12.07.2015 Views

Focus on Energy, 2010 - Karanovic & Nikolic

Focus on Energy, 2010 - Karanovic & Nikolic

Focus on Energy, 2010 - Karanovic & Nikolic

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

and valid under the law, is c<strong>on</strong>sidered by the Government for a maximum 30 days from the date of submissi<strong>on</strong>.At a proposal by the MoE, the Government enacts a decisi<strong>on</strong> regarding the authorizati<strong>on</strong> for thec<strong>on</strong>structi<strong>on</strong> of a new power producti<strong>on</strong> plant.The very c<strong>on</strong>structi<strong>on</strong> of power plants is regulated under the Law <strong>on</strong> C<strong>on</strong>structi<strong>on</strong>, published in the OfficialGazette of Maced<strong>on</strong>ia no. 130/2009 (the “C<strong>on</strong>structi<strong>on</strong> Law”), dividing various energy c<strong>on</strong>structi<strong>on</strong>s inthree different categories, presented in the table below.FIRST CATEGORYNuclear PP, thermal and hydro PP with an installed capacity over 10MW, power transmissi<strong>on</strong> lineswith voltagelevel over 110kV, oil pipelines, product pipelines, major gas pipelinesSECOND CATEGORYThermal and hydro PP with an installed capacity between 1 and 10MW, c<strong>on</strong>structi<strong>on</strong>s for powerproducti<strong>on</strong> using renewable resources with an installed capacity over 1MW, power transmissi<strong>on</strong> lineswith voltagelevel between 35 and 110kV, transformer substati<strong>on</strong>s over 35kV, municipality main gasnetworks, c<strong>on</strong>structi<strong>on</strong>s with energy producti<strong>on</strong> capacities52THIRD CATEGORYThermal and hydro PP with an installed capacity up to 1MW, with wind turbines, c<strong>on</strong>structi<strong>on</strong>s forthe producti<strong>on</strong> of electricity using renewable resources with an installed capacity up to 1MW, powertransmissi<strong>on</strong> lines with voltage level between 10 and 35kVFOCUS ON ENERGYThe c<strong>on</strong>structi<strong>on</strong>s listed in the first and sec<strong>on</strong>d categories are treated as being in the public interest. TheMinistry of Envir<strong>on</strong>ment and Physical Planning of Maced<strong>on</strong>ia (“MoEPP”) is authorized to issue all requiredpermits regarding the c<strong>on</strong>structi<strong>on</strong> of the menti<strong>on</strong>ed structures. The third category of structures are locallymanaged under the C<strong>on</strong>structi<strong>on</strong> Law. Accordingly, building permits are issued by the local self-governments.Oil and gasRegarding oil and gas regulatory rules, the <strong>Energy</strong> Law prescribes the different energy activities that entitiescan perform (presented in the table below). These provisi<strong>on</strong>s of the <strong>Energy</strong> Law also prescribe the obligati<strong>on</strong>sand authorizati<strong>on</strong>s of the performers of such activities.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!