Major projects in Republika Srpska with respect to the building of new facilities are: and new block of TPP “Ugljevik”) 4 ; “Suceska”, “Paunci” and “Foca” where the tender applicati<strong>on</strong> for investors should be published during<strong>2010</strong>. This project will be coordinated with the Serbian government 5 ; network of water supply tunnels for the utilizati<strong>on</strong> of the hydro capacities; and 6 .In January <strong>2010</strong> the Government of FBIH announced and presented a series of projects named “Prioritiesfor the c<strong>on</strong>structi<strong>on</strong> of energy facilities in the FBIH” 7 . Investments in these projects are expected to amountto EUR 5 billi<strong>on</strong> and the Government of FBIH is interested in identifying partners for these investments.The projects listed include:58 8 . “Vinac”, “Han Skela”, “Ugar”, “Vrletna Kosa”, “Ivik”, “Babino Selo”, “Glavaticevo”and “Bjeilimici” 9 . 10 . jna”,and “Poklecani”) 11 .Natural GasOVERVIEWFOCUS ON ENERGYThe gas infrastructure in BIH is not very developed and includes <strong>on</strong>ly 191 km of gas pipeline. There are <strong>on</strong>lytwo urban areas with a gas supply network. Legislati<strong>on</strong> in the two main entities differs as RS has a newlyadopted the Law <strong>on</strong> Gas while the FBIH still does not have a specific law, but has issued a Decree <strong>on</strong> GasSector Regulati<strong>on</strong> 12 which is described in greater detail below.GAS / RSUnlike the FBIH, trade in the natural gas sector in the RS is based <strong>on</strong> the principles of an open and freemarket.Qualified c<strong>on</strong>sumers have the right to buy natural gas <strong>on</strong> the free market without requesting anypermit from the RCERS. There are two types of c<strong>on</strong>sumers, qualified and tariff c<strong>on</strong>sumers. A qualifiedc<strong>on</strong>sumer is a natural gas c<strong>on</strong>sumer that has the right to choose who it will buy the gas from (“QualifiedC<strong>on</strong>sumer”). Qualified C<strong>on</strong>sumers buy natural gas <strong>on</strong> the free market. Any c<strong>on</strong>sumer can have the statusof a Qualified C<strong>on</strong>sumer regardless of whether it is engaged in the transport or distributive network; this isbased <strong>on</strong> a c<strong>on</strong>sumer’s annual gas c<strong>on</strong>sumpti<strong>on</strong> as specified by the RCERS. All natural gas c<strong>on</strong>sumers, savefor households, have had Qualified C<strong>on</strong>sumer status since 1 January 2008. All the natural gas c<strong>on</strong>sumerswithin the household category will have the status of Qualified C<strong>on</strong>sumers from 1 January 2015.The purchase of natural gas abroad is permitted in the RS for companies holding the necessary licenses issuedby the RCERS. Natural gas prices are regulated and are publicly available. These prices are determinedby the supplier and based <strong>on</strong> the methodology and tariff system of the RCERS 13 . Since there has been no4 TPP Stanari (the c<strong>on</strong>cessi<strong>on</strong> was granted to the <strong>Energy</strong> Financing Team) should be c<strong>on</strong>structed in next five years and will have installed capacity of410 MW. Installed capacities of new blocks of TPPs Gacko and Ugljevik should be 1320 MW.5 Installed capacity for these HPPs <strong>on</strong> Uper Drina River is around 250 MW.6 Studies identified 120 potential locati<strong>on</strong>s for small HPPs with total installed capacity 340 MW7 Source: http://www.fbihvlada.gov.ba8 Installed capacity for these TPPs is more than 2000 MW9 Installed capacity for these HPPs is 455 MW10 Installed capacity for these small HPPs is 66 MW11 Installed capacity for these WPPs is 270 MW12 The Decree <strong>on</strong> the organizati<strong>on</strong> and regulati<strong>on</strong> of gas sector ec<strong>on</strong>omy (Official Gazette of the FBIH no. 83/07)13 The Rule <strong>on</strong> Tariff Methodоlogy in the System of Transport, Distributi<strong>on</strong>, Storage and Supply of Natural Gas (Official Gazzete of the Republic ofSrpska No. 9/09)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!