Crane & Lifting standardisation
Crane & Lifting standardisation
Crane & Lifting standardisation
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Work group 1 Revision of standardWork program:• <strong>Lifting</strong> operations in Drilling & Well/ Sub sea lifting/ Construction lifts/ Rigging I structure• Certification of Special designed lifting accessories in D&W• Risk assessment and planning• <strong>Lifting</strong> above pressurised hydrocarbon systems and critical equipment• Role descriptions/ manning of lifting operations• Manual guiding of load, hook and use of tag line• Blind zones /crowded load deck/ danger of entangling load to boat• Sub sea lifts/ construction lifts• Certification of launching and recovery appliances for life saving equipment• Communication/ use of hand signals• Adjustments to NORSOK R-002/ NORSOK R-005/ NWEA• Human factors• Specific comments from the companies21Classification: Internal 2012-10-31