12.07.2015 Views

Focus on Energy, 2010 - Karanovic & Nikolic

Focus on Energy, 2010 - Karanovic & Nikolic

Focus on Energy, 2010 - Karanovic & Nikolic

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

36FOCUS ON ENERGYments with respect to the envir<strong>on</strong>mental protecti<strong>on</strong>, c<strong>on</strong>sumer protecti<strong>on</strong>, competiti<strong>on</strong> of the market,etc.). The KRO is obliged to pass an annual report <strong>on</strong> its work to the Kosovo Government.The c<strong>on</strong>structi<strong>on</strong> of a new generating capacity, new gas transmissi<strong>on</strong> and distributi<strong>on</strong> networks and directpipelines for the transit of gas in Kosovo may be obtained through two separate procedures. There is anauthorizing procedure and a tender procedure. The authorizing procedure is basically obtained if the interestedsubject meets the below listed criteria for the issuance of a license. The tender procedure <strong>on</strong>ly takesplace if the authorizing procedure has failed.Licenses for the transfer, accumulati<strong>on</strong>, supply, trade, and cross border transit of gas may be obtained byan energy company that holds a license issued by the REOK. The two required licenses can be obtained followingan 80 day procedure which results in the granting of <strong>on</strong>e license for the whole territory of Kosovofor the transmissi<strong>on</strong> network operator of gas; and a sec<strong>on</strong>d license for a distributi<strong>on</strong> network operator ofnatural gas covering each distinct territory in Kosovo.The energy company must meet certain general criteria in order to obtain such licenses. It must:1. Possess a sufficient level of technical and financial capabilities; have sufficient material and humanresources and it must have the requisite organizati<strong>on</strong>al structure for meeting the regulatory requirementsunder the license;2. Hold property rights over (or a legal right to use) the energy facilities needed to perform the activity;3. Provide evidence that the energy facilities meet the requisite safety and envir<strong>on</strong>mental protecti<strong>on</strong>requirements;

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!