: Allocation of funds for:
- Page 64 and 65: 340IRR Free Cash Flow to Equity [ %
- Page 66 and 67: flash technology is between 0.3 and
- Page 68 and 69: Energy Price Availability Factor O&
- Page 70 and 71: FIGURE 50: Density and cumulative p
- Page 72 and 73: In Chapter 6, Figure 44 illustrated
- Page 74 and 75: The internal rate of return is offs
- Page 76 and 77: Cengel, Y. and Tuner, R., 2005: Fun
- Page 78 and 79: IEAb, 2011: Technology roadmap: Geo
- Page 82 and 83: APPENDIX A: SUMMARY OF FINANCIAL MO
- Page 84 and 85: APPENDIX C: INVESTMENT AND FINANCIN
- Page 86 and 87: APPENDIX E: BALANCE SHEETBALANCE SH