12.07.2015 Views

Best Management Practices for Forest Road Construction and ...

Best Management Practices for Forest Road Construction and ...

Best Management Practices for Forest Road Construction and ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

L<strong>and</strong>ingsDuring Harvest• Locate l<strong>and</strong>ings on well-drained, gently sloping ground.• Keep l<strong>and</strong>ings outside of SMZs <strong>and</strong> away from stream channels.• Slope the l<strong>and</strong>ing gently (1-2%) to allow <strong>for</strong> drainage whereneeded.• Avoid concentration of run-off downslope of the l<strong>and</strong>ing.• Prevent oil <strong>and</strong> fuel spills.After Harvest• Install a shallow ditch above the l<strong>and</strong>ing to divert run-off whereneeded.• When skidding <strong>and</strong> hauling is complete, grade out any rutsto <strong>for</strong>m a smooth surface.• Cover bare soil with slash.• Seed where necessary.26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!