12.07.2015 Views

Noise and Vibration Report - Transnet

Noise and Vibration Report - Transnet

Noise and Vibration Report - Transnet

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ENVIRO-ACOUSTIC RESEARCHSCOPING NOISE REPORT – TRANSNET: SWAZI RAIL LINK – DAVEL YARD TO NERSTON RSA ROUTE1 INTRODUCTION1.1 INTRODUCTION AND PURPOSEEnviro-Acoustic Research was commissioned to compile a Scoping <strong>Noise</strong> <strong>Report</strong> as part ofthe Environmental Impact Assessment process conducted for <strong>Transnet</strong>’s proposedSwazil<strong>and</strong> Rail Link project. This project involves the development of a multinationalstrategic rail corridor stretching from Davel in Mpumalanga to Richards Bay in KwaZuluNatal via Sidvokodvo in Swazil<strong>and</strong>. This particular report covers the potential noiseimpacts relating to the proposed Davel to Nerston (Republic of South Africa) railwaysection on a scoping level.This report is the result of a first phase study (desktop) on the potential noise impact thatthis development may have on the surrounding environment, highlighting methodologies,potential issues to be investigated as well as preliminary findings <strong>and</strong> recommendations.1.2 BRIEF PROJECT DESCRIPTION<strong>Transnet</strong> SOC Limited is proposing the development of a robust rail connection betweenLothair <strong>and</strong> the Komatipoort-Richards Bay route (refer Figure 1-1). This will provide aviable General Freight diversionary route to remove this traffic from the Mpumalanga CoalLine, freeing up slots for Coal Traffic. Further projects requirements include:• Providing a rail connection from Davel to Maputo via the Swazil<strong>and</strong> RailwayNetwork.• Enhancing capacity for the Komatipoort – Richards Bay railway corridor;accommodating traffic identified within the <strong>Transnet</strong> Long Term PlanningFramework <strong>and</strong> the prospective GFB traffic from the Coal Line.• Providing viable connections for rail freight from Western Swazil<strong>and</strong> to markets inSouth Africa, Mozambique, <strong>and</strong> overseas.• Providing viable connections for rail freight from South Africa to markets inSwazil<strong>and</strong>, Mozambique, <strong>and</strong> overseas via Maputo.The project is divided into 6 Work Packages (WP) for project implementationpurposes, namely:• WP1: The construction of a new rail link between Lothair (Mpumalanga) toSidvokodvo (Swazil<strong>and</strong>). Being a multinational project the work package is subdividedinto two sub-sections, namely Lothair to Nerston (RSA) <strong>and</strong> Nerston toSidvokodvo (Swazil<strong>and</strong>).• WP2: The construction of a new terminal <strong>and</strong> network links at Davel – known asDavel Yard <strong>and</strong> Connections.P a g e | 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!