12.07.2015 Views

Focus on Energy, 2010 - Karanovic & Nikolic

Focus on Energy, 2010 - Karanovic & Nikolic

Focus on Energy, 2010 - Karanovic & Nikolic

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Public EnterprisesPUBLIC ENTERPRISE “ELEKTROPRIVREDA SRBIJE” (“EPS”)EPS is currently the <strong>on</strong>ly producer of electricity in Serbia. Through five of its fully-owned subsidiaries, EPScurrently operates the entire natural infrastructure for the producti<strong>on</strong> of electricity.EPS operates the nati<strong>on</strong>al distributi<strong>on</strong> grid through five fully-owned subsidiaries. These are in charge ofthe operati<strong>on</strong> of the distributi<strong>on</strong> networks located in five of the regi<strong>on</strong>al centres in Serbia: Belgrade, NoviSad, Niš, Kragujevac and Kraljevo.In additi<strong>on</strong>, EPS manages two mining basins for the excavati<strong>on</strong> of lignite coal - Kostolac and Kolubara (providingthe supply of coal for the thermo power plants) mostly used by TPP “Kolubara” 1 and TPP “Nikola Tesla” 2 .The privatizati<strong>on</strong> of EPS has l<strong>on</strong>g been <strong>on</strong> the agenda of the Serbian Government but so far, there wereno c<strong>on</strong>crete movements towards the realizati<strong>on</strong> of this plan. The prevailing opini<strong>on</strong> of the experts andthe investment community is that EPS will be ready for the privatizati<strong>on</strong> process <strong>on</strong>ly after it has beenrenovated and <strong>on</strong>ly after the full liberalizati<strong>on</strong> of the energy market and the reform of the energy regulatoryframework.PUBLIC ENTERPRISE “ELEKTROMREŽA SRBIJE” (“EMS”)26EMS operates the nati<strong>on</strong>al transmissi<strong>on</strong> grid system and is the operator of the organized market for electricalenergy. In its capacity as the operator of the transmissi<strong>on</strong> grid, EMS decides <strong>on</strong> third-party accessand c<strong>on</strong>necti<strong>on</strong> to the transmissi<strong>on</strong> grid and it is also resp<strong>on</strong>sible for the allocati<strong>on</strong> of the cross-bordertransmissi<strong>on</strong> capacities. As the market operator, EMS is also resp<strong>on</strong>sible for the issuance of the rules ofoperati<strong>on</strong> of the electricity market governing the trade of electricity <strong>on</strong> the organized market.FOCUS ON ENERGYPUBLIC ENTERPRISE “SRBIJAGAS”“Srbijagas” manages the nati<strong>on</strong>al infrastructure for the transportati<strong>on</strong> and distributi<strong>on</strong> of natural gas. Inits capacity as the operator of the natural gas transportati<strong>on</strong> and distributi<strong>on</strong> systems, “Srbijagas” shouldissue the transportati<strong>on</strong> and distributi<strong>on</strong> network rules of operati<strong>on</strong> which should govern the technicalterms for the c<strong>on</strong>necti<strong>on</strong> and use of the transportati<strong>on</strong> and distributi<strong>on</strong> systems. To date, no such ruleshave been issued.Aside from the transportati<strong>on</strong> and the distributi<strong>on</strong> of natural gas, “Srbijagas” should also act as the operatorof the natural gas storage facilities. Whilst it is supplied with the relevant licenses, “Srbijagas” is notyet effectively c<strong>on</strong>ducting this activity as it has not yet finalized the c<strong>on</strong>structi<strong>on</strong> of its gas storage facility“Banatski Dvor” in Vojvodina.PUBLIC ENTERPRISE “TRANSNAFTA”“Transnafta” operates the nati<strong>on</strong>al oil pipeline system. As the operator of the oil transportati<strong>on</strong> system“Transnafta” should issue the oil pipeline grid code which should prescribe, am<strong>on</strong>gst other things, theterms governing third-party access, as well as technical terms for the c<strong>on</strong>necti<strong>on</strong> to the pipeline system.“Transnafta” has not yet issued the transportati<strong>on</strong> system grid code. “Transnafta” also holds the licensefor the oil products pipeline but this pipeline has not yet been c<strong>on</strong>structed.1 TPP “Kolubara” is located at the edge of Kolubara coal basin in the village Veliki Crljen, and is operated by EPS. The total installed capacity of its fiveunits amounts to 245 MW.2 TPP Nikola Tesla, with its two units TENT A and TENT B, is a power plant complex operated by EPS, located <strong>on</strong> the right bank of the river Sava,approximately 40 km upstream from Belgrade, near the town of Obrenovac. By far the largest in Serbia, the complex generates around 16 TWh annually,which covers almost half of Serbia’s needs for electricity.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!