ENVIRO-ACOUSTIC RESEARCHSCOPING NOISE REPORT – TRANSNET: SWAZI RAIL LINK – DAVEL YARD TO NERSTON RSA ROUTE• WP3: The upgrade of the existing line between the proposed Davel Yard <strong>and</strong>Lothair.• WP4: The upgrade of the existing line between Sidvokodvo (Swazil<strong>and</strong>) <strong>and</strong>Phuzumoya (Swazil<strong>and</strong>). This also includes the construction of a new line in certainsections.• WP5: The upgrade of the existing line between Phuzumoya (Swazil<strong>and</strong>) <strong>and</strong> Golela(Swazil<strong>and</strong> – RSA border). This also includes the construction of a new line incertain sections.• WP6: The upgrade of the existing line between Golela (Swazil<strong>and</strong> – RSA border)<strong>and</strong> Nsese near Richards Bay. This also includes the construction of a new line incertain sections.This <strong>Noise</strong> Scoping report specifically focuses on the proposed Davel to Nerston sectionbased in the Republic of South Africa (refer Figure 1-2).The <strong>Transnet</strong> operation ideal envisages consolidation of loads into the maximum lengthsfor a single siding(s). Currently loads can vary in length from 40 wagon block loadsthrough 50 <strong>and</strong> 60 up to 75/80 <strong>and</strong> 100 wagon general freight trains. The upgrading <strong>and</strong>implementation of the proposed railway section will enable freight loads to exceed thecurrent capacities up to 150/160 <strong>and</strong> 200 wagon trains. The reverse (de-consolidation)has been planned for traffic returning from the export ports. Passing loops will beimplemented to allow traffic flow in both directions on the rail, passing loop specifications<strong>and</strong> locations are unknown for the purpose of this report (dead end, up <strong>and</strong> down workingetc). Potential diesel fuelling stations may be implemented at a rail loops enablingservicing of locomotives to their required destination.The proposed alignment rail line starts at the town of Davel traversing past the town ofLothair <strong>and</strong> on to the town of Nerston. Current rail operations terminate at Lothair. Thelinear distance from Davel to Nerston is estimated at roughly 113 km (rail line routedistance not calculated for this report).P a g e | 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!