12.07.2015 Views

Noise and Vibration Report - Transnet

Noise and Vibration Report - Transnet

Noise and Vibration Report - Transnet

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ENVIRO-ACOUSTIC RESEARCHSCOPING NOISE REPORT – TRANSNET: SWAZI RAIL LINK – DAVEL YARD TO NERSTON RSA ROUTE4 POTENTIAL NOISE SOURCESIncreased noise levels are directly linked with the various activities associated with theconstruction of the railway line <strong>and</strong> infrastructure as well as the operational phase of theactivity. The specific activities relating to construction of the railway line will only beknown during the EIA phase of the project, <strong>and</strong> therefore will only be discussed in ageneralised manner in the following sections.Note that the most significant stage relating to noise is due to the operational phase <strong>and</strong>not the construction phase. This is due to the duration of activities during the constructionphase are generally short.4.1 POTENTIAL NOISE SOURCES: CONSTRUCTION PHASE4.1.1 Construction equipmentConstruction activities include:• Site establishment, including the development of a contractors camps at suitablelocations along the route;• Potentially the development <strong>and</strong> upgrading of access roads to allow the delivery ofequipment to railway line sections as well as maintenance access routes to railwaylines at future dates;• Site preparation e.g. advance fencing, geological survey, stripping of topsoil,material disposal;• Development of foundation <strong>and</strong> trenches (for laying of cables etc.)• Development of sub-structure (formation, sub-ballast <strong>and</strong> ballast), setting of thesleepers <strong>and</strong> laying of the tracks, turn-outs, railroad ties <strong>and</strong> foundation concretepouring; <strong>and</strong>• Building of buildings <strong>and</strong> refuelling stations at rail loops.The equipment likely to be required to complete the above tasks will typically include:• excavator/grader, bulldozer, dump trucks, vibratory roller, bucket loader, rockbreaker, (potentially) drill rig, excavator/grader, bulldozer, dump truck, flat bedtrucks, concrete truck(s), pile driver, cranes, fork lift <strong>and</strong> various 4WD <strong>and</strong> servicevehicles.The level <strong>and</strong> character of the construction noise will be highly variable as differentactivities with different equipment take place at different times, for different periods ofP a g e | 19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!