Designing and Commissioning an Ultraviolet Light Disinfection ... Designing and Commissioning an Ultraviolet Light Disinfection ...
Acceptance of Checkpoint BioassayVelocity Measurements at Low Flow (Run A)• Hired WSU Water Research Center Researchers• Acoustic Doppler Velocimeter Measurements• Tests Designed per NWRI Guidelines• 0.3 m upstream of first bank• 0.3 m downstream of last bank• Cross-sections equally spaced• Not less than 3 x 3 grid per cross-section• Measurements 6 – 12 cm apart
Acceptance of Checkpoint BioassayVelocity Profile Measurement Selected Locations
- Page 1 and 2: DESIGNING & COMMISSIONING AN ULTRAV
- Page 3 and 4: Presentation Outline• Background
- Page 6 and 7: Water Reclamation Facilities Warden
- Page 8 and 9: Warden, WashingtonUV
- Page 10 and 11: Warden, WashingtonWarden UV Disinfe
- Page 12 and 13: Checkpoint BioassayWarden WRF Check
- Page 14 and 15: Checkpoint Bioassay Test Flow Schem
- Page 16 and 17: Checkpoint Bioassay Test Setup
- Page 18 and 19: Checkpoint Bioassay Test Results
- Page 22 and 23: Acceptance of Checkpoint BioassayAc
- Page 24 and 25: Acceptance of Checkpoint BioassayEx
- Page 26: Questions
Accept<strong>an</strong>ce of Checkpoint BioassayVelocity Measurements at Low Flow (Run A)• Hired WSU Water Research Center Researchers• Acoustic Doppler Velocimeter Measurements• Tests Designed per NWRI Guidelines• 0.3 m upstream of first b<strong>an</strong>k• 0.3 m downstream of last b<strong>an</strong>k• Cross-sections equally spaced• Not less th<strong>an</strong> 3 x 3 grid per cross-section• Measurements 6 – 12 cm apart