12.07.2015 Views

Section 2 i) Initial Research Work - Gewerbliche Schule Ravensburg

Section 2 i) Initial Research Work - Gewerbliche Schule Ravensburg

Section 2 i) Initial Research Work - Gewerbliche Schule Ravensburg

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Fort Vale Engineering is a world leader inthe precision manufacture of the valves and fittings for transportation in theroad tanker and tank container industries. The headquarters andmanufacturing plant are based in Lancashire where it employs 240 people.With an annual energy bill of more than £240,000 and an energy contract upfor renewal which predicted price increases of 20%, the company wasprompted to consider a change in direction in how energy was managed.<strong>Initial</strong> advice from the Carbon Trust highlighted potential savings of nearly£45,000 and 392 tonnes of carbon dioxide across their three Lancashire sites.Impact• Through the implementation of a range of energy savingimprovements suggested by both employees and the Carbon TrustFort Vale reduced electrical energy use by 18%• Fort Vale has saved 308 tonnes of carbon dioxide across its Lancashiresites• Efforts to save energy have been catalyst in raising everyone’senvironmental awareness in the company and have demonstratedthat each and every small effort can make a difference to the businessand to a sustainable environment for the future.An example of an engineering environmental improvement scheme.8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!