12.07.2015 Views

Council Minutes - Town of Cambridge

Council Minutes - Town of Cambridge

Council Minutes - Town of Cambridge

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

COUNCIL MINUTESTUESDAY 26 JUNE 2012Reinstatement Works ChargesThe Reinstatement Works Charges are used for advising builders/owners <strong>of</strong> typical costs forrepairing damage, preparing a quote for the works, and debiting the cost <strong>of</strong> works from theworks bond. If these rates are not relevant to a repair, then a specific quote is prepared andsent to the builder/owner for their acceptance. The builder/owner has the choice <strong>of</strong> acceptingthe <strong>Town</strong>’s quote or making their own arrangements to complete reinstatements.Crossover SubsidyPolicy No. 5.2.7 - Vehicle Crossovers – Specification requires the <strong>Town</strong> to contribute 50% <strong>of</strong> theconstruction cost <strong>of</strong> a standard crossover when it is the first crossover to a property. The<strong>Town</strong>'s "standard crossover" is 3.0 metres wide and 5.5 metres long. The contract rate for aconcrete crossover is $53.46 per square metre. Therefore, the 50% contribution equates toapproximately $81.00 (excl GST) per linear metre <strong>of</strong> a typical crossover measured from the kerbline.Park Access Fees and BondsThe Parks and Reserves Access fees and bonds allow developers and property owners toaccess the <strong>Council</strong>’s Parks and Reserves for building or renovation purposes. The access feecovers the cost <strong>of</strong> inspecting the site before, during and after works are completed. The WorksBond, if applicable, allows the <strong>Town</strong> to carry out any reinstatement works that the developerdoes not complete. Some minor increases are proposed in 2012/13 to cover Administrationscosts.Verge SecurityThis schedule <strong>of</strong> fees is now included in the Development and Sustainability Fees and Charges.The fees and charges as listed in the 2011/2012 Budget and proposed for the 2012/2013Budget are listed below.ROAD RESERVES – Works Bonds, Charges and SubsidiesResidential and Commercial Developments (For repair/reinstatement/cleaning <strong>of</strong> kerb, footpath, lane,street tree, drainage, road, signs or verge).(One bond per development or applicant).DescriptionResidential & Commercial Developments(a) $0 to $20,000• Works Bond• Administration Fee(b) $20,001 to $150,000• Works Bond• Administration Fee(c) $150,001 to $500,000• Works Bond• Administration FeeCurrent Fee2011/2012(Ex GST)$0$50$700$100$700$150Proposed Fee2012/2013(Ex GST)$0$50$700$50$700$50GSTApplicableYes/NoNoYesNoYesNoYesFeePayable$0$55$700$55$700$55H:\CEO\GOV\COUNCIL MINUTES\12 MINUTES\JUNE 2012\C CR.DOCX 79

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!