12.07.2015 Views

Focus on Energy, 2010 - Karanovic & Nikolic

Focus on Energy, 2010 - Karanovic & Nikolic

Focus on Energy, 2010 - Karanovic & Nikolic

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CURRENT PROJECTSIt has been 22 years since the last c<strong>on</strong>structi<strong>on</strong> of a TPP in Maced<strong>on</strong>ia. There have been some announcementsof new projects, mostly for the hydro sector. The experts are unanimous that the c<strong>on</strong>structi<strong>on</strong> ofnew capacities is an essential need that must be satisfied as so<strong>on</strong> as possible. TPP projects are not envisagedfor the near future because of the lack of serious strategy regarding the matter and the low energyvalue of the lignite excavated in Maced<strong>on</strong>ia. On the other hand, there are <strong>on</strong>going and future projects inthe hydro energy sector, which are briefly presented below:HPP Chebren and GalishteScope of the project: A c<strong>on</strong>cessi<strong>on</strong> for the generati<strong>on</strong> of electricity from the HPP’s “Chebren” and “Galishte”,both located <strong>on</strong> the Crna River will be granted. Subject to this public appeal is a public venturefor the executi<strong>on</strong> of an investment project for the c<strong>on</strong>structi<strong>on</strong> of two new hydro power plants and themanagement of the existing HPP “Tikvesh” by the c<strong>on</strong>cessi<strong>on</strong>aire and ELEM, pursuant to the tenderdocumentati<strong>on</strong>.Investment value: total of approx. EUR 539 milli<strong>on</strong>Status: The Government of Maced<strong>on</strong>ia (the “Government”) signed a c<strong>on</strong>sultati<strong>on</strong> agreement with theInternati<strong>on</strong>al Financial Corporati<strong>on</strong> (“IFC”). The IFC services should improve the feasibility of the project,satisfying certain fundamental c<strong>on</strong>diti<strong>on</strong>s that investors would expect in order for them to be interestedin this project. The bid call was closed <strong>on</strong> 15 October 2009. Companies interested in participatingin the biding were:43RWE - Germany & HSE - Slovenia (Joint Venture)VERBUND - AustriaENEL SpA - ItalyVardar Valley ProjectScope of the project: This project envisages the c<strong>on</strong>structi<strong>on</strong> of 12 HPPs, all situated <strong>on</strong> the biggest riverin Maced<strong>on</strong>ia, the Vardar. The total installed power is planned to be approximately 325 MW. The Maced<strong>on</strong>ianMinistry of Ec<strong>on</strong>omy (“MoE”) issued a memorandum <strong>on</strong> the project, stating the basic characteristicsof each HPP and detailing the envir<strong>on</strong>mental and climate circumstances of the Vardar basin.FOCUS ON ENERGYInvestment value: Since the project is in its first phase of planning, this informati<strong>on</strong> is unavailable at themoment.Status: The Government announced pre-qualificati<strong>on</strong> procedures for participants regarding the projectsin both 2008 and 2009. The whole project is still in preliminary-design stage although there are moredeveloped plans for the two biggest HPPs, “Gradec” and “Veles”3.HPP Boshkov MostScope of the project: A c<strong>on</strong>cessi<strong>on</strong> for the building, operating, and transfer of HPP “Boshkov Most”.The locati<strong>on</strong> for HPP “Boshkov Most” is located in the western part of Maced<strong>on</strong>ia, close to the town ofDebar.Investment value: EUR 70 milli<strong>on</strong>3 In accordance with the informative memorandum <strong>on</strong> the Vardar Valley Project, issued by the MoE

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!