12.07.2015 Views

Focus on Energy, 2010 - Karanovic & Nikolic

Focus on Energy, 2010 - Karanovic & Nikolic

Focus on Energy, 2010 - Karanovic & Nikolic

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ti<strong>on</strong> of 4 plants. According to the <strong>Energy</strong> Strategy, The HPPs should have a total power capacitysomewhere in the regi<strong>on</strong> of 101 MW to 124 MW and an average annual producti<strong>on</strong> somewhere inthe regi<strong>on</strong> of 325 to 371 GWh.Milovci. According to <strong>Energy</strong> Strategy, these HPPs will have a combined power capacity in the regi<strong>on</strong>of 75 MW and an average annual producti<strong>on</strong> of 222 GWh.panded.When the first block of the Pljevlja power plant was c<strong>on</strong>structed, a significant part of theinfrastructure was designed with the c<strong>on</strong>structi<strong>on</strong> of sec<strong>on</strong>d block in mind. It is estimated by the<strong>Energy</strong> Strategy that the new block could have a power capacity in the regi<strong>on</strong> of 225 MW.the Berane basin. Such a power plant could have a power capacity in the regi<strong>on</strong> of 125 MW with anestimated annual output of 550 GW.PARTICIPANTS IN THE ENERGY SECTORRegulatory BodiesTHE GOVERNMENT74FOCUS ON ENERGYThe Government defines the nati<strong>on</strong>al energy policy of M<strong>on</strong>tenegro. Under the newly proposed M<strong>on</strong>tenegrin<strong>Energy</strong> Law (the “<strong>Energy</strong> Law”), (which at the time this publicati<strong>on</strong> went to print was due to beadopted in March <strong>2010</strong>) the Government will be in charge of the preparati<strong>on</strong> of the above menti<strong>on</strong>ed<strong>Energy</strong> Strategy. It will also be charged with preparing an accompanying Acti<strong>on</strong> Plan for the Implementati<strong>on</strong>of the <strong>Energy</strong> Strategy (the “Acti<strong>on</strong> Plan”). Apart from the planning documents that describe thenati<strong>on</strong>al energy policy in the energy sector as a whole, the Government will need to issue separate tenyear nati<strong>on</strong>al programs for both the development and the utilizati<strong>on</strong> of the renewable energy sources(the “RES Program”), and a program for the development and utilizati<strong>on</strong> of the high-efficiency cogenerati<strong>on</strong>(the “CHP Program”). The RES Program and the CHP Program should be issued within 12m<strong>on</strong>ths of the new <strong>Energy</strong> Law coming into force.THE MINISTRY OF ECONOMYUnder the <strong>Energy</strong> Law, the Ministry of Ec<strong>on</strong>omy will supervise the implementati<strong>on</strong> of the nati<strong>on</strong>al energypolicy as defined by the Government, and it will prepare annual reports to the Government <strong>on</strong>the executi<strong>on</strong> of the <strong>Energy</strong> Strategy, the Acti<strong>on</strong> Plan, the RES Program and the CHP Program. It willsupervise the activities of the participants in the energy sector, e.g. the producers of electricity, suppliers,traders, and their compliance with the applicable energy laws and regulati<strong>on</strong>s.The Ministry of Ec<strong>on</strong>omy will also decide about permits for the c<strong>on</strong>structi<strong>on</strong> of energy facilities throughthe issuance of energy permits (the “<strong>Energy</strong> Permits”) and will issue approvals for the explorati<strong>on</strong> andthe measurements of the renewable energy sources’ (“RES”) capacities in locati<strong>on</strong>s where interestedinvestors plan to c<strong>on</strong>struct the facilities for the producti<strong>on</strong> of energy from RES.THE REGULATORY ENERGY AGENCY (THE “A G E N C Y ” )The Agency was established by the <strong>Energy</strong> Law from 2003 as the main regulatory body in the M<strong>on</strong>tenegrinenergy sector. Under the new <strong>Energy</strong> Law, the powers of the Agency in the energy sector willinclude, am<strong>on</strong>gst other things, the following: “<strong>Energy</strong> License”); efficiency cogenerati<strong>on</strong>; for transportati<strong>on</strong>, such as transmissi<strong>on</strong> and distributi<strong>on</strong> grids;

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!