12.07.2015 Views

Focus on Energy, 2010 - Karanovic & Nikolic

Focus on Energy, 2010 - Karanovic & Nikolic

Focus on Energy, 2010 - Karanovic & Nikolic

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Status: The procedure for the granting of a c<strong>on</strong>cessi<strong>on</strong> was put <strong>on</strong> hold following an announcement bythe MoE <strong>on</strong> 24 September 2009. Only <strong>on</strong>e bidder had submitted the c<strong>on</strong>cessi<strong>on</strong> documentati<strong>on</strong> underthe given prec<strong>on</strong>diti<strong>on</strong>s of the project. It is likely that in the coming period, the MoE will amend theseprec<strong>on</strong>diti<strong>on</strong>s in order to attract more potential investors to participate in the bid.Small HPP ProjectThe Government’s small hydro plants project c<strong>on</strong>tinues in <strong>2010</strong> with the approval of 5 new c<strong>on</strong>cessi<strong>on</strong>agreements for the development of such plants. According to the agreements, 5 new small plantsare planned to be erected at locati<strong>on</strong>s in Maced<strong>on</strong>ia, with a total annual power producti<strong>on</strong> of 13.37GWh. The Minister for the Ec<strong>on</strong>omy, Fatmir Besimi declared that the investments should not be seenas investments <strong>on</strong>ly, but as l<strong>on</strong>g-term soluti<strong>on</strong>s of the state’s increasing need for new and clean energysources.A study 4 <strong>on</strong> the development of small hydro plants envisages the establishment of as many as 400 plantsthroughout the territory of Maced<strong>on</strong>ia. The total installed power of these plants is estimated to be in theregi<strong>on</strong> of 250 MW and the expected annual producti<strong>on</strong> is set at approximately 1,200 GWh. The MoEhas signed 28 c<strong>on</strong>cessi<strong>on</strong> agreements so far, all of which are based <strong>on</strong> the DBOT model (Design, Build,Operate and Transfer). The statement of the MoE says that the preparati<strong>on</strong>s for an internati<strong>on</strong>al publicannouncement <strong>on</strong> 36 new locati<strong>on</strong>s with a total installed capacity of 20 MW have already started.44The Government announced a public call <strong>on</strong> 15 February <strong>2010</strong> to attract bids for the granting of a waterc<strong>on</strong>cessi<strong>on</strong> regarding the generati<strong>on</strong> of electric energy from 36 small hydro power plants (each with anindividual installed power producti<strong>on</strong> capacity of 5 MW). They are to be built and operated <strong>on</strong> the riverbasins Vardar, Strumica and Crn Drim. The deadline for the return of the completed tender documentati<strong>on</strong>was the 15 March <strong>2010</strong> 5 .FOCUS ON ENERGY4 Study performed by the Skopje University in 1981 in order to identify possible sites for the development of small hydro power plants.5 Source: Public Call for collecting bids for the granting of water c<strong>on</strong>cessi<strong>on</strong> for electric energy generati<strong>on</strong> from 36 small hydro power plants, published<strong>on</strong> 15 February <strong>2010</strong> by the Ministry of Ec<strong>on</strong>omy of RM.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!