12.07.2015 Views

Council Minutes - Town of Cambridge

Council Minutes - Town of Cambridge

Council Minutes - Town of Cambridge

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

COUNCIL MINUTESTUESDAY 26 JUNE 2012CR12.74SALVADO ROAD - RESURFACING - MRRG CONTRIBUTION TO CITY OFSUBIACOPURPOSE OF REPORT:To consider a request from the City <strong>of</strong> Subiaco for a budget contribution for the resurfacing <strong>of</strong>two sections <strong>of</strong> Salvado Road.BACKGROUND:The City <strong>of</strong> Subiaco has received a Metropolitan Regional Road Grant (MRRG) fundingapproval in the 2012/2013 allocations from Main Roads WA to carry out bitumen asphaltresurfacing works in Salvado Road, from Station Street to Harborne Street and from DentonStreet to Jersey Street.As Salvado Road is a boundary road between the City <strong>of</strong> Subiaco and the <strong>Town</strong> <strong>of</strong> <strong>Cambridge</strong>,a request has been received for a contribution from the <strong>Town</strong> for one half <strong>of</strong> the costs <strong>of</strong>construction not accommodated by the MRRG grant, which covers two thirds <strong>of</strong> the total cost.DETAILS:The funding for resurfacing <strong>of</strong> the two sections <strong>of</strong> Salvado Road has been granted to addressthe signs <strong>of</strong> distress within the pavement, which if left untreated, would in time lead to totalfailure and the need for complete reconstruction.The road sections had a visual assessment carried out in accordance with the Guidelines forthe Submission <strong>of</strong> Road Rehabilitation Projects 2011, which indicated extensive rutting,cracking and depressions. Felling Weight Deflectometer (FWD) testing was also undertakenfor each.Based on the results <strong>of</strong> these inspections and tests, the following works are proposed to becarried out to rehabilitate the pavement in the two sections <strong>of</strong> Salvado Road.1. Station Street to Harborne Street - project length 340 metres, width 14 metres. Millsurface and rework underlying base to improve shape and resurface with 30mm SMAasphalt 10mm mix - $286,212.2. Denton Street to Jersey Street - select locations within the project length 530 metres,width 12 metres. Mill surface at selected locations only and resurface with 30mm SMAasphalt 10mm mix - $59,236.It is acknowledged that currently both <strong>Council</strong>s are jointly formulating plans for a cycle path onthe southern side <strong>of</strong> Salvado Road. The location <strong>of</strong> the path is not within the proposed roadresurfacing area and only the current parking bays will be affected.The total cost <strong>of</strong> the works has been estimated by the City <strong>of</strong> Subiaco at $345,448 which is tobe funded $230,290 from the MRRG grant and $115,150 from the two local authorities. Thecontribution requested by the City <strong>of</strong> Subiaco from the <strong>Town</strong> <strong>of</strong> <strong>Cambridge</strong> is $57,575 which isone half <strong>of</strong> the total Subiaco <strong>Council</strong> contribution required as a condition <strong>of</strong> the MRRG fundinggrant.H:\CEO\GOV\COUNCIL MINUTES\12 MINUTES\JUNE 2012\C CR.DOCX 74

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!