12.07.2015 Views

Focus on Energy, 2010 - Karanovic & Nikolic

Focus on Energy, 2010 - Karanovic & Nikolic

Focus on Energy, 2010 - Karanovic & Nikolic

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

to open and commence the operati<strong>on</strong> of the new coal mine will cost approximately of EUR 530 milli<strong>on</strong>to get it up and running.Wind <strong>Energy</strong>MOŽURA I KRNOVOThe Government has announced a public tender for the submissi<strong>on</strong> of bids for the c<strong>on</strong>structi<strong>on</strong> of windfarms and the lease of state owned land in Možura which is located in the municipality of Ulcinj and inKrnovo which is located in the Municipality of Nikšić.It is estimated that the wind farms in the Možura regi<strong>on</strong> will generate up to 46 MW. The wind farm inKrnovo is projected to generate up to 50 MW. Land for the c<strong>on</strong>structi<strong>on</strong> of these will be leased to successfulbidders by the state of M<strong>on</strong>tenegro for a period of 20 years. The deadline for the submissi<strong>on</strong> ofbids was 24 February <strong>2010</strong>.Agreement between M<strong>on</strong>tenegro and ItalyThe Ministry of Ec<strong>on</strong>omy and the Italian Ministry of Ec<strong>on</strong>omic Development have signed a memorandumof understanding with regard to the development of the energy sector in both their respectivecountries. The memorandum will serve as the basis for the cooperati<strong>on</strong> between the two in the field ofelectricity, natural gas and oil. There will be a particular focus <strong>on</strong> the development of electricity transmissi<strong>on</strong>capacities, renewable sources of energy and the improvement of energy efficiency.73The memorandum establishes a “Joint Commissi<strong>on</strong>” which is composed of both M<strong>on</strong>tenegrin and Italianrepresentatives and this will help promote the implementati<strong>on</strong> of the aims of the memorandum.This memorandum is especially relevant regarding the proposed c<strong>on</strong>structi<strong>on</strong> of an electricity cableinterc<strong>on</strong>necti<strong>on</strong> between Italy and M<strong>on</strong>tenegro which involves the c<strong>on</strong>structi<strong>on</strong> of a cable across theAdriatic Sea. This commenced in 2007 when the M<strong>on</strong>tenegrin EPCG and “Terna - Rete Elettrica Nazi<strong>on</strong>aleSpA” (“TERNA”), a major Italian energy transmissi<strong>on</strong> grid operator, entered into an agreement <strong>on</strong>the preparati<strong>on</strong> of a feasibility study. Pursuant to Ministry of Ec<strong>on</strong>omy, the value of the investment hasbeen estimated to be in the regi<strong>on</strong> of EUR 600 milli<strong>on</strong> which is to be invested by TERNA. Apart from theItalian investment, “Prenos a.d.”, company which is currently operating the M<strong>on</strong>tenegrin transmissi<strong>on</strong>grid, undertook to invest EUR 90 milli<strong>on</strong> for the further development and modernizati<strong>on</strong> of the M<strong>on</strong>tenegrintransmissi<strong>on</strong> grid. According to the Ministry of Ec<strong>on</strong>omy, It is expected that the project will becompleted by 2013.FOCUS ON ENERGYFuture ProjectsApart from the above menti<strong>on</strong>ed projects, the M<strong>on</strong>tenegrin <strong>Energy</strong> Development Strategy for 2025(the “<strong>Energy</strong> Strategy”) also proposes the following energy projects. To date, n<strong>on</strong>e of these have beencommenced. ityof 552 MW and an average annual producti<strong>on</strong> of 1,332 GWh. This system will c<strong>on</strong>sist of the HPP “Buk Bijela” and the HPP “Srbinje”. The combined potential capacityprojected by the <strong>Energy</strong> Strategy is estimated to be in the regi<strong>on</strong> of 552 MW and it is projectedthat it will have an average annual producti<strong>on</strong> of 1,350 GWh. However, due to envir<strong>on</strong>mental issuesthere is a possibility that this project may never get the green light. river Tara. It will have an estimated power capacity of 250 MW and an average annual producti<strong>on</strong>of 533 GWh. -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!