Checkpoint BioassayWarden WRF Checkpoint Bioassay – Target Test ConditionsFlow,No. Lamp LoadingRun Flow, % of UVT,Modules rate,ID mgd Design%On gpm/lampFlowA 0.07 5.8 % 55 2.0 0.61B 060 0.60 50.00 % 55 20 2.0 347 3.47C 0.86 71.2 % 55 3.0 3.73D 1.20 100 % 65 4.0 5.21Note: Low flow (0.07 mgd) set by influent pump station VFD
Checkpoint BioassayWRF Checkpoint Bioassay - Test Data SummaryMS-2 ModuleTest Power No.Avg. MS-2Test RunFlowRED Avg. MS-2UVT Draw ModulesREDDate ID(mgd)Stdev RED(%) (kW) ON(mJ/cm )(mJ/cm 2 ) (mJ/cm 2 )10-13-09 A 56.5 13.8 2.0 0.074 n/a n/a n/a10-13-09 B 56.6 20.8 3.0 0.60 134.3 2.13 44.810-12-09 C 56.1 27.9 4.0 0.87 122.3 3.24 30.610-12-09 D 65.5 23.7 3.4 1.19 103.1 1.60 30.3
- Page 1 and 2: DESIGNING & COMMISSIONING AN ULTRAV
- Page 3 and 4: Presentation Outline• Background
- Page 6 and 7: Water Reclamation Facilities Warden
- Page 8 and 9: Warden, WashingtonUV
- Page 10 and 11: Warden, WashingtonWarden UV Disinfe
- Page 14 and 15: Checkpoint Bioassay Test Flow Schem
- Page 16 and 17: Checkpoint Bioassay Test Setup
- Page 18 and 19: Checkpoint Bioassay Test Results
- Page 20 and 21: Acceptance of Checkpoint BioassayVe
- Page 22 and 23: Acceptance of Checkpoint BioassayAc
- Page 24 and 25: Acceptance of Checkpoint BioassayEx
- Page 26: Questions
Checkpoint BioassayWRF Checkpoint Bioassay - Test Data SummaryMS-2 ModuleTest Power No.Avg. MS-2Test RunFlowRED Avg. MS-2UVT Draw ModulesREDDate ID(mgd)Stdev RED(%) (kW) ON(mJ/cm )(mJ/cm 2 ) (mJ/cm 2 )10-13-09 A 56.5 13.8 2.0 0.074 n/a n/a n/a10-13-09 B 56.6 20.8 3.0 0.60 134.3 2.13 44.810-12-09 C 56.1 27.9 4.0 0.87 122.3 3.24 30.610-12-09 D 65.5 23.7 3.4 1.19 103.1 1.60 30.3