12.07.2015 Views

Best Management Practices for Forest Road Construction and ...

Best Management Practices for Forest Road Construction and ...

Best Management Practices for Forest Road Construction and ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Forest</strong> <strong>Road</strong>sErosion from <strong>for</strong>est roads is the major source of sediment from<strong>for</strong>estry operations. Plan ahead! In order to ensure fairness toboth the logger <strong>and</strong> l<strong>and</strong>owner, the road system should be partof an overall <strong>for</strong>est management plan. Early planning will savetime <strong>and</strong> money as well as protecting water quality.<strong>Road</strong> planning involves decisions that are of concern to both thelogger <strong>and</strong> the l<strong>and</strong>owner. There<strong>for</strong>e, loggers <strong>and</strong> l<strong>and</strong>ownersshould plan together. Planning involves such factors as makingchoices between permanent <strong>and</strong> temporary roads, relocation <strong>and</strong>repair of existing roads, type <strong>and</strong> number of stream crossings,alternative access points, <strong>and</strong> the expected use of the roads bythe l<strong>and</strong>owner <strong>and</strong> logger.Existing <strong>Road</strong>s: Repair or Relocate?Many <strong>for</strong>ested tracts in Oklahoma already have existing roads.Use existing roads whenever possible. Un<strong>for</strong>tunately, many ofthese existing roads are eroding <strong>and</strong> have washed-out areas dueto lack of maintenance or bad location <strong>and</strong> design. Old roadsmay not meet present BMP guidelines <strong>for</strong> design or location. Ifexisting roads can be improved to meet current st<strong>and</strong>ards, theyshould be used, as new road construction or relocation of existingroads can be expensive <strong>and</strong> may cause significant erosion<strong>and</strong> sediment movement in the short term.Consider the effects of construction, continued use, <strong>and</strong> maintenancewhen making decisions as to whether to use existingroads or construct new ones.5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!