12.07.2015 Views

Focus on Energy, 2010 - Karanovic & Nikolic

Focus on Energy, 2010 - Karanovic & Nikolic

Focus on Energy, 2010 - Karanovic & Nikolic

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

in the Kolubara and Kostolac basins. The opening of new mines facilitating the supply of coal t<strong>on</strong>ew TPPs. The C<strong>on</strong>structi<strong>on</strong> of TPPs which will use imported fuels, primarily imported gas, and therec<strong>on</strong>structi<strong>on</strong> of existing power plants.combined producti<strong>on</strong> of both heat and electricity.ily,thermal power plants. The <strong>Energy</strong> Program envisages that the EPS should allocate around EUR1.2 billi<strong>on</strong> for these purposes.energy sector will require investments in the modernizati<strong>on</strong>, revitalizati<strong>on</strong>, improvement and theextensi<strong>on</strong> of the electric power transmissi<strong>on</strong> grid which is currently outdated. Its capacities are becomingincreasingly insufficient to cover the domestic c<strong>on</strong>sumpti<strong>on</strong> of electricity which is expectedto increase in the coming years.PROJECTSGerman company RWE AG (“RWE”). This lays a foundati<strong>on</strong> for the cooperati<strong>on</strong> between the twoparties in the c<strong>on</strong>structi<strong>on</strong> of the hydropower plant “Djedrap III” 1 and the cascade HPPs <strong>on</strong> the riverMorava and the river Drina which are located <strong>on</strong> the border with the Republic of Srpska. The estimatedvalue of this investment is EUR 5 billi<strong>on</strong>.19structi<strong>on</strong>of the thermal power plants Kolubara B 2 and TENT B3 3 . The estimated value of investmentis EUR 1.6 billi<strong>on</strong>.cooperati<strong>on</strong> between the two countries in the development of new capacities for the producti<strong>on</strong> ofelectricity from renewable sources of energy. This included the c<strong>on</strong>structi<strong>on</strong> of hydropower plants<strong>on</strong> the rivers Ibar, Drina and Sava (with a total estimated power potential of 589.2 MW) and smallHPPs and wind farms (with a total estimated power potential of 500 MW). In November 2009, theSerbian Ministry of Mining and <strong>Energy</strong> and the Italian Ministry of Ec<strong>on</strong>omic Development and theItalian Ministry for Envir<strong>on</strong>ment and Protecti<strong>on</strong> of the Land and Sea, signed two agreements whichset out the foundati<strong>on</strong> for the establishment of a system for mutual recogniti<strong>on</strong> of green certificates,the cooperati<strong>on</strong> of the nati<strong>on</strong>al transmissi<strong>on</strong> grid operators in the improvement of the Serbiansystem for the transmissi<strong>on</strong> of energy, and the development of interc<strong>on</strong>necti<strong>on</strong>s between theSerbian transmissi<strong>on</strong> grid and the transmissi<strong>on</strong> grids of the neighbouring countries. In June 2009,nati<strong>on</strong>al producers of energy, Serbian EPS and the Italian company “Seci Energia S.p.A” signed apreliminary agreement <strong>on</strong> the cooperati<strong>on</strong> between the companies regarding the c<strong>on</strong>structi<strong>on</strong> ofHPPs <strong>on</strong> the river Ibar and the river Sava (and the possible extensi<strong>on</strong> of the project to HPPs <strong>on</strong> theriver Drina).FOCUS ON ENERGYthe Chinese Nati<strong>on</strong>al Corporati<strong>on</strong> for the Import and Export of Machinery signed a protocol <strong>on</strong> thecooperati<strong>on</strong> between the two companies in a USD 1.2 billi<strong>on</strong> project for the revitalizati<strong>on</strong> of units1 Plans for the c<strong>on</strong>structi<strong>on</strong> of the third reversible HPP “Djerdap III” <strong>on</strong> the Danube river were developed back in the seventies but these plans wereeventually aband<strong>on</strong>ed. The estimated installed power of “Djerdap III” is some 2400 MW and if c<strong>on</strong>structed it would double the producti<strong>on</strong> of electricityin Serbia. The estimated cost of c<strong>on</strong>structi<strong>on</strong> is somewhere in the regi<strong>on</strong> of EUR 6 billi<strong>on</strong>.2 The TPP “Kolubara B” with an installed power of 2x350 MW is located some 40 km southwest of Belgrade, near to the Kolubara coal basin. Itsc<strong>on</strong>structi<strong>on</strong> started back in 1984 but due to the break-out of war in ex-Yugoslavia, it was never finished. The estimated value of the investment neededto complete the TPP “Kolubara B” is EUR 600 milli<strong>on</strong>.3 The new unit of the TPP “Nikola Tesla” with the installed power of 700 MW located <strong>on</strong> the right bank of the river Sava, 50 km upstream of Belgrade.The estimated value of the investment in the c<strong>on</strong>structi<strong>on</strong> of TPP TENT B3 is EUR 900 milli<strong>on</strong>.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!