12.07.2015 Views

Section 2 i) Initial Research Work - Gewerbliche Schule Ravensburg

Section 2 i) Initial Research Work - Gewerbliche Schule Ravensburg

Section 2 i) Initial Research Work - Gewerbliche Schule Ravensburg

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Waste typeWeight (tonnes)General waste 597.85Timber/wood 39.25Special case wastes 223.82Scrap metal 50.00Cardboard 39.48Paper 6.22WEEE 13.10Plastic 1.10Hazardous waste 7474) Are you actively trying to reduce waste?Yes we have a program in place to target both our own internal systems and oursupply chain to reduce the amount of waste we generate.We are also looking to move ever more wastes away from Landfill and into formalrecycling streams. Our total site recycling % for non-hazardous waste is 65% (on-siteand off-site recycling). We are targeting an increase to around 80% in the next 12months.5) Can you find an alternative to using hazardous materials and chemicals?This is very difficult for our business as the engine manufacturer manuals dictate themethods and chemical used for each process.We are finding that the GE90 and the GP700 are both more modern in theirefficiency in flight and design but also in using cleaner technologies whenoverhauling. Fewer hazardous chemical are being used in these engines comparedto the RB211.44

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!