12.07.2015 Views

Focus on Energy, 2010 - Karanovic & Nikolic

Focus on Energy, 2010 - Karanovic & Nikolic

Focus on Energy, 2010 - Karanovic & Nikolic

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

many announcements regarding oil pipeline projects (AMBO, east-west corridor, south-north corridor),but so far the <strong>on</strong>ly pipeline in Maced<strong>on</strong>ia is the Thessal<strong>on</strong>iki – Skopje pipeline, built by “Hellenic Petroleum”in the late 1990s’. Since 1999, the Greek nati<strong>on</strong>al company also owns the <strong>on</strong>ly refinery in thecountry (“Okta a.d.”). 7Regarding the oil product market, “Okta a.d.” is the <strong>on</strong>ly domestic producer. The 28-year-old refineryis using old technology and this impacts heavily <strong>on</strong> the surrounding envir<strong>on</strong>ment. In the near future,the refinery will have to be modernized, especially with regards to its compliance with envir<strong>on</strong>mentalregulati<strong>on</strong>s.Russian “Lukoil” has entered the market recently, and currently operates 10 modern outlets. The companyintends to open another 30 during the next couple of years, becoming the most significant competitorin the supply of domestic oil products (competing with both “Okta a.d.” and “Makpetrol” a.d.).There have been no announcements of new projects, but projects <strong>on</strong> pipeline corridors that route troughMaced<strong>on</strong>ia will remain as a strategic objective for the future. As the transportati<strong>on</strong> infrastructure isunderdeveloped (particularly the railways to Serbia and Bulgaria), this is further limiting the possibilitiesfor the development of the regi<strong>on</strong>.Coal46Coal mining is essential to the country’s energy security seeing as coal is the primary fuel for electricityproducti<strong>on</strong> in Maced<strong>on</strong>ia. Two open-pit mines “Suvodol” and “Brod-Gneotino” are providing fuel for over98% of the domestic TPP electricity producti<strong>on</strong>. The state electricity producer ELEM operates the minesthat supply the “Bitola” and “Oslomej” TPPs, with up to 8 Mt of lignite per year. The feasibility studiesc<strong>on</strong>ducted over the last 10 years show that there are possibilities for new lignite mining, and accordingto ELEM, there are plans to open new mines in the regi<strong>on</strong> of Mariovo in central Maced<strong>on</strong>ia. This project,currently <strong>on</strong>ly in its preparati<strong>on</strong> stage, also envisages a TPP with an installed capacity of 300 MW.FOCUS ON ENERGYInvestments in the sector are both expected and very important, c<strong>on</strong>sidering the significance of the coalfor the domestic electricity generati<strong>on</strong>. Currently, the “Bitola” TPP’s mine “Suvodol” is using the last ofits reserves. Together with the producti<strong>on</strong> of the other lignite mine “Brod-Gneotino” (which is estimatedto be producing 2 Mt per year), the total coal producti<strong>on</strong> is <strong>on</strong>ly sufficient to serve the TPPs until 2025.This fact is c<strong>on</strong>cerning and should either result in immediate plans for projects with new capacities orin significant changes regarding the energy strategies for the future of Maced<strong>on</strong>ia’s domestic electricityproducti<strong>on</strong>.District Heating SystemThere are five district heating (“DH”) systems in Maced<strong>on</strong>ia, 3 of which are in the capital Skopje, with<strong>on</strong>e each in the towns of Bitola and Maked<strong>on</strong>ska Kamenica. The major DH system in Skopje is ownedand operated by JSC “Toplifikacija a.d.” 8 with approximately 40,000 households served. Producti<strong>on</strong> capacities(560 MW installed power) 9 are fuelled by heavy fuel (mazute) and to a lesser extent by naturalgas. The other 4 systems are significantly smaller, together serving fewer households than the Skopje DHmain system. The ERC presents the DH prices and regulates the market in general.The domestic company “Toplifikacija a.d.”, together with the Russian company “Sintez” invested in theEUR 137 milli<strong>on</strong> CHP plant project (referred to in the Natural Gas secti<strong>on</strong> above). This plant is going tochange the fact that all DH systems to date are using inefficient heat-<strong>on</strong>ly boiler technology. The newcombined plant will produce 350 GWh of thermal energy and is supposed to set the CHP facility as amodel for the future development of the subsector.7 Read more <strong>on</strong> “Okta a.d.” in the “Participants” part8 Toplifikacija a.d.from Skopje is private company, c<strong>on</strong>trolled by Slovenian group9 Toplifikacija a.d.’s web site: http://toplif.com.mk/home.htm

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!